CXB Calibre Mining

Calibre Intercepts High-Grade Gold & Silver Mineralization from Several Targets at its Eastern Borosi Mine Complex; Drilling Intersects Include 10.81 g/t Gold over 3.4 metres, 9.64 g/t Gold over 3.3 metres, 1,431.6 g/t Silver over 2.9 metres and 642.3 g/t

Calibre Intercepts High-Grade Gold & Silver Mineralization from Several Targets at its Eastern Borosi Mine Complex; Drilling Intersects Include 10.81 g/t Gold over 3.4 metres, 9.64 g/t Gold over 3.3 metres, 1,431.6 g/t Silver over 2.9 metres and 642.3 g/t Silver over 5.0 metres

VANCOUVER, British Columbia, April 15, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the “Company” or “Calibre”) is pleased to announce drill results from its 2023 resource conversion and expansion program within its 176 km2 Eastern Borosi Mine Complex (“Eastern Borosi”) located in northeastern Nicaragua, adjacent to a larger, 100%-owned, prolific 7,281 km2 Atlantic Mineral Concession package.

Gold highlights from the Eastern Borosi drill program

  • 6.87 g/t Au over 7.0 metres Estimated True Width (“ETW”) including 19.80 g/t Au over 1.1 metres ETW and 6.08 g/t Au over 3.8 metres ETW in Hole BL-23-118;
  • 5.72 g/t Au over 8.9 metres ETW including 8.21 g/t Au over 4.8 metres ETW and 7.50 g/t Au over 1.3 metres ETW in Hole BL-23-131;
  • 8.46 g/t Au over 5.8 metres ETW including 14.80 g/t Au over 2.9 metres ETW in Hole BL-23-133;
  • 7.06 g/t Au over 17.7 metres ETW including 14.70 g/t Au over 3.3 metres ETW and 12.69 g/t Au over 3.4 metres ETW and 8.92 g/t Au over 2.3 metres ETW in Hole BL-23-136;
  • 10.81 g/t Au over 3.4 metres ETW including 19.10 g/t Au over 1.8 metres ETW in Hole BL-23-143;
  • 9.64 g/t Au over 3.3 metres ETW in Hole BL-16-044; and
  • 5.77 g/t Au over 14.5 metres ETW including 14.00 g/t Au over 3.8 metres ETW and 10.00 g/t Au over 2.2 metres ETW in Hole GTH-BL-23-006.

Silver highlights from the Eastern Borosi drill program

  • 1,431.6 g/t Ag over 2.9 metres ETW including 1,240.5 g/t Ag over 1.4 metres ETW in Hole BL-15-018;
  • 642.3 g/t Ag over 5.0 metres ETW including 1,014 g/t Ag over 2.0 metres ETW in Hole BL-15-017;
  • 401.8 g/t Ag over 3.5 metres ETW including 925.0 g/t Ag over 1.3 metres ETW in Hole BL-23-111;
  • 318.1 g/t Ag over 1.5 metres ETW in Hole BL-23-112;
  • 307.3 g/t Ag over 2.7 metres ETW in Hole BL-23-115;
  • 227.0 g/t Ag over 9.0 metres ETW including 247.8 g/t Ag over 4.8 metres ETW and 437.0 g/t Ag over 1.3 metres ETW in Hole BL-23-131; and
  • 181.9 g/t Ag over 2.8 metres ETW including 288.5 g/t Ag over 1.7 metres ETW and 162.6 g/t Ag over 5.8 metres ETW including 225.2 g/t Ag over 2.9 metres ETW in Hole BL-23-133.

Note: Estimated True Widths for reported vein intercepts are based on 3D models of individual veins. Estimates are determined in cross-section by measuring the modelled vein thickness perpendicular to the vein margins and through the midpoint of the drill hole intercept. Percentage-based differences between individual ETWs and down-hole interval lengths will vary between drill holes depending on drill hole inclination, variations in vein strike and dip, and overall geometries of the different vein systems.

Darren Hall, President and Chief Executive Officer of Calibre, stated: “These drill results at Eastern Borosi reinforce the potential for discovery and resource expansion within the 176 km2 Eastern Borosi land package. Moreover, the exceptionally high silver grades demonstrate further potential to capture additional value in the future. During the second quarter of 2023, Calibre achieved a significant milestone as we commenced mining from our high-grade Guapinol open pit (see ). Today’s high-grade results, combined with the established Mineral Resource base at Eastern Borosi and the potential for mine life extension at our Guapinol operation, confirm the significant mineral endowment of the district. In addition, the 7,281 km2 Atlantic Mineral Concessions are at an early stage but have high potential for the discovery of both epithermal gold-silver and porphyry copper-gold mineral systems.”

Link 1

Link 2

Quality Assurance/Quality Control 

Calibre maintains a Quality Assurance/Quality Control ("QA/QC") program for all its exploration projects using industry best practices. Key elements of the QA/QC program include verifiable chain of custody for samples, regular insertion of certified reference standards and blanks, and duplicate check assays. Drill core is halved and shipped in sealed bags to Bureau Veritas in Managua, Nicaragua, an independent analytical services provider with global certifications for Quality Management Systems ISO 9001:2008, Environmental Management: ISO14001 and Safety Management OH SAS 18001 and AS4801. Prior to analysis, samples are prepared at Veritas’s Managua facility and then shipped to its analytical facility in Vancouver, Canada. Gold analyses are routinely performed via fire assay/AA finish methods. For greater precision of high-grade material, samples assaying 10 g/t Au or higher are re-assayed by fire assay with a gravimetric finish. Analyses for silver and other elements of interest are performed via Induction Coupled Plasma (ICP).

Qualified Person 

The scientific and technical information contained in this news release was approved by David Schonfeldt P.GEO, Calibre Mining’s Corporate Chief Geologist and a "Qualified Person" under National Instrument 43-101.

About Calibre 

Calibre is a Canadian-listed, Americas focused, growing mid-tier gold producer with a strong pipeline of development and exploration opportunities across Newfoundland & Labrador in Canada, Nevada and Washington in the USA, and Nicaragua. Calibre is focused on delivering sustainable value for shareholders, local communities and all stakeholders through responsible operations and a disciplined approach to growth. With a strong balance sheet, a proven management team, strong operating cash flow, accretive development projects and district-scale exploration opportunities Calibre will unlock significant value.

ON BEHALF OF THE BOARD

“Darren Hall”

Darren Hall, President & Chief Executive Officer

For further information, please contact:

Ryan King

SVP Corporate Development & IR

T: 604.628.1012

E:

W:   

Calibre’s head office is located at Suite 1560, 200 Burrard St., Vancouver, British Columbia, V6C 3L6.

 /  /  / 

The Toronto Stock Exchange has neither reviewed nor accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Note Regarding Forward Looking Information

This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian securities legislation. All statements in this news release that address events or developments that we expect to occur in the future are forward-looking statements. Forward-looking statements are statements that are not historical facts and are identified by words such as "expect", "plan", "anticipate", "project", "target", "potential", "schedule", "forecast", "budget", "estimate", "intend" or "believe" and similar expressions or their negative connotations, or that events or conditions "will", "would", "may", "could", "should" or "might" occur. Forward-looking statements in this news release include, but are not limited to: the Company’s expectations toward higher grades mined and processed going forward; statements relating to the Company’s 2023 priority resource expansion opportunities; the Company’s metal price and cut-off grade assumptions. Forward-looking statements necessarily involve assumptions, risks and uncertainties, certain of which are beyond Calibre's control. For a listing of risk factors applicable to the Company, please refer to Calibre's annual information form (“AIF”) for the year ended December 31, 2023, and its management discussion and analysis (“MD&A”) for the year ended December 31, 2023, all available on the Company’s SEDAR+ profile at This list is not exhaustive of the factors that may affect Calibre's forward-looking statements such as potential sanctions implemented as a result of the United States Executive Order 13851 dated October 24, 2022.

Calibre's forward-looking statements are based on the applicable assumptions and factors management considers reasonable as of the date hereof, based on the information available to management at such time. Such assumptions include but are not limited to: the Company being able to mine and process higher grades and keep production costs relatively flat going forward; there not being an increase in production costs as a result of any supply chain issues or ongoing COVID-19 restrictions; there being no adverse drop in metal price or cut-off grade at the Company’s Nevada properties. Calibre does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change other than as required by applicable securities laws. There can be no assurance that forward-looking statements will prove to be accurate, and actual results, performance or achievements could differ materially from those expressed in, or implied by, these forward-looking statements. Accordingly, undue reliance should not be placed on forward-looking statements.

 



EN
15/04/2024

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Calibre Mining

 PRESS RELEASE

Calibre to Provide an Update on the Valentine Gold Mine and Host Its F...

Calibre to Provide an Update on the Valentine Gold Mine and Host Its First Quarter 2024 Financial Results Conference Call on Wednesday, May 15, 2024 VANCOUVER, British Columbia, May 07, 2024 (GLOBE NEWSWIRE) -- Calibre (TSX: CXB; OTCQX: CXBMF) (“Calibre” or the “Company”) will provide an update on its 100% owned, fully funded Valentine Gold Mine located in Newfoundland & Labrador, Canada on Wednesday May 15, 2024. Valentine remains on track to reach production during H1, 2025. In addition, the Company will release its first quarter 2024 financial results on Tuesday, May 14, 2024 after the...

 PRESS RELEASE

Calibre Announces Closing of C$115 Million Financing

Calibre Announces Closing of C$115 Million Financing Not for distribution to U.S. news wire services or dissemination in the United States. VANCOUVER, British Columbia, April 16, 2024 (GLOBE NEWSWIRE) --  Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (“Calibre” or the “Company”) is pleased to announce that it has closed its previously announced bought deal financing (the “Offering”) for aggregate gross proceeds of C$115,147,200. Pursuant to the Offering, a total of 68,540,000 common shares of the Company (“Common Shares”), including 8,940,000 Common Shares issued pursuant to the exercis...

 PRESS RELEASE

Calibre Intercepts High-Grade Gold & Silver Mineralization from Severa...

Calibre Intercepts High-Grade Gold & Silver Mineralization from Several Targets at its Eastern Borosi Mine Complex; Drilling Intersects Include 10.81 g/t Gold over 3.4 metres, 9.64 g/t Gold over 3.3 metres, 1,431.6 g/t Silver over 2.9 metres and 642.3 g/t Silver over 5.0 metres VANCOUVER, British Columbia, April 15, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the “Company” or “Calibre”) is pleased to announce drill results from its 2023 resource conversion and expansion program within its 176 km2 Eastern Borosi Mine Complex (“Eastern Borosi”) located in northea...

 PRESS RELEASE

Calibre’s Q1 Gold Production on Track to Deliver Full Year 2024 Guidan...

Calibre’s Q1 Gold Production on Track to Deliver Full Year 2024 Guidance While Advancing Operational Readiness For H1, 2025 First Gold at The Fully Funded Valentine Gold Mine VANCOUVER, British Columbia, April 09, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the "Company" or "Calibre") is pleased to announce the operating results for the three months ended March 31, 2024 (all financial amounts are expressed in U.S. dollars unless otherwise indicated).  Darren Hall, President and Chief Executive Officer of Calibre, stated: “Consistent with H1 2024 production exp...

 PRESS RELEASE

Calibre’s Valentine Gold Mine Property-Wide Exploration Program Underw...

Calibre’s Valentine Gold Mine Property-Wide Exploration Program Underway With Initial Drill Program Southwest of the Leprechaun Deposit Following Recent Discovery Drilling Including 46 g/t Gold Over 5.3 Metres VANCOUVER, British Columbia, April 03, 2024 (GLOBE NEWSWIRE) -- Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (“Calibre” or the “Company”) is pleased to announce the 2024 exploration program and review of the exploration potential at the Valentine Gold Mine (“Valentine” or the “Mine”). Valentine is located in the west-central region of Newfoundland & Labrador, Canada. The property i...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch