PDM Palladium One Mining

DGAP-News: Palladium One Obtains KS, Massive Sulphide Cu-Ni-PGE Project in Finland

DGAP-News: Palladium One Mining Inc. / Key word(s): Miscellaneous
Palladium One Obtains KS, Massive Sulphide Cu-Ni-PGE Project in Finland

02.04.2020 / 12:30
The issuer is solely responsible for the content of this announcement.


Vancouver, British Columbia--(Newsfile Corp. - April 2, 2020) - Palladium One Mining Inc. (TSXV: PDM) (FSE: 7N11) (OTC Pink: NKORF) (the "Company" or "Palladium One") reports that the Company has received approval from the Finnish Mining Authority for a ~20,000-hectare Reservation, Kostonjarvi (KS), which is adjacent to the Company's Flagship Läntinen Koillismaa (LK) Project in Central Finland.

The KS reservation covers a large buried gravity and magnetic anomaly that is interpreted to represent a buried Feeder Dyke to the Koillismaa Complex which hosts the palladium dominant, LK PGE-nickel-copper project (Figure 1). While the LK and KS projects are contiguous, the targets are very different: The LK project is an open pit style, with disseminated sulphide mineralization along the prospective basal unit of the Koillismaa complex, with similarities to Platreef type deposits. Whereas the KS project target is underground, high-grade massive sulphide, in the feeder system (Feeder Dyke) of the Koillismaa Complex, similar to a Norlisk, or Voisey's Bay type deposit (Figure 2).

"KS is 100% owned, royalty free, of district-scale, and has been the subject of extensive academic research. Just as with our palladium dominant LK project, KS is under-explored, notably where it connects to the Koillismaa Complex. The KS exploration targets are "traps" in the Feeder Dyke with the potential to host massive sulphide accumulation.

The Company now possesses two significant projects in Finland with potential for large mineralized systems with similarities to Platreef and Norilsk style deposits.

Holding costs for KS are zero until the reservation is converted into an exploration permit.

As at March 31, 2020 the Company had cash and equivalents of $2.6 million (unaudited), estimated net-working-capital of $2.5 million (unaudited) and no debt," commented Derrick Weyrauch, President and CEO



Figure 1. Geology of Central Finland showing the Koillismaa Complex, Narankavaara Intrusion and buried "connecting dyke".

To view an enhanced version of Figure 1, please visit:



Figure 2. 3D model of the buried connector dyke (modified from Salmirinne and Iljina 2003) and schematic long section of the Voisey's Bay deposit.

To view an enhanced version of Figure 2, please visit:

Interpretation

The buried Feeder Dyke creates an impressive gravity (Figure 3) and magnetic (Figure 4) anomaly suggesting a large accumulation of ultramafic cumulate rocks, and hence a significant amount of magma flow through the conduit system. The Feeder Dyke, like the Koillismaa Complex, has undergone greenschist facies, metamorphism and deformation. This deformation broke up the originally sill-like Koillismaa Complex in the various "blocks" we see today. It has also deformed the Feeder Dyke, likely contributing to its proposing-like nature. The Feeder Dyke begins at the ultramafic Narankavaaara intrusion and then dives to a depth of 3-5km before coming near surface again where it's interpreted to connect to the Koillismaa Complex. Substantial academic effort, including magnetic, gravity, and seismic studies have been directed toward modelling the buried Feeder Dyke, yet very little exploration has been conducted. The KS project covers the western one-third of the buried Feeder Dyke anomaly where it has been modelled to shallower depths and is interpreted to eventually connect to the Koillismaa complex (Figure 1, 3 and 4).



Figure 3. Regional Bouger Gravity.

To view an enhanced version of Figure 3, please visit:



Figure 4. Regional Airborne Total Field Magnetics.

To view an enhanced version of Figure 4, please visit:

An important marker unit of the Feeder Dyke is the presence on surface of a pseudoconglomerate directly above the gravity high, which consists of sheared and intensely thermally assimilated orthogneiss (Figure 5). This unit is interpreted to mark a pre-existing Archean structure which the Feeder Dyke exploited and the pseudoconglomerate is a result of hydrothermal fluids escaping upwards from the magma below. The structure is mapped to within less than one kilometer of the Koillismaa Complex and may mark where the Feeder Dyke connects to the Complex.



Figure 5. Mapped extent of the pseudoconglomerate (left) and pseudoconglomerate in outcrop (right).

To view an enhanced version of Figure 5, please visit:

Neil Pettigrew, Vice President Exploration, commented, "The KS project is a unique opportunity to leverage robust academic studies to discover massive Cu-Ni-PGE sulphides contiguous to our existing flagship LK project. The tenor of the LK project's disseminated sulphide mineralization is very high, if massive sulphides can be located with similar tenor, then the in-situ value of this mineralization could be very substantial."

Additional Reservation Applications

In addition to the KS project the Company has applied for two additional reservations Kaukuanjarvi and Haukiaho North. Preliminary results form this winter's IP survey, and a review of regional airborne geophysics, indicates an east-west magnetic trend which may be an extension of Kaukua-style mineralization into an area of heavy overburden, beyond the mapped Kaukua area mafic-ultramafic rocks. As such, the Company has applied for a 9,100-hectare reservation (Kaukuanjarvi) (Figure 6). In addition, the Company has also applied for a second 2,140-hectare reservation (Haukiaho North) covering the down dip extension of the Haukiaho mineralized Trend (Figure 6). Reservation are granted for 1-2 years periods and have no fees until they are converted in into exploration permits.

Permitting update.

The Company is also pleased to report that the Salmivaara 2-11 exploration permit has gained legal force. The Company now has three permits that have cleared the appeals process, and enforcement decisions have been granted on another five permits thereby enabling exploration to be conducted on eight permits. The Company holds nine permits (3,845 hectares), three reservations (20,991 hectares), and two reservation applications (11,235 hectares), for a total of 32,226 hectares (Figure 6).



Figure 6. LK and KS Property positions.

To view an enhanced version of Figure 6, please visit:

Qualified Person

The technical information in this release has been reviewed and verified by Neil Pettigrew, M.Sc., P. Geo, Vice President of Exploration and a director of the Company and the Qualified Person as defined by National Instrument 43-101.

About Palladium One

Palladium One Mining Inc. is a palladium dominant, PGE, nickel, copper exploration and development company. Its assets consist of the Lantinen Koillismaa ("LK") and Kostonjarvi ("KS") PGE-Cu-Ni projects, located in north-central Finland and the Tyko Ni-Cu-PGE property, near Marathon, Ontario, Canada. All three projects are 100% owned and are of a district scale. LK is an advanced project targeting disseminated sulphide along 38 kilometers of favorable basal contact. The KS project is targeting massive sulphide within a 20,000-hectare land package covering a regional scale gravity and magnetic geophysical anomaly. Tyko is a 13,000-hectare project targeting nickel dominated disseminated and massive sulphide is a highly metamorphosed Archean terrain.

The Kaukua deposit of the LK project hosts a pit- constrained resource of 635,600 Pd_Eq ounces of Indicated Resources grading 1.80 g/t Pd_Eq* ("palladium equivalent") contained in 11 million tonnes (@ 0.81g/t Pd, 0.27g/t Pt, 0.09g/t Au, (1.17g/t PGE), 0.15% Cu & 0.09% Ni), and 525,800 Pd_Eq ounces of Inferred Resources grading 1.50 g/t Pd_Eq contained in 11 million tonnes (@ 0.64g/t Pd, 0.20g/t Pt, 0.08g/t Au (0.92g/t PGE), 0.13% Cu, & 0.08% Ni), (see press release September 9, 2019). Kaukua is open for expansion, while the Kaukua South, Murtolampi and Haukiaho mineralized zones require systematic exploration via diamond drilling to follow up mineralized drill intercepts.

*Pd_Eq is calculated using the following metal prices (in USD) of $1,100/oz for Pd, $950/oz for Pt, $1,300/oz for Au, $6,614/t for Cu and $15,432/t for Ni.

ON BEHALF OF THE BOARD
"Derrick Weyrauch"
President & CEO, Director

For further information contact:
Derrick Weyrauch, President & CEO
Email:
Phone: 1-778-327-5799

Neither the TSX Venture Exchange nor its Market Regulator (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release is not an offer or a solicitation of an offer of securities for sale in the United States of America. The common shares of Palladium One Mining Inc. have not been and will not be registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from registration.

Information set forth in this press release may contain forward-looking statements. Forward-looking statements are statements that relate to future, not past events. In this context, forward-looking statements often address a company's expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in palladium and other commodity prices; title matters; environmental liability claims and insurance; reliance on key personnel; the absence of dividends; competition; dilution; the volatility of our common share price and volume; and tax consequences to Canadian and U.S. Shareholders. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change. Investors are cautioned against attributing undue certainty to forward-looking statements.

54057_7c60bc3ec4c558d1_logo.jpg

To view the source version of this press release, please visit

169

Click on, or paste the following link into your web browser,to view the associated documents /release/54057
News Source: Newsfile


02.04.2020 Dissemination of a Corporate News, transmitted by DGAP - a service of EQS Group AG.
The issuer is solely responsible for the content of this announcement.

The DGAP Distribution Services include Regulatory Announcements, Financial/Corporate News and Press Releases.
Archive at


Language: English
Company: Palladium One Mining Inc.
Canada
ISIN: CA69644D1087
EQS News ID: 1013843

 
End of News DGAP News Service

1013843  02.04.2020 

fncls.ssp?fn=show_t_gif&application_id=1013843&application_name=news&site_id=research_pool
EN
02/04/2020

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Palladium One Mining

 PRESS RELEASE

Palladium One Tyko Copper-Nickel Project Update

Toronto, Ontario--(Newsfile Corp. - November 16, 2021) - Palladium One Mining (TSXV: PDM) (FSE: 7N11) (OTCQB: NKORF) ("Palladium One" or the "Company") is pleased to provide the following updates in regard to its award winning Tyko Copper-Nickel Project which returned up to 10.1% Ni_Eq* over 3.8 meters (8.1% Ni, 2.9% Cu, 0.1% Co, 0.61g/t Pd, 0.71g/t Pt, and 0.02g/t Au) in hole TK-20-023 (See news release ).Geophysical crews are on-site conducting ground-based Electromagnetic ("EM") surveys on key target areas. Ground-based surveying is being carried out to more accurately model the various con...

 PRESS RELEASE

Palladium One Expands the Tyko Sulphide Nickel-Copper Project to 24,50...

KEY HIGHLIGHTSTwo Earn-in agreements expand the Tyko Nickel-Copper Project by 950 hectaresAdditionally, 3,500 hectares were purchased from the original Optionors of the Tyko Project. Tyko Nickel-Copper Project currently over 24,500 hectares3,100-kilometer airborne Electro Magnetic (VTEMmax) geophysical survey completedSummer exploration field crews are onsite conducting reconnaissance mapping, prospecting and soil sampling. The first 1,000 soil samples have been sent for assaying, results pendingToronto, Ontario--(Newsfile Corp. - July 27, 2021) - The footprint of the Tyko Nickel-Copper Projec...

 PRESS RELEASE

Palladium One IP Anomaly Increased over 75%, to More than 7 km at Kauk...

HighlightsKaukua South IP anomaly expanded to over 7 kilometers in length, from ~4 kilometers.IP has proven to be a reliable tool for targeting high-grade mineralization.A new and, the largest and strongest anomaly in the Kaukua area has been discovered immediately west of the NI43-101 Kaukua pit-constrained Resource.Additionally, a new large IP anomaly has been discovered on the far east side of Kaukua South. This may represent a new high-grade core zone of mineralization.The Kaukua South IP anomaly has been extended northwest and to the south of the Kaukua pit-constrained Resource, thereby p...

 PRESS RELEASE

Palladium One Drills 7.4% Ni_Eq (164 lbs/tonne) over 4.5 Meters Includ...

KEY HIGHLIGHTSNickel-copper continuity confirmed along 350-meter, near surface, strike length.10.2% Ni_Eq (224 lbs/tonne) over 1.7 meters, within 7.4% Ni_Eq (164 lbs/tonne) over 4.5 meters, from 5 meters down hole (TK21-035), Upper Plate.8.8% Ni_Eq (193 lbs/tonne) over 0.5 meters, within 5.8% Ni_Eq (127 lbs/tonne) over 2.5 meters, from 98 meters down hole (TK21-040), Lower Plate.8.3% Ni_Eq (182 lbs/tonne) over 1.7 meters, within 6.0% Ni_Eq (131 lbs/tonne) over 2.4 meters, from 130 meters down hole (TK21-041), Lower Plate.Current nickel price is approximately US$8.0 per pound.Toronto, Ontario--...

 PRESS RELEASE

Palladium One Intercepts More High-Grade Nickel Including, 6.0% Nickel...

Second conductor confirmed to host high-grade massive to semi massive sulphide mineralization.Nickel-copper continuity confirmed along 350-meter, near surface, strike length.9.5% Ni_Eq over 1.7 meters, within 6.0% Ni_Eq over 5.0 meters, from 66 meters down hole (TK21-034).9.0% Ni_Eq over 0.9 meters, within 7.8% Ni_Eq over 3.1 meters, from 31 meters down hole (TK21-029).7.7% Ni_Eq over 1.1 meters, within 7.0% Ni_Eq over 3.5 meters, from 45 meters down hole (TK21-030).Toronto, Ontario--(Newsfile Corp. - June 17, 2021) - Initial results have been received from the Phase II Tyko drill program said...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch