PLCS Polarcus Limited

Polarcus COVID-19 response and 2020 cost reduction plan

Polarcus COVID-19 response and 2020 cost reduction plan

Polarcus Limited ("Polarcus" or the "Company") (OSE: PLCS) announces enhanced business continuity measures and a USD 15 million cost reduction plan to navigate the current uncertainty facing the marine seismic acquisition market due to the combined impacts of the COVID-19 pandemic and oil price volatility. These initiatives will ensure Polarcus maintains efficient operations, in addition to strengthening the financial resilience of the Company through 2020.

Mitigating the impact of COVID-19

Polarcus’ ongoing priority is the safety, health and wellbeing of all our people, their families and the communities in which we operate.

The entire Polarcus onshore support organization has been operating its smart-working model since 16 March 2020. All onshore personnel have been working from home with seamless connectivity, full functionality and maintaining the high-quality level of support to offshore operations, clients and suppliers for which Polarcus is well-known.

Offshore, Polarcus has implemented a robust regime of health screening for all field crew prior to travelling from home, immediately before joining a vessel and thereafter at regular intervals throughout operations offshore. All Polarcus vessels carry medical teams onboard with fully equipped hospital facilities and the ability to isolate crew members if required.

Polarcus has performed a detailed COVID-19 pandemic risk assessment and has prepared a response plan, customised for each project, that is shared with clients and provides assurances for the continuity of ongoing operations.

2020 cost reduction plan

The main elements of the plan that will deliver cash savings of over USD 15 million in 2020 include:

  • Reducing personnel cost onshore and offshore by approximately USD 6.5 million through a combination of redundancies and a reduction in base salary for Polarcus employees for six months effective 1 April 2020. This entails a 25% reduction in base salary at senior levels and a 15% reduction applied to the remainder of the organization. In addition, the decision has been taken not to pay the 2019 annual bonus;
  • Reducing G&A cost by approximately USD 1.5 million as a result of anticipated lower activity levels and implementation of focused cost reduction measures across the organization; and
  • Reducing cash capex by approximately USD 7 million through the freezing of uncommitted expenditure.

Further cash savings are expected to be realised through warm stacking vessels in between projects and associated, disciplined reduction in offshore operating cost. This will mitigate the anticipated elevated idle time of the Polarcus fleet in the coming months.

The combination of these business continuity and cost reduction initiatives provides a robust framework for Polarcus to navigate the current uncertainty and to position the Company to capture an increased level of activity going in to 2021.

 

Contacts

Duncan Eley, CEO

5

Hans-Peter Burlid, CFO

5

 

About Polarcus



Polarcus (OSE: PLCS) is a focused geophysical service provider of safe and environmentally responsible marine acquisition services globally. Our geophysical offering is driven by innovation and collaboration to provide clients with better seismic data faster. Polarcus operates a fleet of high performance seismic vessels with 3D and 4D imaging capabilities, which incorporate leading-edge technologies for improved environmental performance and operational efficiency. Polarcus offers contract seismic surveys and multi-client projects with advanced priority processing solutions including Cirrus, a suite of cloud-based applications and services designed to bring clients closer to acquired seismic data, enabling faster and better informed exploration decisions. The Company services its clients globally from its head office in Dubai and regional offices located in Houston, London, Singapore and delivers Group asset management services from Oslo. For more information, visit

This information is subject to the disclosure requirements pursuant to section 5 -12 of the Norwegian Securities Trading Act.

EN
31/03/2020

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Polarcus Limited

Jon Masdal
  • Jon Masdal

US GoM round back on calendar

Following the legal battle and indications last week that a US GoM licensing round was moving forward, the US Department of the Interior announced yesterday that it intends to hold licensing round 257 this autumn, with all regular US GoM acreage included. We believe that uncertainty on future rounds has hampered multi-client sales in the US for the seismic companies, and see this development as a positive. Out of our coverage, TGS has the highest US exposure, although the main contributor to the...

Jon Masdal
  • Jon Masdal

Polarcus (No_rec, TP: NOK) - Discontinuing coverage

We have discontinued coverage of Polarcus. Our last published recommendation, target price and estimates should no longer be relied upon.

Martin Huseby Karlsen
  • Martin Huseby Karlsen

More detail on licensing round

Ahead of the white paper on Friday, the government provided more details on offshore wind development in Norway. The bottom-fixed areas will be developed without state-aid, and awards will follow an auction in early 2022. Floating areas will be awarded on qualitative criteria and receive government support (level not yet decided). Both areas will be split into 2–3 licences, which will allow multiple consortiums to be awarded. While we believe the planned sizes (in GW) allow for critical mass, th...

Martin Huseby Karlsen
  • Martin Huseby Karlsen

Crowded and high-profile in Norway

The initial licensing rounds for offshore wind acreage in Norway are lining up to be competitive, with several high-profile local companies/consortiums already having announced their intention to participate. In addition, we would expect traditional renewables producers and international E&P companies to take part. Currently there is limited clarity on how the licensing process will work, but more details are expected in a government white paper (‘Stortingsmelding’) on 11 June. Although the winn...

Jon Masdal
  • Jon Masdal

And then there were two

We believe Shearwater’s acquiring the former Polarcus vessels was the best outcome for the industry. We expect a disciplined approach to future capacity additions; however, with a low-cost offering and more optimal fleet size, we believe Shearwater will gain market share from PGS.

ResearchPool Subscriptions

Get the most out of your insights

Get in touch