NVO Novo Resources

Novo Provides Operational Update From Beatons Creek

Novo Provides Operational Update From Beatons Creek

VANCOUVER, British Columbia, Nov. 18, 2020 (GLOBE NEWSWIRE) -- Novo Resources Corp. (“Novo” or the “Company”) (TSX-V: NVO & NVO.WT; OTCQX: NSRPF) is pleased to provide a further operational update from its Beatons Creek gold project (“Beatons Creek”) and Nullagine processing facility (“Golden Eagle Mill”).

Development at Beatons Creek and refurbishment at the Golden Eagle Mill continue to make excellent progress, on schedule and within budget. Recent key milestones achieved include:

  • Golden Eagle Mill refurbishment proceeding on schedule;
  • Mining contractor selected;
  • Ongoing grade control drilling; and
  • Site personnel (including contractors) now totaling 77.

Please see the Company’s news release dated for the Company’s previous operational update.

Mining contractor selected:

  • Iron Mine Contracting Pty Ltd (“IMCPL”) have been awarded ‘preferred contractor’ status for the surface mining contract. Mobilization planning is well underway. Mobilization of mining equipment to site is due to commence in December 2020.
  • IMCPL was selected after demonstrating strong key attributes, including:

    ○ intent to work collaboratively with Novo to optimize mining equipment, methods and costs,

    ○ cultural alignment with the Company’s approach to safety, personnel management and Aboriginal engagement.

Development activities at Beatons Creek:

Grade control program:

  • Grade control reverse circulation drilling is progressing well with high density (10m x 10m drill hole spacing and 0.5m sample interval).
  • Drilling was initially completed across an area of haul road excavation essential to providing initial haulage access.
  • Currently, drilling is being undertaken in some of the first areas to soon be excavated and stockpiled (see Figure 1 below).
  • Sample dispatches are frequently being transported to MinAnalytical for gold PhotonAssay.

Civil works:

  • Construction of laydown pads for the major contractors has commenced. It is important to note that this, and haulage road construction, are the only significant pre-development items remaining ahead of progressing works at Beatons Creek.

Refurbishment works on the Golden Eagle Mill:

Plant refurbishment:

  • Works continue on the Golden Eagle Mill maintenance and upgrades. Offsite key componentry refurbishment including screens, cyclone underpan, pumps and other minor items continues in accordance with schedule.
  • Work in the leach tanks and launders continues to plan, with water blasting, sandblasting, tank repair and baffle replacement being completed as required. Painting is now well underway with the application of high quality paint which is expected to significantly extend the life of the tanks.

Civil works:

  • The civil works contractor has mobilized to site to pour foundations for the upgraded Acacia reactor unit and for the major contractor’s workshop, in addition to remedying damaged tank bunding (see Figure 2, Figure 3, Figure 4, and Figure 5 below).

The GR Engineering Services (“GRES”) scope currently stands at approximately 35% complete, with works continuing on schedule and within budget with no material issues or problems encountered thus far.

Long lead items have all been ordered and arrival dates remain within the refurbishment schedule.

Progress on other major tenders:

  • Submissions for the Nullagine camp management services have been received and are being assessed ahead of awarding the contract by the end of November 2020.
  • The surface haulage contract package is now out for tender, in addition to numerous other commercial agreements for fuel supply, processing reagents, assay laboratory services and flights.

Novo CEO and director Rob Humphryson commented, “We are delighted to welcome IMCPL as Novo’s preferred primary mining contractor at the Nullagine Gold Project. IMCPL made a strong impression upon Novo management with their culturally aligned approach to safety, personnel management and most importantly their commitment to meaningful Aboriginal engagement. IMCPL has clearly articulated an intent to work collaboratively with Novo to optimize mining equipment, methods and costs as evidenced by mobilization of a predominantly new fleet to underpin high levels of productivity and reliability. We look forward to a long and productive relationship with IMCPL. GRES and subcontractors continue to perform an outstanding job with all works continuing safely and to plan.”

Dr. Quinton Hennigh (P.Geo.) is the qualified person pursuant to NI 43-101 responsible for, and having reviewed and approved, the technical information contained in this news release. Dr. Hennigh is President, Chairman, and a director of Novo.

About Novo Resources Corp.

Novo is advancing its flagship Beatons Creek gold project to production while exploring and developing its highly prospective land package covering approximately 14,000 square kilometres in the Pilbara region of Western Australia. In addition to the Company’s primary focus, Novo seeks to leverage its internal geological expertise to deliver value-accretive opportunities to its shareholders. For more information, please contact Leo Karabelas at (416) 543-3120 or e-mail 

On Behalf of the Board of Directors,

Novo Resources Corp.

“Quinton Hennigh”

Quinton Hennigh

President and Chairman

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Forward-looking information

Some statements in this news release contain forward-looking information (within the meaning of Canadian securities legislation) including, without limitation, the successful completion of development and plant refurbishments works on time and on budget, that Novo’s board of directors will make the decision to commence production at Beatons Creek. Forward-looking statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include, without limitation, the successful completion of site establishment works at Beatons Creek, the successful completion of grade control drilling works, MinAnalytical’s ability to assay the Company’s drill samples in a timely and cost-effective manner, the successful completion of mining, camp management, fuel supply, processing reagents, assay laboratory services, flights, and haulage services contracts, and customary risks of the resource industry.

PDFs accompanying this announcement are available at:



EN
18/11/2020

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Novo Resources

 PRESS RELEASE

Drilling Commences at Sherlock Crossing Gold-Antimony Prospect

Drilling Commences at Sherlock Crossing Gold-Antimony Prospect HIGHLIGHTS A maiden reverse circulation (RC) drilling program is underway at Sherlock Crossing in the West Pilbara, testing high-grade Au-Sb mineralisation at the historic Clarke Mine.The drill program consists of 8 holes on 4 sections for ~1,000 m RC over a strike length of 300 m. Drilling aims to define down dip continuity of high-grade veins mapped at surface, to extend mineralisation to the north and south and to potentially define plunge of the mineralising system.RC drilling is anticipated to be completed in September wit...

 PRESS RELEASE

Novo Resources Releases Updated Corporate Presentation Highlighting St...

Novo Resources Releases Updated Corporate Presentation Highlighting Strategic Progress and Growth Initiatives PERTH, Western Australia, Aug. 05, 2025 (GLOBE NEWSWIRE) -- Novo Resources Corp. (“Novo” or the “Company”) (ASX: NVO) (TSX: NVO) (OTCQB: NSRPF) is pleased to announce the release of its updated corporate presentation, now available on the Company’s website at The refreshed presentation provides a comprehensive overview of Novo’s strategic priorities, recent exploration success, project developments, and near-term catalysts. It offers investors and stakeholders clear insights i...

 PRESS RELEASE

Highlights – June Quarter 2025

Highlights – June Quarter 2025 Novo completed its maiden RC drill program at the Clone prospect as part of the Tibooburra Gold Project in May 2025 testing 500 m of strike. Drilling produced significant high-grade gold intercepts including: 12 m @ 5.90 g/t Au from 16 m, including 5 m @ 13.74 g/t Au from 23 m (TBR0001)117 m @ 2.40 g/t Au from 59 m including 9 m @ 4.14 g/t Au from 59 m (TBR0014)1Grade and width continuity has been successfully demonstrated by the RC drilling and indicates a shallow north plunge to the near-surface shoot of high-grade gold mineralisation, now defined over 300 m...

 PRESS RELEASE

Significant Results from RC Drilling at Tibooburra Gold Project

Significant Results from RC Drilling at Tibooburra Gold Project HIGHLIGHTS Novo completed its maiden drill program at the Clone prospect as part of the Tibooburra Gold Project, in May 2025. The program comprised 14 RC holes for 1,984 m, testing 500 m of strike.Drilling produced significant high-grade gold intercepts including: 12 m @ 5.90 g/t Au from 16 m, including 5 m @ 13.74 g/t Au from 23 m (TBR0001)17 m @ 2.40 g/t Au from 59 m including 9 m @ 4.14 g/t Au from 59 m (TBR0014) The peak intercept in hole TBR001 (12 m @ 5.90 g/t Au) fills a 180 m gap in previous drilling by Manhattan Corpo...

 PRESS RELEASE

Novo Announces AGM Results

Novo Announces AGM Results PERTH, Western Australia, June 24, 2025 (GLOBE NEWSWIRE) -- Novo Resources Corp. (Novo or the Company) (ASX: NVO) (TSX: NVO) (OTCQX: NSRPF) reports that all resolutions proposed to shareholders at the annual general meeting of shareholders (held on June 23, 2025 (Vancouver, BC)/June 24, 2025 (Perth, WA) were approved, including the election of all of the director nominees listed in the management information circular for the meeting. Voting as to each of the director nominees was as follows: Name of NomineeVotes Cast FOR% Votes Cast FORVotes WITHHELD% of Votes W...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch