KMT. Komet Resources Inc

Brunswick Exploration Starts Winter Drilling Campaign at Mirage

Brunswick Exploration Starts Winter Drilling Campaign at Mirage

MONTREAL, Jan. 20, 2025 (GLOBE NEWSWIRE) -- Brunswick Exploration Inc. (, ; “BRW” or the “Company”) is pleased to announce that it has started a new drilling campaign at the Mirage project located in the Eeyou Istchee-James Bay region of Quebec. The program, consisting of a minimum 5,000 meters, will focus on several untested exploration targets east and west of the Central Zone corridor. In a second phase, BRW will target potential expansions of MR-3, MR-6 and the stacked dyke system along their lateral extensions and at depth.

Mr. Killian Charles, President and CEO of BRW, commented: “I am particularly excited to see this new campaign begin at Mirage as many of the planned targets in this campaign are undrilled, unlike during the prior summer campaign. These new targets are located along the Central Zone corridor where we have consistently seen the largest pegmatites at Mirage, including the MR-6 and MR-3 dykes. Due to logistical constraints, we have been unable to drill them until now.

Importantly, we also will be drilling an entirely new mineralized dyke system located 4.5 kilometers to the northeast of the Central Zone. This is the first time BRW is drilling in this high potential area and it represents the largest step-out from the current area of focus since the start of drilling in 2023.”

Figure 1: Mirage Target Location



Mirage Project Drill Program

The 2025 winter campaign is anticipated to drill a minimum of 5,000 meters over a period of three months. The campaign will have two priority objectives: test several undrilled targets across the Mirage project and continue step-out drilling for MR-3, MR-6 and the stacked dyke system (see Figure 1).

These high-priority undrilled targets were uncovered in the 2023 and 2024 prospecting campaigns or through subsequent geophysical surveys and consist of spodumene-bearing pegmatites outcropping at surface and low gravimetric anomalies with neighbouring geochemical lithium anomalies. Their proximity to shallow lakes makes them ideal candidates for ice drilling, and due to the warmer winter and poor ice formation in 2024, BRW was unable to previously access them.

In the Central Zone, drilling will initially test the MR-6 to the north where it remains open and continue to follow the MR-3 dyke down-dip to the south. Interestingly, previous drilling at MR-3 indicated potential for thickening of the dyke (see ). BRW will also look to drill the stacked dyke system to the east where it remains open with several significant intercepts.

Qualified Person

The scientific and technical information contained in this press release has been reviewed and approved by Mr. Simon T. Hébert, VP Development. He is a Professional Geologist registered in Quebec and is a Qualified Person as defined by National Instrument 43-101.

About Brunswick Exploration

Brunswick Exploration is a Montreal-based mineral exploration company listed on the TSX-V under symbol BRW. The Company is focused on grassroots exploration for lithium in Canada, a critical metal necessary to global decarbonization and energy transition. The company is rapidly advancing the most extensive grassroots lithium property portfolio in Canada and Greenland.

Investor Relations/information

Mr. Killian Charles, President and CEO ()

Cautionary Statement on Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Corporation’s public documents filed on SEDAR at Although the Corporation believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

A photo accompanying this announcement is available at



EN
20/01/2025

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Komet Resources Inc

 PRESS RELEASE

Brunswick Exploration Announces Appointment of Vice President – Intern...

Brunswick Exploration Announces Appointment of Vice President – International Projects MONTREAL, Feb. 27, 2026 (GLOBE NEWSWIRE) -- Brunswick Exploration Inc. (, ; ; “BRW” or the “Company”) is pleased to announce the appointment of Charles Kodors to Vice President – International Projects. Mr. Kodors has been with Brunswick Exploration since its rebranding in 2020 and has been instrumental in securing the Company’s international portfolio over the last three years. Mr. Killian Charles, President and CEO of BRW, commented: “Charles is a key part of Brunswick’s exploration team alongside Fr...

 PRESS RELEASE

Brunswick Exploration Files Maiden Mineral Resource Estimate NI 43-101...

Brunswick Exploration Files Maiden Mineral Resource Estimate NI 43-101 Technical Report for Mirage Project MONTREAL, Feb. 27, 2026 (GLOBE NEWSWIRE) -- Brunswick Exploration Inc. (, ; ; “BRW” or the “Company”) is pleased to announce that it has filed on SEDAR the “NI 43-101 Technical Report for the Mirage Maiden Mineral Resource Estimate, Eeyou Istchee James Bay, Quebec, Canada”, with an effective date of January 7, 2026. The Mineral Resource Estimate (“MRE”) was prepared in accordance with the National Instrument (“NI”) 43-101 standards by PLR Resource Inc. and Synectiq Inc. The full tec...

 PRESS RELEASE

Brunswick Exploration Announces Insider-Led Non-Brokered Life Private ...

Brunswick Exploration Announces Insider-Led Non-Brokered Life Private Placement NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES MONTREAL, Feb. 25, 2026 (GLOBE NEWSWIRE) -- Brunswick Exploration Inc. (, ; ; “BRW” or the “Corporation”) is pleased to announce a non-brokered private placement (the “Offering”) for the sale of up to 16,000,000 units of the Corporation (a “Unit”) at a price of $0.25 per Unit for gross proceeds of up to $4,000,000. Mr. Killian Charles, President and CEO of BRW, commented: "This financing comes at critical time ...

 PRESS RELEASE

Brunswick Exploration annonce un placement privé sans courtier mené pa...

Brunswick Exploration annonce un placement privé sans courtier mené par des initiés en vertu de la dispense pour financement de l’émetteur coté NE PAS DISTRIBUER AUX SERVICES DE FIL DE PRESSE  DES ÉTATS-UNIS NI DIFFUSER AUX ÉTATS-UNIS MONTRÉAL, 25 févr. 2026 (GLOBE NEWSWIRE) -- Brunswick Exploration Inc. (; ; ) (« BRW » ou la « société ») est heureuse d’annoncer un placement privé sans courtier (le « placement ») d’un maximum de 16 000 000 d’unités de la Société (une « unité ») au prix de 0,25 $ par unité pour un produit brut maximum de 4 000 000 $. M. Killian Charles, président et chef...

 PRESS RELEASE

Brunswick Exploration Identifies Seven New Spodumene Targets and Stake...

Brunswick Exploration Identifies Seven New Spodumene Targets and Stakes Additional Claims at Anatacau Main MONTREAL, Feb. 19, 2026 (GLOBE NEWSWIRE) -- Brunswick Exploration Inc. (, ; ; “BRW” or the “Company”) is pleased to announce it has identified three new high priority lithium targets (area A, B and C in Figure 1) at the Anatacau Main Project, where drilling is currently underway, located in the Eeyou-Istchee James Bay region of Quebec. The Project is strategically situated 22 kilometers east and along strike of a major proven lithium-bearing structural corridor also hosting Rio Tinto...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch