FSY Forsys Metals

Forsys Reports Positive Ore Sorting Testwork at Norasa

Forsys Reports Positive Ore Sorting Testwork at Norasa

TORONTO, April 08, 2025 (GLOBE NEWSWIRE) -- Forsys Metals Corp. (TSX: FSY) (FSE: F2T) (NSX: FSY) (“Forsys” or the “Company”)

Forsys is pleased to report on ore-sorting testwork at its Norasa Uranium project (“Norasa”1).

Highlights

  • Exploratory ore sorting evaluations show that ore sorting is possible for Valencia ore to increase uranium grade and reduce acid consumption during processing.
  • Next phase testwork has commenced for proof of concept for XRF and XRT technologies.

Ore sorting is a process stage for separation and upgrading of run of mine ore based on its grade, composition and physical properties. Key benefits include delivering an upgraded material stream to the processing plant by rejecting waste and problematic lithologies, thereby enhancing processing efficiency and reducing operating costs. Improvements in metal recovery may also be achieved.



Results from ore sorting trials done so far on Valencia samples indicate:

  • Gamma sorting amenability work showed that uranium concentration is well correlated with sorting sensor detection peaks.
  • XRF amenability testing demonstrated a strong calibration accuracy with uranium grades, suggesting that uranium upgrading is achievable with a decrease in mass pull.

Given the positive outcome, a decision was made to conduct further confirmatory testwork, which is currently in progress and for which results are expected before end of Q2 2025.

This work includes:

  • Detailed XRF testing with machine learning and fine calibration and scanning of variability samples over approximately 440m of drill core from the Valencia deposit.
  • Scouting XRT ore sorting amenability testing on variability samples from Valencia deposit.

The results will be used to determine the ongoing testwork and technology appraisal, including economic evaluation.

Qualified Persons Statement for Metallurgy

Mr Aveshan Naidoo is a Specialist Engineer: Hydromet and Economics, for DRA South Africa Projects (Pty) Ltd of Building 33, Woodlands Office Park, 20 Woodlands Drive, Woodlands, Sandton, 2080. He holds a Bachelor of Science in Chemical Engineering from the University of KwaZulu-Natal and a Master of Business Administration from the University of Witwatersrand. He is a registered Professional Engineer with the Engineering Council of South Africa (Registration No. 20130523). Mr Naidoo has been practising his profession continuously since 2008 and has 16 years of experience across a range of African projects. He is familiar with NI 43-101 and, by reason of his education, experience, and professional registrations, he fulfils the requirements of an independent Qualified Person as defined in NI 43-101.

________________________________________________________________________________________________

About Forsys Metals Corp.

Forsys Metals Corp. (TSX: FSY, FSE: F2T, NSX: FSY) is an emerging uranium developer focused on advancing its wholly owned Norasa Uranium Project, located in the politically and uranium friendly jurisdiction of Namibia, Africa. The Norasa Uranium Project is comprised of the Valencia Uranium deposit (ML-149) and the nearby Namibplaas Uranium deposit (EPL-3638). Further information is available at the Company website

On behalf of the Board of Directors of Forsys Metals Corp. Richard Parkhouse, Investor Relations. For additional information please contact:

Pine van Wyk, Country Director, Forsys

email:

Richard Parkhouse, Investor Relations

email:   

email: 

Forward Looking Statement

Certain information contained in this press release constitutes "forward-looking information", within the meaning of Canadian legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or "has the potential to". Forward looking statements contained in this press release are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Among those factors which could cause actual results to differ materially are the following: market conditions and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR+ at The forward-looking statements included in this press release are made as of the date of this press release and Forsys Metals Corp disclaim any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.

___________________

1 The Norasa Uranium Project (“Norasa“) is wholly owned by the Company’s 100% subsidiary Valencia Uranium (Pty) Ltd. (“Valencia Uranium”) and comprises the Valencia uranium deposits (held under ML-149) ("Valencia”) and the Namibplaas uranium deposit (under EPL-3638) (“Namibplaas”), located in the Erongo region of Namibia.



EN
08/04/2025

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Forsys Metals

 PRESS RELEASE

Forsys Reports Positive Ore Sorting Testwork at Norasa

Forsys Reports Positive Ore Sorting Testwork at Norasa TORONTO, April 08, 2025 (GLOBE NEWSWIRE) -- Forsys Metals Corp. (TSX: FSY) (FSE: F2T) (NSX: FSY) (“Forsys” or the “Company”) Forsys is pleased to report on ore-sorting testwork at its Norasa Uranium project (“Norasa”1). Highlights Exploratory ore sorting evaluations show that ore sorting is possible for Valencia ore to increase uranium grade and reduce acid consumption during processing.Next phase testwork has commenced for proof of concept for XRF and XRT technologies. Ore sorting is a process stage for separation and upgrading ...

 PRESS RELEASE

Forsys Reports Additional Interim Drilling Results from Norasa

Forsys Reports Additional Interim Drilling Results from Norasa TORONTO, Feb. 26, 2025 (GLOBE NEWSWIRE) -- Forsys Metals Corp. (TSX: FSY) (FSE: F2T) (NSX: FSY) (“Forsys” or the “Company”) Forsys is pleased to announce further interim drilling results from its Resource Extension and Exploration drilling program on Valencia (ML 149), at the Company’s Norasa Uranium project (“Norasa1”). The drilling program currently underway is designed to expand and upgrade Valencia’s resources within and close to the current main pit. Positive results indicate good potential to increase the resource and g...

 PRESS RELEASE

Forsys Closes Previously Announced Non‐Brokered Private Placement

Forsys Closes Previously Announced Non‐Brokered Private Placement TORONTO, Feb. 21, 2025 (GLOBE NEWSWIRE) -- Forsys Metals Corp. (TSX: FSY) (FSE: F2T) (NSX: FSY) (“Forsys” or the “Company”) is pleased to announce the completion of its previously announced non-brokered private placement (the “Private Placement”), for aggregate gross proceeds of C$5,005,000, pursuant to which the Company issued a total of 10,010,000 Units at a subscription price of C$0.50 per Unit (see the Company’s January 22, 2025 press release). Each Unit consists of one Class A Common Share (“Common Share”) and one...

 PRESS RELEASE

Forsys Announces Changes to its Board of Directors and Non‐Brokered Pr...

Forsys Announces Changes to its Board of Directors and Non‐Brokered Private Placement TORONTO, Jan. 22, 2025 (GLOBE NEWSWIRE) -- Forsys Metals Corp. (TSX: FSY) (FSE: F2T) (NSX: FSY) (“Forsys” or the “Company”) is pleased to announce: the appointment of Mr. Stefano Roma as a member of the Board of Directors of the Company, effective immediately, following the resignation of Mr. Richard Parkhouse as a member of the Board of Directors; andits intention to raise up to C$5,280,000 in gross proceeds by way of a non‐brokered private placement of up to 10,560,000 units (the “Units”) at a subscri...

 PRESS RELEASE

Forsys Reaches Agreement to Purchase Farm Namibplaas Portion-1 on Excl...

Forsys Reaches Agreement to Purchase Farm Namibplaas Portion-1 on Exclusive Prospecting Licence (EPL-3638) TORONTO, Jan. 06, 2025 (GLOBE NEWSWIRE) -- Forsys Metals Corp. (TSX: FSY) (FSE: F2T) (NSX: FSY) (“Forsys” or the “Company”) is pleased to announce that its wholly-owned subsidiary Valencia Uranium (Pty) (“Valencia Uranium”) has finalised an agreement with Namibplaas Guestfarm and Tours (Proprietory) Limited (the “Farm Owner”) for the purchase of Portion-1 of farm Namibplaas No. 93 (the “Property”), at the Company’s Norasa Uranium project (“Norasa1”). The Property hosts the Namibpl...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch