ATV. Alto Ventures Ltd.

Alto Reports Drilling Results from Miner Lake, Ontario

Vancouver, British Columbia--(Newsfile Corp. - November 14, 2018) - Alto Ventures Ltd. (TSXV: ATV) has received results from the 1,010 m diamond drill program completed on the Miner Lake project in the Beardmore-Geraldton gold camp in Ontario. A total of five holes were drilled to further test the main East-West mineralized corridor as well as other targets on the property (see Figure 1). The current program continues to build on Alto's previous work that identified persistent anomalous gold mineralization in widespread breccia zones hosted by feldspar porphyritic diorite. Chlorite altered gold-bearing breccia zones associated with feldspar porphyritic diorite were intersected in each of the 2018 holes, with gold values ranging from under 0.002 g/t to 4.48 g/t/ Au in individual samples.

"Results from the current program are encouraging" commented Rick Mazur, CEO and Director of Alto. He adds, "The persistent and widespread distribution of gold in the numerous breccia zones in feldspar porphyritic diorite has confirmed the presence of a large gold mineralizing system on the property. Gold mineralization is getting stronger to the west and requires further drilling."



Figure 1 Miner Lake Compilation and 2018 DDHs

To view an enhanced version of Figure 1, please visit:

MIN18-10 was drilled 50 m west of the 2011 hole MIN11-07 to test the mineralized horizon 50 m deeper than MIN11-07. The drill hole intersected wide zones containing geochemically anomalous gold assaying from tens of ppb to hundreds ppb including the higher assay intervals presented in Table 1. MIN18-11 was drilled 50 m west of MIN11-06 and tested for mineralization 50 m deeper than MIN11-06. This hole also contains zones of geochemically anomalous values with intervals of higher concentrations as presented in Table 1 including 1.5 m averaging 4.48 g/t Au. MIN18-11 is the westernmost hole on this trend and mineralization remain open and untested to the west.

MIN18-12 and 13 tested the southern extent of the main E-W mineralized corridor approximately 800 m east of MIN18-10. The holes cut wide zones of shearing and weak to moderate chlorite and sericite alteration within feldspar porphyritic diorite and mafic volcanic rocks. Geochemically anomalous gold values were obtained from several sections within these holes but not as persistent as in MIN18-11 and 12. The higher gold values are presented in Table 1.

MIN18-14 was drilled approximately 0.5 km north of the main E-W mineralized corridor to test a second corridor of gold occurrences which trends parallel to the main E-W corridor. This hole also intersected geochemically anomalous gold throughout the hole including a more focused section of higher gold concentrations from 117.5 m to 139.5 m averaging 0.23 g/t Au over 22.0 m. The gold anomalies in this hole are associated with chlorite-altered breccia zones associated with feldspar porphyritic diorite similar to the geology and mineralization in MIN18-10 and 11.

A summary of the downhole intervals containing higher gold values are presented in Table 1.

Table 1 - Miner Lake 2018 DDH Anomalous Au Intervals*

MIN18-10From (m)To (m)Interval (m)Au (g/t)

50.755.24.50.379

117121.54.50.259

1501533.01.03

160.5175.515.00.48





MIN18-11




155.1159.64.50.272

170.1173.13.02.57
includes171.6173.11.54.48

183.6184.110.50.36





MIN18-125960.51.50.941





MIN18-13156.51581.50.346





MIN18-14117.5139.522.00.23

 

*The intervals reported are down-hole lengths as there is insufficient drilling density to determine the true widths. Mineralized zones generally start at 0.1 g/t gold and assay averages may include minimal intervals of waste material. No top cuts of assays were used.

Drilling by Alto in 2011 intersected significant gold mineralization in hole MIN11-06 including a 39.2 m wide zone averaging 0.6 g/t gold followed by a second zone averaging 0.385 g/t Au over 10.5 m (see Alto news release dated October 18, 2011). Hole MIN11-07, located 100 m east of MIN11-06, intersected 38.5 m averaging 0.483 g/t Au in an upper zone and a second zone averaging 0.259 g/t Au over 17.0 m. Anomalous gold occurs with disseminated and veinlet-controlled sulphides including pyrrhotite, chalcopyrite and pyrite within zones of chlorite altered hydrothermal breccia and brittle-ductile faulting associated with feldspar porphyritic diorite. These gold intercepts and breccia zones occur along the main E-W mineralized corridor that extends for over one km as is known now and it is open on strike to the east and west.

Quality Assurance/ Quality Control

Core processing included descriptive logging and selection of samples for analyses. The BTW-size cores were sawed in half and one half was delivered to AGAT Laboratories in Thunder Bay, Ontario where they were crushed and a 250 gram pulp was prepared. The pulp was then assayed for gold. The gold assaying method uses an industry standard Fire Assay with AA finish technique on a 30 gram aliquot taken from the 250 gm pulp (AGAT method codes 202-051). Commercially prepared standards were inserted by Alto at predetermined intervals to ensure precision of the results. The laboratory performed routine repeat check assays on pulps of selected samples to ensure internal lab quality control.

Alto's President, Mike Koziol, P. Geo. is a qualified person under the provisions of National Instrument 43-101 and approves the technical data and conclusions in this news release.

About Alto Ventures Ltd

Alto Ventures Ltd. is an exploration and development company with a portfolio of highly prospective Canadian gold properties. The Company is active in the Abitibi greenstone belt in Quebec on the Destiny gold property and is exploring in the Beardmore-Geraldton gold belt in Ontario. For more details regarding the Company's projects, please visit our website at .

ON BEHALF OF THE BOARD,

Richard J. Mazur, P. Geo.,
CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information contact:

Mike Koziol,
President and Director
ALTO VENTURES LTD.
Unit 7 - 1351C Kelly Lake Rd
Sudbury, ON., P3E 5P5
Tel: 705-522-6372
Email:

Rick Mazur,
CEO and Director
ALTO VENTURES LTD.
Suite 615-800 W. Pender Street
Vancouver, BC, V6C 2V6
Tel: 604-689-2599
Email:

EN
14/11/2018

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Alto Ventures Ltd.

 PRESS RELEASE

Alto Appoints CFO and Grants Stock Options

Vancouver, British Columbia--(Newsfile Corp. - September 1, 2020) - Alto Ventures Ltd. (TSXV: ATV) ("Alto" or the "Company") is pleased to announce that Jim Kirke has been appointed as Chief Financial Officer of the Company, effective immediately. Mr. Kirke is a seasoned professional with significant experience in the mining sector. "Jim's appointment comes at an integral time for Alto Ventures", said Mike Bandrowski, Chief Executive Officer. "His financial experience in the mining sector strengthens the company's management team and brings a large knowledge base that will significantly add to...

 PRESS RELEASE

Alto Announces Changes in Management and Conversion of Subscription Re...

Vancouver, British Columbia--(Newsfile Corp. - July 15, 2020) -  Alto Ventures Ltd. (TSXV: ATV) ("Alto" or the "Company"), announces that, in conjunction with the closing of its merger (the "Merger") with Empress Resources Corp. ("Empress") as detailed in its news release of July 7, 2020, the following changes to its director and officers effective July 7, 2020:Mike Koziol, David Cowan, Gary Zak and Michael Steeves have resigned as directors. David Cowan will continue as Corporate Secretary;Mike Koziol has resigned as President of Alto and Richard Mazur has resigned as Chief Executive Officer,...

 PRESS RELEASE

Empress and Alto Announce Closing of Merger

Vancouver, British Columbia--(Newsfile Corp. - July 7, 2020) - Empress Resources Corp. (TSXV: EMPX) ("Empress") and Alto Ventures Ltd. (TSXV: ATV) ("Alto") are pleased to announce that their previously announced merger (the "Arrangement") has closed. Effective at the close of business on July 7, 2020 Empress will be delisted from the TSX Venture Exchange as a result of the Arrangement.Under the Arrangement, Alto acquired all of the issued and outstanding common shares of Empress (each, an "Empress Share") in exchange for approximately one common share of Alto (each, an "Alto Share"), in respe...

 PRESS RELEASE

Alto Announces Closing of Agreement with Empress Royalty Corp., Result...

Vancouver, British Columbia--(Newsfile Corp. - July 2, 2020) -  Alto Ventures Ltd. (TSXV: ATV) ("Alto" or the "Company"). Further to its earlier news release of March 6, 2020 (the "March 6 Release"), Alto announces that it closed the sale of a collection of royalties and a portfolio of marketable securities, as detailed in Alto's March 31, 2020 financial statements, to Empress Royalty Corp. ("Empress Royalty") in exchange for 4,615,384 shares of Empress Royalty. As set out in Alto's news release of June 29, 2020, the shares of Empress Royalty received by Alto are to be distributed to the share...

 PRESS RELEASE

Alto Advised of Special Meeting of Empress Shareholders

Vancouver, British Columbia--(Newsfile Corp. - June 1, 2020) -  Alto Ventures Ltd. (TSXV: ATV) ("Alto" or the "Company") is pleased to provide an update on the status and timing of the arrangement to be effected pursuant to the Business Corporations Act (British Columbia) (the "Arrangement") involving Empress Resources Corp. ("Empress") and Empress's wholly-owned subsidiary, Empress Royalty Corp. ("Empress Royalty").Special Meeting of Empress Shareholders and Warrantholders & Interim OrderAlto is advised that Empress has set the date for the special meeting of its shareholders and warrantholde...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch