MONTREAL, May 09, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to report continued operational progress at its Zgounder Silver Mine, driven by a strong mine ramp up, exceptional mill performance, a clear path to improve recovery, and solid April production.

April Production Metrics

Production Metrics Q1-2024Q1-2025April 2025
Silver productionoz366,3621,068,652345,550
Tonnage processedkt81,331249,74390,763
Silver recovery%828280
Mill availability%969198
Mine productiont106,880194,66182,496



Operational Highlights

  • Mine ramp-up continues to exceed expectations, with 2,750 tonnes per day (“tpd”) mined in April 2025.
  • Mill throughput and availability in April are above expectations, averaging 3,025 tpd at 98% availability.
  • Recovery rates have improved in May.
  • Clear path to 89% recoveries identified with corrective actions underway, focused on stabilizing and optimizing oxygen production.

Key Actions Underway

  • Specialized contractor mobilized onsite to restore full capacity of the oxygen plant, with improvements expected over the coming weeks.
  • Direct collaboration was initiated with the oxygen plant equipment supplier, to fast-track long-term performance enhancements.
  • Once the oxygen plant reaches designed capacity, it is expected that recoveries will improve to reach feasibility study recovery rates.
  • Conclusive tests conducted on plant tailings to confirm feasibility study leaching parameters.

“Our fundamentals are strong, the ramp up is on track, and the results are showing — mine production is up 64% since January,” said Benoit La Salle, President and CEO. “We’ve seen a recovery improvement in May, and April’s performance confirms that we’re maximizing throughput, strengthening free cash flow, and driving down costs. We are pleased to reaffirm our 2025 guidance.”

Outlook

As the ramp-up progresses, April’s solid production marks an important step forward. Our focus is on attaining consistent performance and delivering sustained recovery improvements at Zgounder.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and is exploring its properties along the prospective South-Atlas Fault, several of which have hosted past-producing mines and historical resources.

Aya’s management team has been focused on maximizing shareholder value by anchoring sustainability at the heart of its operations, governance, and financial growth plans.

For additional information, please visit Aya’s website at .

Or contact 
Benoit La Salle, FCPA, MBA

President & CEO

Alex Ball

VP, Corporate Development & IR

  

Forward-Looking Statements

This press release contains certain statements that constitute forward-looking information within the meaning of applicable securities laws (“forward-looking statements”), which reflects management’s expectations regarding Aya’s future growth and business prospects (including the timing and development of new deposits and the success of exploration activities) and other opportunities. Wherever possible, words such as “momentum”, “improve”, “expectation”, “budget”, “expect”, “track”, “confirm”, “maximize”, “strengthen”, “drive down”, “guidance”, “continue”, “significant”, “increase”, “confirm”, “growth”, and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been used to identify such forward-looking information. Specific forward-looking statements in this press release include, but are not limited to, statements and information with respect to the production, production capacity, availabilities, throughput, milling and mining rates and capacities, recoveries and recovery rates, timing associated with improving any of the foregoing, as well as the Corporations’ guidance. Although the forward-looking information contained in this press release reflect management’s current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, Aya cannot be certain that actual results will be consistent with such forward-looking information. Such forward-looking statements are based upon assumptions, opinions and analysis made by management in light of its experience, current conditions, and its expectations of future developments that management believe to be reasonable and relevant but that may prove to be incorrect. These assumptions include, among other things, the capacity to stabilise or improve production, production capacity, mining or milling rates, throughput, availabilities, and recoveries, the capacity to stabilize or improve any of the foregoing, the capacity to obtain results described in the feasibility study and the capacity for the Corporation to meet its guidance, the ability to obtain any requisite governmental approvals, obtaining regulatory permits for on-site work, importing goods and machinery and employment permits, the accuracy of Mineral Reserve and Mineral Resource Estimates (including, but not limited to, ore tonnage and ore grade estimates), the price of silver, the price of gold, exchange rates, fuel and energy costs, future economic conditions, anticipated future estimates of free cash flow, and courses of action. Aya cautions you not to place undue reliance upon any such forward-looking statements.

The risks and uncertainties that may affect forward-looking statements include, among others: the inherent risks involved in exploration and development of mineral properties, including government approvals and permitting, changes in economic conditions, changes in the worldwide price of silver gold and other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being affected by metallurgical characteristics) and other factors, such as project execution delays, many of which are beyond the control of Aya, as well as other risks and uncertainties which are more fully described in Aya’s 2024 Annual Information Form dated March 31, 2025, and in other filings of Aya with securities and regulatory authorities which are available on SEDAR+ at Aya does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs, and opinions change. Nothing in this document should be construed as either an offer to sell or a solicitation to buy or sell Aya securities. All references to Aya include its subsidiaries unless the context requires otherwise.



EN
09/05/2025

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Aya Gold and Silver

 PRESS RELEASE

Aya Gold & Silver Files Preliminary Economic Assessment Technical Repo...

Aya Gold & Silver Files Preliminary Economic Assessment Technical Report for Boumadine Project MONTREAL, Dec. 18, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce that it has filed a technical report presenting the Preliminary Economic Assessment ("PEA") for the Boumadine Polymetallic Project (the “Project” or “Boumadine”), located in the Kingdom of Morocco, with an effective date of November 4, 2025 (the “Report”). The PEA was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mi...

 PRESS RELEASE

Aya Gold & Silver Files Updated Technical Report for the Zgounder Silv...

Aya Gold & Silver Files Updated Technical Report for the Zgounder Silver Mine MONTREAL, Dec. 16, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce the filing of an updated NI 43-101 Technical Report for the Zgounder Deposit (“Zgounder”) (the “Technical Report”). The Technical Report includes updated Proven & Probable Mineral Reserves (“P&P Reserves”), and Mineral Resource Estimate (“MRE” or “Mineral Resource Estimate”), along with an accompanying updated Life of Mine (“LOM”) plan. The Mineral Resource Estimate con...

 PRESS RELEASE

Aya Gold & Silver Reports High-Grade Silver Results at Zgounder

Aya Gold & Silver Reports High-Grade Silver Results at Zgounder MONTREAL, Dec. 09, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce additional high-grade silver drill results from its at-depth drill exploration program at the Zgounder Silver Mine in the Kingdom of Morocco. Highlights (all intersections are in core lengths) Intersections in the open-pit area: Hole ZG-RC-25-478 intercepted 677 grams per tonne (“g/t”) silver (“Ag”) over 15.0 metres (“m”), including 2,138 g/t Ag over 3.0mHole DZG-SF-25-7...

 PRESS RELEASE

Aya Gold & Silver Reports Best Ever Mineral Intercept at Boumadine and...

Aya Gold & Silver Reports Best Ever Mineral Intercept at Boumadine and Identifies New High-Grade Parallel Structure MONTREAL, Nov. 26, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce its strongest mineralized intercept to date, featuring a long, high-grade interval that results in a record metal factor, alongside the identification of a new high-grade parallel structure, both from the ongoing 2025 drill program at Boumadine in the Kingdom of Morocco. The results, several of which sit outside the current PEA pit s...

 PRESS RELEASE

Aya Gold & Silver Unlocks Near-Term Value and Advances Environmental R...

Aya Gold & Silver Unlocks Near-Term Value and Advances Environmental Remediation with Sale of Precious Metals from Legacy Boumadine Stockpile MONTREAL, Nov. 19, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce the start of commercial production from a historical flotation stockpile of precious metal rich pyrite concentrate, located within its Boumadine mining license. Recovering these metals will help reduce the environmental footprint of past operations, support rehabilitation of the area, and generate positive c...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch