G2O Golar LNG Limited

Golar Power reaches COD at 1.5GW Sergipe Power Plant

Golar Power reaches COD at 1.5GW Sergipe Power Plant

Golar LNG Limited ("Golar") announces today that Golar Power Limited ("Golar Power"), a joint venture with Stonepeak Infrastructure Partners, has reached COD on the 1.5GW Porto de Sergipe I Power Project (the "Project").

On March 21 Golar Power received its commercial operations certificate from ANEEL (Brazilian Electricity Regulatory Agency). This allows commercial operations to commence at the 1.5GW Sergipe power station. The first integrated LNG-to-power project in Brazil and the largest and most efficient thermal power station in Latin America, the Project also includes a dedicated LNG import and regasification terminal using the Golar Nanook, a newbuild FSRU with 170,000m3 of LNG storage capable of supplying more than 21.0 million m3 per day of natural gas.

The project revolutionizes the way power is delivered to millions of people in Brazil, allowing the country to meet its growing requirement for base-load capacity using a large-scale power plant fuelled by cleaner and more reliable LNG. This important achievement will facilitate Brazil’s transition to lower-carbon energy generation sources whilst also promoting the use of LNG to balance and diversify its supply of energy.

Golar LNG (GLNG) owns 25% of the power station through its 50% investment in Golar Power. In 2015 the Project was awarded 25-year 1.5GW power purchase agreements at the government promoted A-5 Power Auction.  The power station will now start to deliver electricity to a pool of 26 power distribution companies across the country until December 2044. 

Under the terms of the PPAs, the Project has guaranteed annual capacity payments of approximately BRL1.6 billion, adjusted annually for local inflation, together with pass-through of fuel and operating costs according to dispatch. Annual revenues less forecasted operating costs are estimated at BRL1.1 billion. Revenues less forecasted operating costs over the life of the project, without inflation adjustment, are expected to amount to BRL27.5 billion, of which Golar LNG’s 25% share is BRL 6.9 billion, equivalent to USD 1.7 billion based on an average 2019 BRL/USD FX rate of 3.95. Approximately 94% of the long-term financing raised for the project is denominated in local currency (BRL).

Commencement of power plant operations also triggered the start of bareboat charter payments for the 100% Golar Power owned FSRU Golar Nanook. Annual revenues less forecasted operating costs, of $43.9 million, adjusted annually for inflation based on US CPI, are expected. Revenues less forecasted operating costs over the life of the Nanook contract without further inflation adjustment are estimated at USD1.1 billion, of which Golar LNG’s 50% share is expected to be USD549 million.  Further upside can be expected from the downstream LNG distribution business that will be developed using the significant spare capacity on board the FSRU.

Hamilton, Bermuda

March 23, 2020

Enquiries:

Golar Management Limited: 00

Eduardo Maranhao

Stuart Buchanan

EN
23/03/2020

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Golar LNG Limited

 PRESS RELEASE

Golar LNG announces successful completion of $1.2BN FLNG Gimi bank fac...

Golar LNG announces successful completion of $1.2BN FLNG Gimi bank facility Golar LNG Limited (“Golar”) is pleased to announce that it has successfully closed and drawn a new $1.2 billion asset backed debt facility agreement with a consortium of banks including ABN AMRO, Citibank, DNB, Goldman Sachs and Standard Chartered Bank for the refinancing of FLNG Gimi. The new $1.2bn bank facility replaces an existing bank facility with an outstanding amount of $627 million as at Q3 2025. The new debt facility has a 7-year tenor, 16-year amortization profile and will incur interest at SOFR plus a ...

ABGSC Shipping & Transport Research ... (+3)
  • ABGSC Shipping & Transport Research
  • Olav Bakke
  • Petter Haugen
 PRESS RELEASE

Key information relating to the cash dividend to be paid by Golar LNG ...

Key information relating to the cash dividend to be paid by Golar LNG Limited (Ticker: GLNG) Reference is made to the third quarter 2025 report released on November 5, 2025. Golar LNG Limited (“Golar”), NASDAQ ticker: GLNG, has declared a total dividend of $0.25 per share to be paid on or around November 24, 2025.  The record date will be November 17, 2025.  Due to the implementation of the Central Securities Depository Regulation (“CSDR”), please note the information below on the payment date for the small number of Golar shares registered in Norway’s central securities depository (“VPS”...

 PRESS RELEASE

Golar LNG Limited Interim results for the period ended September 30, 2...

Golar LNG Limited Interim results for the period ended September 30, 2025 Highlights and subsequent events Golar LNG Limited (“Golar” or “the Company”) reports Q3 2025 net income attributable to Golar of $31 million, Adjusted EBITDA1 of $83 million and Total Golar Cash1 of $661 million, before bond offering proceeds in October 2025. Entered the U.S. rated bond market with $500 million of 5-year 7.5% senior unsecured notes (the “Notes”) on October 2, 2025. Repaid $190 million outstanding principal balance of the $300 million 2025 maturing 2021 Unsecured Bonds on October 20, 2025. Gimi op...

ABGSC Shipping & Transport Research ... (+3)
  • ABGSC Shipping & Transport Research
  • Olav Bakke
  • Petter Haugen

ResearchPool Subscriptions

Get the most out of your insights

Get in touch