NMI. Kirkland Lake Gold Ltd.

Kirkland Lake Gold Reports High-Grade Intersections Southeast Of New #4 Shaft Location At Macassa

Kirkland Lake Gold Reports High-Grade Intersections Southeast Of New #4 Shaft Location At Macassa

  • New high-grade intersections within 560 metres ("m") of new #4 Shaft (currently under construction with Phase 1 scheduled for completion early in 2022)



  • High-grade gold intersections outside existing Mineral Resources demonstrate potential for continued resource growth

       •   Key intercepts: 241.0 grams per tonne (“g/t”) over 1.1 m true width, 24.3 g/t over 1.4 m true width, 54.2 g/t over 2.3 m true width



  • Footwall veins related to South Mine Complex (“SMC”) intersected 78 m east of existing Mineral Resources

       •   Key intercepts: 50.7 g/t over 0.8 m, 16.0 g/t over 0.7 m



  • High-potential area identified within SMC with grades in excess of 30 g/t and true widths greater than 3.0 m

       •   Key intercepts: 34.6 g/t over 3.7 m true width, 38.4 g/t over 3.9 m true width, 65.6 g/t over 3.6 m true width, 36.3 g/t over 4.2 m true width and 81.9 g/t over 3.0 m true width.

TORONTO, July 05, 2018 (GLOBE NEWSWIRE) -- Kirkland Lake Gold Ltd. (“Kirkland Lake Gold” or the “Company”) (TSX:KL) (NYSE:KL) (ASX:KLA) today reported new high-grade drill intersections from underground exploration drilling within the SMC at the Macassa Mine, Kirkland Lake, Ontario. The new results involve 20 holes for 7,560 m of underground drilling from the east exploration drift on the 5300-foot level (“5300 Level”). Underground drilling from the 5300 Level will continue throughout the remainder of 2018.

The new high-grade intersections are situated within the 259 m eastern extension of the SMC, first reported in June 2017 (see Kirkland Lake Gold News Release dated June 28, 2017). The new intersections result from a continuation of the 2018 infill drilling program, with previous results reported in April 2018 (see Kirkland Lake Gold News Release dated April 27, 2018). The results will support further Mineral Resource expansion, as all but two of the intersections are located outside of the existing Mineral Resource blocks. Of particular significance, the new results include high-grade intersections within Footwall veins 78 m to the east of existing Mineral Resources within the SMC. In addition, the results have identified a high-potential area within the eastern extension of the SMC, which includes high grades and true widths well in excess of those normally seen in the area.  The intersections reported today are located approximately 560 m south-southeast of the location for the new #4 Shaft, with Phase 1 targeted for completion early in 2022. By comparison, these intersections are approximately 2.1 km east of the current production shaft (the #3 Shaft).  

Tony Makuch, President and Chief Executive Officer of Kirkland Lake Gold, commented: “We continue to report encouraging drill results to the east and southeast of existing resources within the SMC. The new drill results increase our confidence that, going forward, we will see continued solid resource growth within the SMC mineralization, and also achieve high levels of resource conversion, leading to higher levels of Mineral Reserves. In 2017, we achieved substantial growth in Mineral Resources, increasing Measured and Indicated Resources by 58% (to 2.1 million ounces at an average grade of 17.1 g/t) and Inferred Resources by 48% (to 1.4 million ounces at an average grade of 22.2 g/t) compared to the prior year.  Through ongoing drilling, we are now poised to convert a high level of these resources, adding to our already large base of Mineral Reserves (2.03 million ounces at 21.0 g/t).  The large reserve and resource base at Macassa, as well as the considerable potential to identify new ounces through continued drilling success, was a key consideration in our decision to move forward with our #4 Shaft. Exploration work is continuing at the mine, with three underground drills in operation to further explore for Mineral Resource conversion and expansion opportunities in the SMC.”

Underground Drilling Program Defining, Upgrading and Expanding Mineral Resource Areas

Recent drilling conducted from the easternmost drill stations on the 5300 Level concentrated on follow up drilling in the eastern extension area first detailed in June 2017 and was a continuation of drilling reported in April 2018 (see Kirkland Lake Gold News Release dated April 27, 2018).  

The mineralization intersected with the new drill results is consistent with the SMC, striking east-west in the geology grid with dips between 17 and 30 degrees south. The dominant mineral present appears to be gold-bearing telluride calaverite, with visible gold also commonly being observed.  

A high-grade area with greater than average widths has been defined within the SMC mineralized envelope with a strike length of approximately 73 m and a dip component of 45 m. Within this area, drilling has shown, on average, grades >= 30 g/t and true widths >= 3.0 m.  Recent drill holes of note in this area include: 53-3453 (34.6 g/t over 3.7 m true width), 53-3455 (38.4 g/t over 3.9 m true width), 53-3466 (65.5 g/t over 3.6 m true width), and 53-3505 (36.3 g/t over 4.2 m true width). The mineralization remains open to the east and is bound to the south by the Amalgamated Break. Considered a potential feeder structure for the SMC, the Amalgamated Break has undergone significant post-ore movement.

Underground Development Now Advancing West Leg

As reported in the News Release dated April 27, 2018, underground development on 5300 Level will include a 152-m drift and drill bay extension to the west. To date, this drift has advanced 68 m. Exploration at this location will concentrate on locating and defining Mineral Resources, which could be developed in the short term. While this development is underway, one of the exploration drills on 5300 Level will be re-located to the recently completed far east drill bay to continue testing and expanding the SMC to the east. Subject to continued favourable results from this program, the 5300 Level east exploration drift may be extended an additional 152 m east.

To view a PDF of the figures referenced in this News Release, visit the links below. Tables are provided at the end of this News Release.

 – Figure 1

 – Figure 2

Qualified Person

The Company’s exploration programs at Macassa are conducted under the supervision of Stewart Carmichael, P.Geo., Regional Exploration Manager. Mr. Carmichael is the ‘qualified person’ for the purpose of National Instrument 43-101, Standards of Disclosure for Mineral Projects, of the Canadian Securities Administrators, and has reviewed and approved the scientific and technical information in this news release.

QA/QC Controls

The Company has implemented a quality assurance and control (“QA/QC”) program to ensure sampling and analysis of all exploration work is conducted in accordance with best practices. The drill core is sawn in half with one half of the core samples shipped to Swastika Laboratories in Swastika, Ontario. The other half of the core is retained for future assay verification. Other QA/QC includes the insertion of certified reference standards, blanks and the regular re-assaying of pulps and rejects at alternate certified labs. Gold analysis is conducted by fire assay using atomic absorption or gravimetric finish. The laboratory re-assays at least 10% of all samples and additional checks may be run on anomalous values.

About Kirkland Lake Gold Ltd.

Kirkland Lake Gold Ltd. is a mid-tier gold producer with 2018 production targeted at over 620,000 ounces of gold from mines in Canada and Australia. The production profile of the Company is anchored by two high-grade, low-cost operations, including the Macassa Mine located in Northeastern Ontario and the Fosterville Mine located in the state of Victoria, Australia. Kirkland Lake Gold's solid base of quality assets is complemented by district scale exploration potential, supported by a strong financial position with extensive management and operational expertise.

For further information on Kirkland Lake Gold and to receive news releases by email, visit the website .

Cautionary Note Regarding Forward-Looking Information

This Press Release contains statements which constitute ”forward-looking statements” within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to the future business activities and operating performance of the Company. The words “may”, “would”, “could”, “should”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and similar expressions, as they relate to the Company, are intended to identify such forward-looking statements. Investors are cautioned that forward-looking statements are based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made such as, without limitation, opinion, assumptions and estimates of management regarding the Company’s business, including but not limited to; the continued exploration programs on the SMC mineralization, the timing and results thereof; the ability to continue to expand the SMC and to increase its level of resources and the timing thereof; the potential to increase the level of Mineral Resources and Mineral Reserves; the anticipated completion date of the #4 shaft and potential impact and benefits thereof; the amount of future production over any period; and assumptions made relating to operating cash costs.  Such opinions, assumptions and estimates, are inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. These factors include the Company's expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), possible variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's corporate mineral reserves and resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and unanticipated weather changes, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance, as well as those risk factors discussed or referred to in the Company's annual Management's Discussion and Analysis and Annual Information Form for the year ended December 31, 2017, filed with the securities regulatory authorities in certain provinces of Canada and available at

Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements except as otherwise required by applicable law.

FOR FURTHER INFORMATION PLEASE CONTACT

Anthony Makuch, President, Chief Executive Officer & Director

Phone:

E-mail:

Mark Utting, Vice-President, Investor Relations

Phone:

E-mail:

Table 1: SMC East Underground Exploration (5300 Level)

Below summarizes the latest SMC East underground drilling results in metric values:

DRILL

HOLE
ZONEDIP

(degree)
AZIMUTH

(degrees)
FROM

(m)
TO

(m)
CORE

LENGTH

(m)
ASSAY

(g/t)
TRUE

WIDTH (m)


53-3405SMC-72342216.4217.51.1241.0

(83.0*)
1.1
Including 216.7217.00.3842.8, VG0.3
53-3406SMC-76347221.3222.91.624.31.4
  Including 222.5222.90.457.6, VG0.3
53-3407SMC-70354216.6217.71.19.31.0
Undefined Footwall227.0227.70.716.0?
53-3414SMC-74001222.4224.72.354.22.3
Incl. 223.3233.90.667.4, VG0.5
and 224.3224.70.4189.1, VG0.4
Undefined Footwall 241.1241.90.850.7?
53-3443SMC-64255245.5245.90.4NSVNC
53-3444SMC-70262234.5235.00.50.9NC
53-3445SMC-62262237.5238.00.512.90.4
53-3446SMC-65266239.2239.80.67.4NC
53-3447SMC-78270213.4216.4Intersected Diabase Dyke at Target
53-3448SMC-67270233.3233.60.3367.8

(240.0*),

Tell
0.3
Undefined Footwall262.5263.10.615.8?
53-3449SMC-61270229.0232.73.72.7NC
53-3450SMC-72274226.6226.90.3NSVNC
53-3451SMC-64274228.2229.10.97.2NC
53-3453SMC-75 

281 

222.2226.34.134.63.7
Including 222.2222.70.589.7, VG0.5
and 226.0226.30.3172.4, VG,

Tell
0.3
Undefined Footwall246.8247.10.386.8?
Undefined Footwall313.9317.83.916.8?
53-3454ASMC-64281223.3224.51.23.8NC
53-3455SMC-77292220.4224.64.238.43.9
Including 221.1221.40.393.4, VG0.3
and 221.4221.70.3137.3, VG0.3
and 223.7224.00.3122.1, VG0.3
Undefined Footwall304.2306.52.312.0?
53-3466SMC-69292218.7222.53.865.5

(61.0*)
3.6
Including 218.7219.20.5307.6, VG0.5
53-3505SMC-72278219.1223.44.336.34.2
Including 219.1219.50.475.4, VG0.4
and 219.9220.20.4104.9, VG0.4
and 222.7223.40.749.70.7
53-3506SMC-81319224.1225.81.745.91.4
Including 224.1224.50.4109.7, VG0.3
53-3511SMC-63266236.1239.02.96.52.7
         
NSV = No significant value, VG = Visible Gold; Tell = Tellurides; *Cut = cut to 274.0 g/t.
The top cut only applies to a single zone within the SMC where a statistical cut has been calculated. All other zones remain uncut.
NC = True widths not calculated.
? = True widths not calculated as additional drilling is required to ascertain geometry.
 



EN
05/07/2018

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Kirkland Lake Gold Ltd.

 PRESS RELEASE

Agnico Eagle and Kirkland Lake Gold Complete Merger Transaction

Agnico Eagle and Kirkland Lake Gold Complete Merger Transaction TORONTO , Feb. 08, 2022 (GLOBE NEWSWIRE) -- Agnico Eagle Mines Limited (TSX:AEM, NYSE:AEM) (“Agnico Eagle”) and Kirkland Lake Gold Ltd. (TSX:KL, NYSE:KL, ASX:KLA) (“Kirkland Lake Gold”) are pleased to announce the successful completion of the previously announced merger of equals transaction (the “Merger”). The combined company will continue as Agnico Eagle Mines Limited and will remain listed on the Toronto Stock Exchange (TSX) and New York Stock Exchange (NYSE) under the ticker “AEM”. In aggregate, Agnico Eagle issued appr...

Despite a better risk assessment and improving to Neutral, KIRKLAND LA...

KIRKLAND LAKE GOLD (CA), a company active in the Gold Mining industry, improves its market behaviour and slightly increases its general evaluation. The independent financial analyst theScreener just upgraded the stock market behaviour as moderately risky. At a fundamental level, theScreener confirms 1 out of 4 possible stars; the general evaluation is slightly increased to Neutral but the title remains under pressure. As of the analysis date February 4, 2022, the closing price was CAD 48.75 and ...

 PRESS RELEASE

Agnico Eagle & Kirkland Lake Gold Announce Receipt of FIRB Approval, A...

Agnico Eagle & Kirkland Lake Gold Announce Receipt of FIRB Approval, Anticipated Closing Date for Merger and Notice of Release of Agnico Eagle’s Fourth Quarter and Full Year 2021 Results TORONTO, Feb. 01, 2022 (GLOBE NEWSWIRE) -- Agnico Eagle Mines Limited (TSX:AEM, NYSE:AEM) (“Agnico Eagle”) and Kirkland Lake Gold Ltd. (TSX:KL, NYSE:KL, ASX:KLA) (“Kirkland Lake Gold”) are pleased to announce that approval has been received from Australia’s Foreign Investment Review Board (“FIRB Approval”) regarding the proposed merger of equals between Agnico Eagle and Kirkland Lake Gold (the “Merger”) b...

 PRESS RELEASE

Kirkland Lake Gold and Rogers Business Launch 5G Wireless Private Netw...

Kirkland Lake Gold and Rogers Business Launch 5G Wireless Private Network at Detour Lake Mine Detour Lake becomes first mining operation in Canada to be fully connected over 5G Wireless Private Network Dedicated 5G network key to transforming Detour Lake into Smart Digital Mine of the future Kirkland Lake Gold and Rogers to bring more than 180 km of connectivity for the local community with 8 new wireless towers along Highway 652, north of Cochrane, Ontario TORONTO, Jan. 26, 2022 (GLOBE NEWSWIRE) -- Kirkland Lake Gold Ltd. (“Kirkland Lake Gold” or the “Company”) (TSX:KL) (NYSE:KL) (AS...

 PRESS RELEASE

Kirkland Lake Gold Reports Record Production in Fourth Quarter and Ful...

Kirkland Lake Gold Reports Record Production in Fourth Quarter and Full-Year 2021 TORONTO, Jan. 17, 2022 (GLOBE NEWSWIRE) -- Kirkland Lake Gold Ltd. (“Kirkland Lake Gold” or the “Company”) (TSX:KL) (NYSE:KL) (ASX:KLA) today announced record quarterly and full-year production for the fourth quarter of 2021 (“Q4 2021”) and full-year of 2021 (“FY 2021”), respectively. Q4 2021 production totalled 380,472 ounces driven by record quarterly production at Detour Lake Mine of 210,980 ounces and a 33% increase in production at the Macassa Mine compared to the previous quarter (“Q3 2021”) to 61,336 ...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch