IGN AB Ignitis Grupe GDR

AB “Ignitis grupė” approved strategic long-term incentive plan targets

AB “Ignitis grupė” approved strategic long-term incentive plan targets

On 23 May 2023, the Supervisory Board of AB “Ignitis grupė” (hereinafter – the Company) approved strategic long-term targets (hereinafter – Targets) and performance objectives for 2023–2026 and criteria for assessing the achievement of these Targets.

The Targets are linked to the 4-year targets that are set out in the Group’s strategic plans, with a major focus on increasing shareholder return and expanding commercial green generation:

   Strategic priorityObjective
    WeightEntry (70%)Target (100%)

(equal to maximum)
 PerformanceTRS 

TSR of Ignitis Group vs. average TSR of EURO STOXX® Utilities Index1
40%≥70%2≥100%2
 ReturnsAverage adjusted ROCE3

over the four years 2023–2026
20%6.5%27.5%2
 Growing

renewables
Green generation installed capacity4, GW 20%2.222.42
 Increasing Networks resiliencyAverage electricity SAIFI5 over the four years 2023–2026 (per annum)10%≤1.09≤1.05
 Targeting net zero emissions GHG emissions reduction, 2026

vs. 20206
10%-15%2-27%2
  1. TSR (Total Shareholders Return) is calculated as the ratio of the difference between the average share price at the end of the period and the beginning of the period and adding the amount of dividends per share over performance period to the share price at the beginning of the performance period. The average TSR (Total Shareholders Return) of Ignitis Group and EURO STOXX® Utilities Index is calculated in the two-month period (Nov and Dec accordingly) preceding the beginning and the end of the performance period (January 1, 2023–December 31, 2026), in order to neutralise any possible volatility on the market. TSR of Ignitis Group is calculated with the assumption that dividends are reinvested as well as EURO STOXX® Utilities Index used for benchmarking (based on gross return index type and EUR currency). Change in the value of the Ignitis Group shares between the beginning and the end of the reference period calculated as a weighted average of the IGN1L (Nasdaq Baltic) and IGN GDR (London Stock Exchange) prices based on volume traded.
  2. Target will be measured according to the achievement scale with linear interpolation between the entry (70%) and target (100%) thresholds.
  3. ROCE is calculated by dividing Ignitis Group adjusted earnings before interest and tax (adjusted EBIT) by its capital employed (average net debt at the beginning and end of the reporting period + average book value of equity at the beginning and end of the reporting period).
  4. Gross installed capacity (COD reached), 2026.
  5. Electricity SAIFI (System Average Interruption Frequency Index) is calculated based on the National Energy Regulatory Council methodology, excluding (1) interruptions due to natural phenomena corresponding to the values of natural, catastrophic meteorological and hydrological phenomena indicators; (2) interruptions due to failures in the network of the transmission system operator. Target objective is defined based on the decision of the National Energy Regulatory Council on January 26 of 2022 no. O3E-79.
  6. Based on the Ignitis group GHG emissions level in 2020: 5.31m t CO2-eq. (excl. Vilnius CHP), targeted 2026 level: 3.9m t CO2-eq.

In accordance with the Remuneration Policy of AB “Ignitis grupė” group of companies, as approved by the decision of the General Meeting of Shareholders of the Company on 30 March 2023, a variable part of remuneration (hereinafter – LTV) is paid to the Group’s key executives for achieving long-term objectives.

LTV is applicable to nine key executives of the Group: members of the Management Board of the Company and CEOs of four Group companies (Ignitis Renewables, ESO, Ignitis Gamyba and Ignitis). LTV is paid after the entire 4-year strategic period ends.

Targets and performance objectives for other periods are published on the Group’s and are included in the annexes to this notification.

For additional information, please contact:

Communications

Artūras Ketlerius



Investor Relations

Ainė Riffel-Grinkevičienė

+370 643 14925

Attachments



EN
23/05/2023

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on AB Ignitis Grupe GDR

 PRESS RELEASE

Notice of convening the Annual General Meeting of Shareholders of AB “...

Notice of convening the Annual General Meeting of Shareholders of AB “Ignitis grupė” On 25 February 2026, the Management Board of AB “Ignitis grupė” (hereinafter – the Group), legal entity code: 301844044, registered office address: Laisvės Ave. 10, Vilnius, decided to convene the Annual General Meeting of Shareholders of the Group (hereinafter –AGM). The AGM will be held on 25 March 2026, at 15:00 (Vilnius time) at Vilnius Business Garden verslo centras, Laisvės ave, Vilnius. Registration starts at 14:15 (Vilnius time) and closes at 14:45 (Vilnius time). The agenda for the AGM, which is ...

 PRESS RELEASE

Notice of convening the Annual General Meeting of Shareholders of AB “...

Notice of convening the Annual General Meeting of Shareholders of AB “Ignitis grupė” On 25 February 2026, the Management Board of AB “Ignitis grupė” (hereinafter – the Group), legal entity code: 301844044, registered office address: Laisvės Ave. 10, Vilnius, decided to convene the Annual General Meeting of Shareholders of the Group (hereinafter –AGM). The AGM will be held on 25 March 2026, at 15:00 (Vilnius time) at Vilnius Business Garden verslo centras, Laisvės ave, Vilnius. Registration starts at 14:15 (Vilnius time) and closes at 14:45 (Vilnius time). The agenda for the AGM, which is ...

 PRESS RELEASE

Pranešimas apie šaukiamą AB „Ignitis grupė“ eilinį visuotinį akcininkų...

Pranešimas apie šaukiamą AB „Ignitis grupė“ eilinį visuotinį akcininkų susirinkimą 2026 m. vasario 25 d. AB „Ignitis grupė“ (toliau – Grupė), juridinio asmens kodas: 301844044, registruotos buveinės adresas: Laisvės pr. 10, Vilnius, valdyba, priėmė sprendimą sušaukti Grupės eilinį visuotinį akcininkų susirinkimą (toliau – EVAS). EVAS įvyks 2026 m. kovo 25 d., 15:00 val. (Vilniaus laiku), Business Garden Vilnius verslo centras, Laisvės pr. 10, Vilnius, LT-04215. Akcininkų registracijos pradžia – 14:15 val. (Vilniaus laiku), akcininkų registracijos pabaiga – 14:45 val. (Vilniaus laiku). EVA...

 PRESS RELEASE

Integrated Annual Report 2025: record strategic progress with +0.7 GW ...

Integrated Annual Report 2025: record strategic progress with +0.7 GW of new green capacities installed, completed mass smart meter roll-out, and Adjusted EBITDA beat AB “Ignitis grupė” publishes its Integrated Annual Report 2025, which is attached to this notice. Financial performance Our Adjusted EBITDA for the full-year 2025 amounted to EUR 546.1 million (+3.4% YoY) and exceeded the upper end of our full-year guidance range of EUR 510–540 million. The growth was driven by the stronger performance of our two largest segments: Green Capacities and Networks.        In 2025, our Investment...

 PRESS RELEASE

Integrated Annual Report 2025: record strategic progress with +0.7 GW ...

Integrated Annual Report 2025: record strategic progress with +0.7 GW of new green capacities installed, completed mass smart meter roll-out, and Adjusted EBITDA beat  AB “Ignitis grupė” publishes its Integrated Annual Report 2025, which is attached to this notice. Financial performance Our Adjusted EBITDA for the full-year 2025 amounted to EUR 546.1 million (+3.4% YoY) and exceeded the upper end of our full-year guidance range of EUR 510–540 million. The growth was driven by the stronger performance of our two largest segments: Green Capacities and Networks.        In 2025, our Investmen...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch