Highlighted by 52 metres at 0.61% CuT and 20 metres at 0.90% CuT

VANCOUVER, British Columbia, April 11, 2019 (GLOBE NEWSWIRE) -- Coro Mining Corp. (“Coro” or the “Company”) (TSX: COP) is pleased to announce an update for the Company’s Marimaca Project in the Antofagasta Region of Chile.

An additional and final batch of 15 RC holes for 3,170 metres has been completed at the Atómica section of Marimaca, bringing the total to 79 holes for 18,270 metres. The results confirm both the south and southwest extension of the mineralization and the prominent north-south oriented feeder type structures extending north into the Atahualpa section.

Highlights

Results from the additional drilling to confirm the south-southwest extension of mineralization include:

Hole LAR-70

  • From 70 to 84 metres, 14 metres of copper oxide mineralization averaging 1.12% CuT

Hole LAR-71

  • From 6 to 38 metres, 32 metres of copper oxide mineralization averaging 0.60% CuT.

Results from the additional drilling to confirm the north-south feeder type structures include:

Hole LAR-79

  • From 52 to 104 metres, 52 metres of copper oxide mineralization averaging 0.61% CuT,

    including from 52 to 72 metres of copper oxide mineralization averaging 0.95% CuT.

Hole LAR-82

  • From 122 to 134 metres, 12 metres of copper oxide mineralization averaging 0.90% CuT.

Hole LAR-84

  • From 2 to 40 metres, 38 metres of copper oxide and mixed mineralization averaging 0.58% CuT.

Commenting on the results, Sergio Rivera, VP of Exploration said: “The initially planned drilling campaign in the La Atómica section of the project was expanded in terms of number of drill holes and metres as it became apparent that the mineralized area was larger than anticipated. We anticipate that the now completed La Atómica drilling program should result in a significant increase in the overall resource base of the Marimaca project.”

Further Information

These drill holes represent the third and final batch from La Atómica.  15 RC drill holes were completed totalling 3,170 metres: 9 holes to test for the south-southwest extension of mineralisation, and 6 holes to confirm the north-south feeder structures stretching to Atahualpa.  In total at La Atómica 79 holes for a total 18,270 metres have been completed, approximately 50% more than originally envisaged.  The extra costs associated with the additional drilling have been accommodated because the realised drilling costs were lower than budgeted and some contingencies were drawn down.

The latest drill results have confirmed the south and south-west extension of the mineralization at La Atómica along an additional 400 x 100 metre west-northwest trending area.  The results have also provided further definition of the western limit of the Marimaca deposit.

Additionally, the east-west 270° oriented holes confirmed the existence of prominent north-south oriented high-grade feeder type structures that extend further north towards Atahualpa.

A photo accompanying this announcement is available at

Sampling and Assay Protocol

True widths cannot be determined with the information available at this time. Coro RC holes were sampled on a 2-metre continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assay preparation laboratory in Calama and the pulps then sent to the same company laboratory in Santiago for assaying. A second quarter was stored on site for reference. Samples were prepared using the following standard protocol: drying; crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-700g subsample to 95% passing -150#; and a 125g split of this sent for assaying. All samples were assayed for CuT (total copper), CuS (acid soluble copper), CuCN (cyanide soluble copper) by AAS and for acid consumption. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results. Pulps and sample rejects are stored by Coro for future reference.

Figure 2: Atahualpa Intersections

HoleTD (m) FromTom%CuTType
LAR-70250 1646300.33Oxide
   5092420.49Oxide
  including7084141.12Oxide
   194226320.31Mixed
  including194204100.64Mixed
LAR-71250 638320.60Oxide
  and20621260.55Oxide
LAR-72350 152186340.44Oxide
   2003041040.44Oxide - Enriched - Mixed
  Including200212120.46Oxide
  and218246280.79Oxide - Enriched
   278294160.67Oxide - Mixed
LAR-73270No Significant Results
LAR-74250 6888200.44Oxide
   100114140.34Oxide
   228240120.30Enriched
LAR-75250 86120340.21Oxide
   17418280.34Oxide
        
LAR-76200No Significant Results
LAR-77150No Significant Results
LAR-78150No Significant Results
LAR-79250 52104520.61Oxide
  including5272200.95Oxide
LAR-80250 5482280.28Oxide
   94122280.31Oxide
   18819680.90Oxide
LAR-81200 2032120.22Oxide
  and9410280.38Oxide
LAR-82200 122134120.90Oxide - Primary
  and156176200.27Primary - Oxide
LAR-8360 018180.37Oxide
LAR-8490 278760.41Oxide
  including240380.58Oxide
  and6272100.33Oxide

Figure 3: Atahualpa Drill Collars

HoleEastingNorthingElevationAzimuthInclinationDepth
LAR-70374756.57435398.71053.3310-60250
LAR-71374759.47435393.01053.6220-60250
LAR-72374695.77435314.61048.6310-60350
LAR-73374706.77435311.21048.8220-60270
LAR-74374820.47435339.71065.3310-60250
LAR-75374824.47435334.51065.4220-60250
LAR-76374529.27435438.61027.8310-60200
LAR-77374530.27435430.91028.0220-60150
LAR-78374768.77435268.91050.9310-60150
LAR-79374842.37435824.91068.0270-60250
LAR-80374797.47435858.81062.2270-60250
LAR-81374703.77435856.41021.9270-60200
LAR-82374630.47435876.91011.0270-60200
LAR-83374767.37435959.8999.0270-6060
LAR-84374721.07435960.9996.9270-6090

Qualified Persons

The technical information in this news release, including the information that relates to geology, drilling and mineralization of the Marimaca Phase I and II exploration program was prepared under the supervision of, or has been reviewed by Sergio Rivera, Vice President of Exploration, Coro Mining Corp, a geologist with more than 36 years of experience and a member of the Colegio de Geologos de Chile and of the Institute of Mining Engineers of Chile, and who is the Qualified Person for the purposes of NI 43-101 responsible for the design and execution of the drilling program.

Contact Information

For further information please visit or contact:

Nicholas Bias, VP Corporate Development & Investor Relations

Cell:       +44 (0)7771 450 679

Office:  

Email:  

Forward Looking Statements

This news release includes certain “forward-looking statements” under applicable Canadian securities legislation.  These statements relate to future events or the Company’s future performance, business prospects or opportunities. Forward-looking statements include, but are not limited to, statements regarding the future development and exploration potential of the Marimaca Project. Actual future results may differ materially. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by Coro, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the inherent risks involved in the mining, exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project delays or cost overruns or unanticipated excessive operating costs and expenses, uncertainties related to the necessity of financing, the availability of and costs of financing needed in the future as well as those factors disclosed in the Company’s documents filed from time to time with the securities regulators in the Provinces of British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland and Labrador. Accordingly, readers should not place undue reliance on forward-looking statements. Coro undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.

EN
11/04/2019

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Coro Mining Corp

 PRESS RELEASE

Marimaca Makes New Shallow Oxide Copper Discovery at Mercedes

Marimaca Makes New Shallow Oxide Copper Discovery at Mercedes VANCOUVER, British Columbia, Sept. 08, 2021 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to announce that reverse circulation (“RC”) drilling completed at the Mercedes Target (“Mercedes”), has intersected significant oxide copper mineralization from surface, with an initial area of interest measuring 400m along strike and 300m width. A total of 17 holes were completed of which 12 intersected mineralization. Mercedes is located less than 1km to the north of the northern ed...

 PRESS RELEASE

UPDATE -- Marimaca Extends Strike Potential at Cindy

UPDATE -- Marimaca Extends Strike Potential at Cindy VANCOUVER, British Columbia., July 14, 2021 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to announce that drilling results from the remaining reverse circulation (“RC”) drill holes, completed at the Cindy Target (“Cindy”), have intersected significant copper mineralization, extending the strike length to over 800m. Cindy is located less than 5km to the north of the Marimaca Oxide Deposit (“MOD”) and offers potential to add to the Company’s leachable resource base and extend mine l...

 PRESS RELEASE

Marimaca’s Roble Target Continues to Show Significant Potential

Marimaca’s Roble Target Continues to Show Significant Potential VANCOUVER, British Columbia, July 01, 2021 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to provide an update on the ongoing exploration work being completed, ahead of drilling, at the Roble Target (“Roble”). Roble is located less than 3km to the northeast of the Company’s flagship Marimaca Oxide Deposit (“MOD”), and mineralization may extend over 3km of potential strike. The commencement of drilling at Roble has been delayed primarily because the Company elected to expa...

 PRESS RELEASE

Marimaca Intersects Significant Near Surface Copper Oxides at Cindy

Marimaca Intersects Significant Near Surface Copper Oxides at Cindy VANCOUVER, British Columbia, June 15, 2021 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to announce that two holes of an initial nine-hole, wide spaced, reverse circulation drilling campaign completed at the Cindy Target (“Cindy”) have intersected significant near surface copper oxide mineralization. Cindy is located less than 5km to the north of the Marimaca Oxide Deposit (“MOD”) and offers potential to add to the Company’s leachable resource base and extend mine l...

 PRESS RELEASE

Marimaca Announces Results From Annual General Meeting

Marimaca Announces Results From Annual General Meeting VANCOUVER, British Columbia, May 28, 2021 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to report that all of its incumbent directors were re-elected at its annual general meeting of shareholders, held virtually via webcast on Thursday, 27 May 2021 (the “Meeting”). Below are the detailed results of the votes cast by ballot (including votes cast by proxy) at the Meeting on the election of the Company’s directors.  VOTES FOR  VOTES WITHHELD PERCENTAGE OF VOTES FORHayden Locke52,138...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch