LTH LITHIUM IONIC CORP

Lithium Ionic drills best intercept to date at Salinas; 1.13% Li2O over 28m and 1.60% Li2O over 12m, incl. 2.00% Li2O over 8m, Minas Gerais, Brazil

Lithium Ionic drills best intercept to date at Salinas; 1.13% Li2O over 28m and 1.60% Li2O over 12m, incl. 2.00% Li2O over 8m, Minas Gerais, Brazil

TORONTO, Dec. 07, 2023 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) (“Lithium Ionic” or the “Company”) reports results from the ongoing drilling program at the Salinas Lithium Project (“Salinas”), located approximately 100 kilometres north of its Itinga group of properties which hosts the Feasibility-stage Bandeira lithium project and the Outro Lado lithium deposit (see press releases dated and ) (See location map, Figure 1). The Company’s landholdings of 14,182 hectares are situated within the lithium-rich Araçuaí Pegmatite District, also known as the “Lithium Valley”, in northern Minas Gerais State, Brazil, where two lithium producers currently operate.

The Company is actively working towards establishing an initial NI 43-101 resource estimate at Salinas in 2024. With four drill rigs currently operating, the team is focused on continuing to test and delineate multiple outcropping spodumene-rich pegmatite bodies. Approximately 24,000 metres (99 holes) have been completed at Salinas since drilling began in May 2023.

Salinas Drill Intercept Highlights:

  • 1.13% Li2O over 27.6m, including 1.34% Li2O over 9m representing a new record high intercept at Salinas from a grade X width perspective at one of the most scarcely drilled targets on the property (hole BGDD-23-109)
  • 1.60% Li2O over 11.9m, including 2.00% Li2O over 8m near surface, from 63m (hole BGDD-23-097)
  • 1.45% Li2O over 9.8m near surface, from 28.7m (hole BGDD-23-079)
  • 1.34% Li2O over 10m from 85m (hole BGDD-23-092)
  • 1.35% Li2O over 9m (hole BGDD-23-088)

Blake Hylands, P.Geo., Chief Executive Officer of Lithium Ionic, commented, “The latest drill results from Salinas, particularly our new record intercept, not only strengthens our confidence but also highlights the substantial potential of this developing asset. As we steadily progress towards an initial resource estimate on this property, it’s becoming increasingly clear that Salinas could emerge as a significant contributor to both the size and scale of the overall lithium resources we are delineating in this belt.”

Lithium Ionic acquired the Salinas group of properties in early 2023 from Neolit Minerals Participações Ltda. (“Neolit”; see press release dated ) and began selectively drilling the area in May 2023, following up on a 4,000-metre, 24-hole, drill program completed by the previous owner which yielded excellent results, including highlights of 1.53% Li2O over 11.4m, 1.22% Li2O over 13.8m, 1.71% Li2O over 9.8m and 1.19% Li2O over 13.4m. On , the Company reported initial results from its drilling program at Salinas, including highlights of 1.38% Li2O over 16m, 1.60% Li2O over 12m, 1.55% Li2O over 9m, 1.26% Li2O over 11m and 1.34% Li2O over 10m.



Figure 1. Salinas Lithium Project Location & Drill Intercept Highlights

View Figure 1 here: 

Table 1. Salinas Drill Results

Hole IDAzDipFromToMetresLi2O (%)
BGDD-23-0590-9032.7834.541.761.23
BGDD-23-061310-60168.62171.623.001.02
BGDD-23-063310-60230.30233.303.000.72
BGDD-23-067310-65136.35138.141.791.04
BGDD-23-071310-85212.75216.754.002.02
BGDD-23-074310



-85



141.44144.443.001.22
and148.44150.442.002.51
BGDD-23-076310-6079.3382.333.001.68
BGDD-23-079310-6028.6738.459.781.45
BGDD-23-0810-9046.1851.185.000.75
BGDD-23-0830-9061.6267.355.731.27
BGDD-23-084310-6034.9337.933.001.26
BGDD-23-085310



-60



22.9826.153.170.51
and58.6563.655.001.39
BGDD-23-088310-63232.46241.469.001.35
BGDD-23-091310-60182.70185.703.000.78
BGDD-23-092310



-60



84.8994.8910.001.34
including84.8990.896.001.72
BGDD-23-097310



-60



63.1275.0011.881.60
including64.0072.008.002.00
BGDD-23-109130











-80











8.0010.002.001.48
and108.26135.8427.581.13
including110.26119.269.001.34
including130.26135.845.581.39

*No significant results/values (nsv) for holes BGDD-23-062, BGDD-23-064, BGDD-23-065, BGDD-23-066, BGDD-23-068, BGDD-23-069, BGDD-23-070, BGDD-23-075, BGDD-23-078, BGDD-23-086, BGDD-23-087, BGDD-23-089, BGDD-23-090 and BGDD-23-108.

**Holes BGDD-23-072, BGDD-23-073, BGDD-23-077, BGDD-23-080, BGDD-23-082 and BGDD-23-093 were not sampled.

***Assays pending for holes: BGDD-23-094 to BGDD-23-096 and BGDD-23-098 to BGDD-23-107

About Lithium Ionic Corp.

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its Itinga and Salinas group of properties cover 14,182 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. Its Feasibility-stage Bandeira Project is situated in the same region as CBL’s Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

Quality Assurance and Control

During the drill program, assay samples were taken from NQ core and sawed in half. One-half was sent for assaying at SGS Laboratory, a certified independent commercial laboratory, and the other half was retained for results, cross checks, and future reference. A strict QA/QC program was applied to all samples. Every sample was processed with Drying, crushing from 75% to 3 mm, homogenization, quartering in Jones, spraying 250 to 300 g of sample in steel mill 95% to 150. SGS laboratory carried out multi-element analysis for ICP90A analysis.

Qualified Persons

The technical information in this news release has been reviewed and approved by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, who are both “qualified persons” as defined in NI 43-101.

The technical information relating to the historical exploration conducted by Neolit is historical in nature and has not been independently verified by Lithium Ionic. A qualified person, as defined in National Instrument 43-101, has not done sufficient work on behalf of Lithium Ionic to classify the historical drilling reported above as current mineral resources or mineral reserves and Lithium Ionic is not treating the historical drill results as current mineral resources or mineral reserves.

Investor and Media Inquiries:

+1 647.316.2500

Cautionary Note Regarding Forward-Looking Statements

This press release contains statements that constitute “forward-statements.” Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Although the Company believes, in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. When used in this press release, the words “estimate”, “project”, “belief”, “anticipate”, “intend”, “expect”, “plan”, “predict”, “may” or “should” and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release include information relating to the prospectivity of the Company’s mineral properties, the economic viability of the Bandeira, the mineralization and development of the Company’s mineral properties, the Company’s exploration program and other mining projects and prospects thereof, the Company’s ability to complete a Feasibility Study, the Company’s ability to complete an environmental impact assessment and obtain the requisite permitting and approvals and the Company’s future plans. Such statements and information reflect the current view of the Company. Risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.

Information and links in this press release relating to other mineral resource companies are from their sources believed to be reliable, but that have not been independently verified by the Company.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.



EN
07/12/2023

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on LITHIUM IONIC CORP

 PRESS RELEASE

Lithium Ionic Files NI 43-101 Technical Report for the Bandeira Lithiu...

Lithium Ionic Files NI 43-101 Technical Report for the Bandeira Lithium Project Feasibility Study TORONTO, July 11, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) reports that it has filed the independent NI 43-101 compliant technical report (the “Technical Report”) for its Bandeira Lithium Project (“Bandeira” or the “Project”) in Minas Gerais State, Brazil, supporting and validating the Feasibility Study (“FS”) results press released on . The Technical Report details a feasibility study that supports a robust project with strong economic viability, feat...

 PRESS RELEASE

Lithium Ionic Initiates Drilling at Four Properties Surrounding Bandei...

Lithium Ionic Initiates Drilling at Four Properties Surrounding Bandeira Development Project and Expands Salinas Drilling Program to 30,000m in the Lithium Valley, Minas Gerais, Brazil TORONTO, July 05, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. () (“Lithium Ionic” or the “Company”) is pleased to provide an update on expanded drilling activities at its extensive claim holdings, including the Itinga and Salinas area properties, located in the Lithium Valley, in Minas Gerais State, Brazil. Regional Drilling at Itinga Area Properties A 4,000-metre drilling program has been initiated on ...

 PRESS RELEASE

Lithium Ionic Enters Option Agreement to Acquire Up to 90% Interest in...

Lithium Ionic Enters Option Agreement to Acquire Up to 90% Interest in New Itinga Properties totaling 2,983 ha in the Lithium Valley, Minas Gerais, Brazil TORONTO, July 03, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. () (“Lithium Ionic” or the “Company”) is pleased to announce that its wholly-owned subsidiary, Neolit Minerals Participações Ltda (“Neolit”), has entered into an option agreement (the “Agreement”) with K2 Mineração e Exportação EIRELI, Super Clássico Comércio, Importação e Exportação Ltda. and Minerales Empreendimentos, Mineração e Participações Ltda. to acquire up to a 90% ...

 PRESS RELEASE

Lithium Ionic Completes Acquisition of Remaining 15% of Salinas Proper...

Lithium Ionic Completes Acquisition of Remaining 15% of Salinas Properties, Minas Gerais, Brazil TORONTO, June 11, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. () (“Lithium Ionic” or the “Company”) reports that, further to its press release, its wholly owned subsidiary, Neolit Minerals Participações Ltda (“Neolit”), has completed the acquisition of the remaining 15% of select Salinas properties (“Salinas” or the “Project”), located within the Curralinho Pegmatite Field of the lithium-rich Araçuaí Pegmatite District, in Minas Gerais, Brazil (the “Transaction”). Lithium Ionic now owns 100%...

 PRESS RELEASE

Lithium Ionic Signs Agreement to Acquire Remaining 15% of Salinas Prop...

Lithium Ionic Signs Agreement to Acquire Remaining 15% of Salinas Properties, Minas Gerais, Brazil TORONTO, May 30, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. () (“Lithium Ionic” or the “Company”) reports that its wholly owned subsidiary, Neolit Minerals Participações Ltda (“Neolit”), has entered into a binding agreement (the “Agreement”) to acquire the remaining 15% of select Salinas properties (“Salinas” or the “Project”), located within the Curralinho Pegmatite Field of the lithium-rich Araçuaí Pegmatite District, in Minas Gerais, Brazil (the “Transaction”). Upon closing of the Agree...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch