EGM Engold Mines

EnGold Samples up to 9.65 gpt Gold from New Zones at Lac La Hache

Vancouver, British Columbia--(Newsfile Corp. - July 6, 2020) - David H. Brett, President & CEO, EnGold Mines Ltd., (TSXV: EGM) "EnGold" or the "Company") reports that assays from a number of newly identified gold targets within the Company's 100% owned Lac La Hache Property in the Cariboo Region of Central BC have returned gold values ranging from anomalous to 9.65 gpt gold. A total of 67 bedrock grab samples were collected in early June during the initial follow-up to new B-soil gold anomalies identified in 2019 geochemical surveys. Highlights are provided in a series of images .

Prospecting along the northernmost end of the Aurizon South Deposit within drill-road ditch exposures produced a 30m wide section (to date, more prospecting is required) where all 8 bedrock grab samples of limonitic gouge surrounding narrow quartz veins assayed anomalous gold values (9.65, 1.48, 1.38, 1.34, 1.3, 1.2, 0.8, 0.6 gpt gold). A single gold pan of one of these veins produced over 20 minute gold grains. This new at-surface zone of quartz veins lies 160 m north of similar veins drilled in 2018-19, where very high gold values up to 263 gpt gold were assayed in bedrock grab samples on surface.



Figure 1: Results Along 7790N Lac La Hache Property

To view an enhanced version of Figure 1, please visit:

In the Jodie area, intensely weathered limonitic quartz-pyrite-chalcopyrite fractures within potassically altered monzonitic host rocks assayed 2.83 grams per tonne (gpt) gold, and an unusual, intensely altered (intrusion?)-breccia containing minute visible gold specs assayed 4.8 gpt gold. These results explain the highest B-soil value of 662 ppb gold at Jodie, and other anomalies remain to be prospected there.

Within the large Aurizon Zone West soil grid, initial prospecting of the highest B-soil gold value (1400 ppb) produced relatively low gold values less than 0.2 gpt gold, but another site yielded 5.2 gpt from red-brown rusty limonite-epidote-altered quartz veins containing pyrite. This site lies more than 700 m west-northwest of the Aurizon South Deposit.

"We believe the new quartz veins discovered at the north end of the Aurizon South Deposit represent brittle fracturing in the hanging wall, well above the more intense hydrothermal breccia which hosts the gold-copper-silver resource," said Rob Shives, P.Geo., EnGold VP of Exploration. "We previously found that the width and metal tenors of the breccia diminished in the upper 150 meters or so, so the possibility that the gold-related silicification extends upwards into the overlying host intrusion at surface offers additional potential. We look forward to sampling more veins, and hope to extend the zone to the east."

"Finding new gold-bearing structures at surface based on visual anomalies in road cuts is reshaping our exploration approach in the Aurizon area," said EnGold President & CEO David H. Brett. "The many logging access roads in the area are receiving a fresh look."

Update on Ann North Drilling

Recent high rainfall and flooding in central BC has delayed the Company's resumption of deep drilling at the Ann North prospect. Initially suspended at 604 m depth due to Covid-19 concerns and wet ground conditions, an unseasonably wet June has intensified in July and as such the planned drilling remains contingent on improved weather conditions to allow access to the site.

About EnGold

EnGold () is focused on exploring its 100% owned mineral property located near the town of Lac La Hache in BC's prolific Cariboo mining region. EnGold's corporate philosophy rests on three interdependent pillars: Environment, Engagement and Gold. Through sound environmental stewardship, commitment to transparent engagement with local communities, the Company is dedicated to driving shareholder and stakeholder value by discovering and developing mineral resources.

Rob Shives P.Geo., VP Exploration and a Qualified Person as defined under National Instrument 43-101, has reviewed and approved the technical content of this release.

Engold Mines Ltd.
Per/

David Brett, MBA
President & CEO
Contact: David Brett, 604-682-2421 or

Forward Looking Statements: The information in this news release contains forward looking statements that are subject to a number of known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those anticipated in our forward looking statements. Factors that could cause such differences include: changes in world commodity markets, equity markets, costs and supply of materials relevant to the mining industry, change in government and changes to regulations affecting the mining industry and failure to obtain regulatory approval in a timely manner. Forward-looking statements in this release include statements regarding plans to raise financing for operations, future exploration programs and operation plans and anticipated timing for completion of the next tranche of the financing. Although we believe the expectations reflected in our forward looking statements are reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance or achievements. EnGold disclaims any obligations to update or revise any forward looking statements whether as a result of new information, future events or otherwise, except as may be required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit

EN
06/07/2020

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Engold Mines

 PRESS RELEASE

EnGold's Exploration Program Restarting September 7, 2021 and Financin...

Vancouver, British Columbia--(Newsfile Corp. - September 2, 2021) - David H. Brett, President & CEO, EnGold Mines Ltd., (TSXV: EGM) ("EnGold" or the "Company") is pleased to announce that it will be restarting its exploration program on September 7, 2021. "With the challenges of BC's extremely active 2021 wildfire season now behind us, EnGold will be relaunching its exploration program at Lac La Hache next week," said EnGold VP of Exploration, Rob Shives, P.Geo. "We are particularly excited about the deep, alkalic porphry drilling at Ann North that will soon be underway. Following up on the h...

 PRESS RELEASE

Anton Novak Acquires Securities of EnGold Mines Ltd.

Vancouver, British Columbia--(Newsfile Corp. - August 11, 2021) - Anton Novak acquired 8,000,000 common shares issued on a flow-through basis (each, a "FT Common Share") and 4,000,000 share purchase warrants (each, a "Warrant") of EnGold Mines Ltd. (the "Company") as a result of his subscription for 8,000,000 units of the Company (each, a "FT Unit") at a price of $0.50 FT Unit. Each FT Unit consisted of one FT Common Share and one-half of one Warrant, with each whole Warrant entitling the holder to purchase one common share in the capital of the Company (a "Common Share") at a price of $0.75 ...

 PRESS RELEASE

EnGold Closes $4 Million First Tranche of $8 Million Non-Brokered Flow...

Vancouver, British Columbia--(Newsfile Corp. - August 11, 2021) - David H. Brett, President & CEO, EnGold Mines Ltd., (TSXV: EGM) ("EnGold" or the "Company") reports that the Company has closed the first tranche of its previously announced $8,000,000 non-brokered flow-through financing, resulting in proceeds to the Company of $4,000,000 (the "First Tranche Financing"). Pursuant to the closing of the First Tranche Financing, the Company issued 8,000,000 units at a price of $0.50 per unit. Each unit consists of one flow-through common share and one half of one warrant, whereby each whole warra...

 PRESS RELEASE

EnGold Intersects 7.5 gpt Gold Over 1.5 Metres at "Road Gold" at Lac L...

Vancouver, British Columbia--(Newsfile Corp. - August 10, 2021) - David H. Brett, President & CEO, EnGold Mines Ltd. (TSXV: EGM) ("EnGold" or the "Company"), reports that the Company has received drill core assays with the highest gold value to date within the new Road Gold zone within its 100% owned Lac La Hache Property in the Cariboo region of BC, with drill hole R21-03 cutting 7.51 gpt gold over 1.5 m (59 - 60.5 m). The Company plans to continue targeting Road Gold when the wildfire risk in the region subsides and its exploration program resumes."The results at Road Gold continue to improv...

 PRESS RELEASE

EnGold Corporate Update

Vancouver, British Columbia--(Newsfile Corp. - August 4, 2021) - David H. Brett, President & CEO, EnGold Mines Ltd., (TSXV: EGM) ("EnGold" or the "Company") reports that the Company's planned share consolidation (on a 10 for 1 basis) will become effective on Friday, August 6, 2021 (the "Effective Date"). The Company's common shares are expected to commence trading on a post-consolidation basis on the Effective Date under the new CUSIP/ISIN numbers 29330R308/CA29330R3080. Following completion of the consolidation, the Company will have approximately 25,661,544 common shares issued and outstan...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch