TXSO Texas South Energy Inc

Texas South Energy Completes First well in Wilinda Project

Texas South Energy Completes First well in Wilinda Project

Houston, Texas, Oct. 16, 2018 (GLOBE NEWSWIRE) -- Texas South Energy, Inc. (OTCPK; TXSO) announced today that it has completed drilling operations on the TXSO Richter Unit 1H well to a measured depth (MD) of 9,447’ and 4,856’ True Vertical Depth (TVD) as planned and set 5 ½” production casing at 9,439’ MD.  The rig has been released and the location is being cleared and prepared for a “New Generation” high intensity frac treatment that is expected to commence in approximately 30 days based on the availability of the frac equipment and crew.  It is expected that the frac and cleanout will take seven to ten days to complete before the well begins the flow back process.  Texas South is the Operator of the Richter Unit well and owns a 25% working interest (approximately 19.75% net revenue interest) in the well.

The Austin Chalk formation was encountered at a depth of 5,320’ MD (4,670’ TVD) with a hole angle of approximately 90 degrees. The section was then drilled to the terminus at 9,447’ MD at approximately 87 ½o, generally parallel to the dip of the formation.  During the drilling of the 4,127’ lateral, multiple occasions of  flow from the formation were encountered together with lost returns, both of which are typical when drilling the naturally fractured Austin Chalk limestone.  The flows from  the formation were all contained and flared, with flare heights of  15’ to 30’.  The flares were interpreted as oil and gas bearing with no apparent saltwater. No rate or volume estimates were made.

The TXSO Richter 1H is the first well drilled and completed in the Wilinda area for Texas South. Together with its partners, the Company currently has leases and commitments on over 4,400’ acres in the Wilinda play.  Nearby similarly completed horizontal wells in the Austin Chalk play have been drilled on 40 acre per well spacing. Based on this spacing, up to 110 additional wells could be drilled on the current leasehold alone.  The Company will determine its initial spacing plan for this area after evaluating the results of the upcoming frac operation.

About Texas South Energy

Texas South is engaged in the oil and gas exploration and production business. We generate, acquire and prefer to operate large-scale onshore and offshore oil and gas projects, retaining as much interest as possible in the production and reserves. To learn more, visit the Texas South website at .

Investor Contacts:

Texas South Energy
John B. Connally III, Chairman, or Michael J. Mayell, President and CEO
Phone: 713-820-6300
Email:  

SOURCE: Texas South Energy, Inc.
EN
16/10/2018

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Texas South Energy Inc

 PRESS RELEASE

Texas South Energy Updates Wilinda Project Status

Texas South Energy Updates Wilinda Project Status Houston, Texas, June 13, 2019 (GLOBE NEWSWIRE) -- Texas South Energy, Inc. (OTCPK; TXSO) announced today that it has temporarily discontinued flowback operations on the TXSO Richter 1H well in Wilson County.  The Richter 1H well was drilled to 9,447’ with approximately a 4,100’ horizontal lateral.  The well was designed to develop the matrix porosity section near the top of the Austin Chalk formation and was completed and frac’d in late 2018. The flowback operations revealed that the well evidently frac’d down a previously concealed f...

 PRESS RELEASE

Texas South Energy Completes First well in Wilinda Project

Texas South Energy Completes First well in Wilinda Project Houston, Texas, Oct. 16, 2018 (GLOBE NEWSWIRE) -- Texas South Energy, Inc. (OTCPK; TXSO) announced today that it has completed drilling operations on the TXSO Richter Unit 1H well to a measured depth (MD) of 9,447’ and 4,856’ True Vertical Depth (TVD) as planned and set 5 ½” production casing at 9,439’ MD.  The rig has been released and the location is being cleared and prepared for a “New Generation” high intensity frac treatment that is expected to commence in approximately 30 days based on the availability of the frac equipment...

 PRESS RELEASE

Texas South Energy Announces Offshore Tau Prospect Status

Texas South Energy Announces Offshore Tau Prospect Status HOUSTON, TX, Sept. 14, 2018 (GLOBE NEWSWIRE) -- Texas South Energy, Inc. (OTC PINK: TXSO) ("Texas South" or the “Company”) announced today that the Tau Prospect in Ship Shoal, South Addition  Blocks 336 and 351 was spudded on September 14, 2018 with the Rowan Ralph Coffman jack-up drilling rig.  The Tau Prospect is the first in a series of sub-salt exploratory wells in which Texas South is participating with GulfSlope Energy, Inc., the Operator, and Delek GOM Investments LLC, a subsidiary of Delek Group Ltd.  Texas South has a 5% w...

 PRESS RELEASE

Texas South Energy Announces Wilinda Project Status

Texas South Energy Announces Wilinda Project Status HOUSTON, TX, Sept. 12, 2018 (GLOBE NEWSWIRE) -- Texas South Energy, Inc. (OTC PINK: TXSO) ("Texas South" or the “Company”) announced today that it has moved in the drilling rig and spudded the TXSO Richter Unit 1H well at its Wilinda Project in Wilson County, Texas. The Richter Unit well is a 5,000’+/- vertical depth horizontal Austin Chalk test well with a 4,350’+/- horizontal lateral. Texas South is the Operator of the well with a 25% working interest and currently has approximately 4,250 acres under lease in the area. The Wilinda Proj...

 PRESS RELEASE

Texas South Announces Status of Offshore Gulf of Mexico Program

Texas South Announces Status of Offshore Gulf of Mexico Program HOUSTON, TX, Aug. 28, 2018 (GLOBE NEWSWIRE) -- Texas South Energy, Inc. (OTC PINK: TXSO) (“Texas South” or the “Company”) announced today that the OCS-G-35589 # 1 well on the Company’s Canoe Prospect on Vermilion Block 378 where the Company holds a 5% working interest has been drilled and evaluated to a total depth of 5,765’ MD (5,700’ TVD).  Based on Logging-While-Drilling (LWD) and other test results, oil bearing sands were encountered which require further study.  As a result, multiple open-hole plugs will be set across se...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch