ESPIQ ESP Resources Inc

GSP Resource Corp. Completes Geochemical Sample Program at Olivine Mountain

GSP Resource Corp. Completes Geochemical Sample Program at Olivine Mountain

VANCOUVER, British Columbia, Dec. 11, 2018 (GLOBE NEWSWIRE) -- GSP Resource Corp. (TSX-V: GSPR) (the “Company”) is pleased to announce that it has completed its geochemical sample program on the Olivine Mountain Property.  Work completed in the fall of 2018 consisted of ground surveys to establish suitable drill targets over a 12 square kilometer area covering the diorite, gabbro and ultramafic phases of the Tulameen batholiths, which host three mineral showings and interpreted geophysical anomalies.

The initial phase of work consisted of a geochemical sampling program of approximately 1,760 samples completed over the entire grid area.  Geochemical samples were collected at 50 meter intervals along all lines.  The samples are currently being analyzed at MS Analytical located in Langley, BC, with batches of results expected to be completed over the first quarter of 2019.  Samples are being analyzed for 36 element ICP, including gold and platinum and palladium.  Data from the program will be interpreted alongside Aeromagnetic survey information and previous sampling to determine the viability of massive sulphides drill targets at the project.  The Company is also reviewing opportunities to acquire or joint venture other precious and base metals projects in politically favorable mineral exploration jurisdictions in North America.

GSP Resource Corp.’s President and CEO, Simon Dyakowski, commented: “We are pleased that crews were able to expedite the geochemical sampling program ahead of the Winter season.  The geochemical grid is expected to provide valuable information to potentially spot drill holes targeting massive sulphides when combined with data from the previously completed Aeromagnetic and surface sampling programs.  The Olivine Mountain Project has several high grade showings including the Hop Showing where a selected sample of a high-grade chalcopyrite stringer assayed 23.0 grams per tonne gold, 89.5 grams per tonne silver and 7.49% copper. The ASP 14 showing returned a sample grade of 4.74% copper.  The Company is pleased to continue to advance the Olivine Mountain Project with the goal of determining potential drill targets, as well as to continually assess opportunities to acquire or partner on additional mineral exploration projects across North America.”

Additional information on the Company and the Olivine Mountain Property, can be found in the Company’s final long form prospectus dated October 11, 2018 and National Instrument 43-101 Technical Report on the Olivine Mountain Project as filed on SEDAR at and on the Company’s website at .

The scientific and technical disclosure contained in this news release has been reviewed and approved by Christopher I. Dyakowski, P.Geo, a “Qualified Person” as that term is defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

About GSP Resource Corp.: GSP Resource Corp. is a mineral exploration company focused on the acquisition, exploration and development of mineral resource properties. The Company has an option to acquire a 100% interest and title to the Olivine Mountain Property located in the Similkameen Mining Division, 25 km northwest of Princeton, British Columbia.

Contact Information - For more information, please contact:

Simon Dyakowski, Chief Executive Officer

Tel: (604) 619-7469

Email:

Cautionary Statement Regarding “Forward-Looking” Information.

This news release includes certain statements that constitute “forward-looking information” within the meaning of applicable securities law, including without limitation, statements that address the Olivine Mountain Project, acquisition or joint venture on other potential projects, comments regarding the timing and content of upcoming work programs, and other statements relating to the business prospects of the Company. Forward-looking statements address future events and conditions and are necessarily based upon a number of estimates and assumptions. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect”, “is expected”, “estimates” or “intends”, or stating that certain actions, events or results “may”, “could”, “might” or “will” be taken, occur or be achieved), and variations of such words, and similar expressions are not statements of historical fact and may be forward-looking statements. Forward-looking statements are necessarily based upon a number of factors that, if untrue, could cause the actual results, performances or achievements of the Company to be materially different from future results, performances or achievements express or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of metals, anticipated costs and the ability to achieve goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms, and that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company’s planned exploration activities will be available on reasonable terms and in a timely manner. Forward-looking statements are subject to a variety of risks and uncertainties, which could cause actual events, level of activity, performance or results to differ materially from those reflected in the forward-looking statements, including, without limitation: (i) risks related to gold, platinum, palladium, copper and other commodity price fluctuations; (ii) risks and uncertainties relating to the interpretation of exploration results; (iii) risks related to the inherent uncertainty of exploration and cost estimates and the potential for unexpected costs and expenses; (iv) that resource exploration and development is a speculative business; (v) that the Company may lose or abandon its property interests or may fail to receive necessary licences and permits;  (vi) that environmental laws and regulations may become more onerous;  (vii) that the Company may not be able to raise additional funds when necessary; (viii) the possibility that future exploration, development or mining results will not be consistent with the Company’s expectations; (ix) exploration and development risks, including risks related to accidents, equipment breakdowns, labour disputes or other unanticipated difficulties with or interruptions in exploration and development; (x) competition; (xi) the potential for delays in exploration or development activities or the completion of geologic reports or studies; (xii) risks related to environmental regulation and liability; (xiii) risks associated with failure to maintain community acceptance, agreements and permissions (generally referred to as “social licence”), including local First Nations; (xiv) risks relating to obtaining and maintaining all necessary government permits, approvals and authorizations relating to the continued exploration and development of the Company’s projects; (xv) risks related to the outcome of legal actions; (xvi) political and regulatory risks associated with mining and exploration; (xvii) and risks related to current global financial conditions. These risks, as well as others, could cause actual results and events to vary significantly. Factors that could cause actual results to differ materially from those in forward-looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, the loss of key directors, employees, advisors or consultants, volatility in metals prices, adverse weather conditions, equipment failures, failure of counterparties to perform their contractual obligations and fees charged by service providers. Investors are cautioned that forward-looking statements are not guarantees of future performance or events and, accordingly are cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty of such statements. The forward-looking statements included in this news release are made as of the date hereof and the Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

EN
11/12/2018

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on ESP Resources Inc

 PRESS RELEASE

GSP Resource Corp. Completes Alwin Mine Model, Announces Summer Drilli...

GSP Resource Corp. Completes Alwin Mine Model, Announces Summer Drilling Program VANCOUVER, British Columbia, May 19, 2021 (GLOBE NEWSWIRE) -- GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) announces the completion of a 3D digital model of its Alwin Mine. GSP had commissioned Renaissance Geoscience Services Inc. to complete the modelling project upon receipt and analysis of GSP’s Phase 1 drill program results (see news release dated March 2, 2021). The model includes all known underground workings, separated into drift and declines, raises, cement filled, rock filled and open ...

 PRESS RELEASE

GSP Reports Final Phase 1 Drill Results for Alwin Mine Project, inters...

GSP Reports Final Phase 1 Drill Results for Alwin Mine Project, intersecting 0.313% CuEq over 61.7 m, including 1.29% CuEq over 14.1 m • Deep high-grade intersection of 1.29% copper equivalent over 14.1 m under the partially mined #6 zone in hole AM20-10E. • Deep medium-grade bulk tonnage intersection of 0.313% copper equivalent over 61.7m under the partially mined #6 and #3 zones in hole AM20-10E. • New low-grade intersections of 0.21% copper over 13.3 m in hole AM-20-10D and at surface 0.195% copper equivalent over 36.6 m and deeper 0.198% copper equivalent over 22.15 m in hole AM20-09....

 PRESS RELEASE

GSP Resource Corp. Receives Initial Drill Results From Alwin Mine Proj...

GSP Resource Corp. Receives Initial Drill Results From Alwin Mine Project, Including 2.27% Copper Over 12.1M 6 Drill holes confirm near-surface “Alwin-style” copper mineralizationHigh grade intersection of 2.27% Copper over 12.1 m in Hole AM20-01Shallow bulk tonnage potential with 0.40% Copper over 39.8 m in hole AM20-02Results pending from deeper exploration drilling, expected in early 2021 VANCOUVER, British Columbia, Dec. 23, 2020 (GLOBE NEWSWIRE) -- GSP Resource Corp. (TSX-V: GSPR) (FRA: 0YD) (the “Company” or “GSP”) has released initial diamond drill core results from the first st...

 PRESS RELEASE

GSP Resource Corp. Closes $550,000 Private Placement

GSP Resource Corp. Closes $550,000 Private Placement NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION, DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN OR INTO THE UNITED STATES VANCOUVER, British Columbia, Nov. 17, 2020 (GLOBE NEWSWIRE) -- GSP Resource Corp. (TSX-V: GSPR) (the “Company” or “GSP”) is pleased to announce that it has closed a non-brokered private placement of 1,375,000 units (each, a “Unit”) at a price of $0.40 per Unit for gross proceeds of $550,000 (the “Private Placement”). Each Unit consists of one ‘flow-throu...

 PRESS RELEASE

GSP Resource Corp. Completes Phase 1 Drilling at Alwin Mine Project

GSP Resource Corp. Completes Phase 1 Drilling at Alwin Mine Project Phase 1 Drill Program expanded to 10 holes and ~2000 metersGSP Drilling intersected new “Alwin Style” mineralization North of historic Alwin Zone VANCOUVER, British Columbia, Nov. 05, 2020 (GLOBE NEWSWIRE) -- GSP Resource Corp. (TSX-V: GSPR) (FRA: 0YD) (the “Company” or “GSP”) reports that it has completed a 10 hole Phase 1 drill program at its Alwin Mine Copper-Silver-Gold Project. The Phase 1 drill program was increased from an initial budget of 1000 meters, to a total of nearly 2000 meters of diamond drilling. The ini...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch