PRYM Prime Mining

Prime Mining Doubles Los Reyes Land Position To 13,800 Hectares

Prime Mining Doubles Los Reyes Land Position To 13,800 Hectares

VANCOUVER, British Columbia, March 10, 2021 (GLOBE NEWSWIRE) -- Prime Mining Corp. (“Prime” or the “Company”) (TSX-V: PRYM, OTCQB: PRMNF, Frankfurt: A2PRDW) is pleased to announce it has filed an application for mineral rights to a 7,500-hectare claim block, named El Rey, adjacent to the eastern and northeastern Los Reyes boundary. El Rey had its cornerstone monument erected and completed February 24, 2021 and the concession application was filed and receipted March 9, 2021.

“Recent prospecting, surface sampling, and drilling results suggest the Eastern regions of Los Reyes are likely very prospective. Current work has identified low sulfidation epithermal-style mineralization at 540 to 1080 metres (“m”) above sea level at the Guadalupe East deposit and at historic adits some two kilometres to the east, respectively. We are now more confident that the local mineralized system is at least 500 m in vertical height,” Daniel Kunz, Chief Executive Officer of Prime Mining Corp commented.

An infographic accompanying this announcement is available at: 

Update on Drilling

The initial delays in drilling progress that occurred at Los Reyes have been overcome. Progress is being made in the drilling program, with fifteen core holes completed and five ongoing with the resultant core at various stages of preparation, assay, and analyses. The Company expects to have enough data to issue its first news release on drilling results next week.

Airborne Geophysics Survey Underway

Prime has also initiated a property-wide 1,000 line-kilometre helicopter-borne high resolution aeromagnetic survey over the Los Reyes property. Following the magnetic survey, a LIDAR (Light Detection and Ranging) and Orthophoto survey will be completed. These surveys will aid in the ongoing geological mapping of the Los Reyes property and provide critical information on the numerous partially tested and untested structures that host Au-Ag epithermal veins.

Community Support

Prime has a longstanding relationship with the Cosala community and is providing support for the local communities including Ejido Tasajera. Now in the dry season, the Company’s subsidiary, Minera Amari, recently began work to provide drinking water access to local livestock. During the last rainy season, the Company helped families with repair of flood-damaged home foundations and provided strategic road and drainage grading.

Qualified Person

Kerry Sparkes, P.Geo., Executive Vice President of Exploration, is a qualified person for the purposes of National Instrument 43-101 and has reviewed and approved the technical content in this news release.

Los Reyes Gold and Silver Project

Los Reyes is a district scale low sulphidation epithermal gold-silver project located in a prolific mining region of Mexico. Over $20 million in exploration, engineering and prefeasibility studies have been spent on the project over 2 1/2 decades by previous operators with development plans being held back due to declining gold prices. Historic data coupled with an existing and recently updated resource estimate has provided sufficient understanding to fast-track the project to production. However, there is substantial resource expansion upside based on open extensions of known deposits, multiple untested high priority exploration targets, and only 40% of the known structures systematically explored leaving 10 kilometres of untested strike length. Potential for significant growth of the resource remains strong.

Current Measured and Indicated pit-constrained oxide mineral resources include 19.8 million tonnes (‘mt’) containing 633,000 ounces of gold at 1.0 g/t and 16,604,000 ounces of silver at 26.2 g/t plus an additional 7.1 mt Inferred containing 179,000 ounces gold at 0.78 g/t and 6,831,000 ounces silver at 30 g/t.

About Prime Mining

Prime Mining, a TSX Venture 50 Company, is an ideal mix of successful mining executives, strong capital markets personnel and experienced local operators who have united to build a low cost, near-term gold producer at the historically productive Los Reyes project in Mexico. Prime Mining has a well-planned capital structure with significant team and insider ownership.

ON BEHALF OF THE BOARD OF DIRECTORS

Daniel Kunz

Chief Executive Officer

For further information, please contact:

Daniel Kunz

Chief Executive Officer and Director

Prime Mining Corp.

1307 S. Colorado Ave.

Boise, Idaho 83706

Telephone: 1-208-926-6379 office

email:

Andrew Bowering

Executive Vice President and Director

Prime Mining Corp.

1507 – 1030 West Georgia Street

Vancouver, BC, V6E 2Y3

Telephone: (604) 428-6128

Facsimile: (604) 428-6430

E:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Information

Information set forth in this document may include forward-looking statements. While these statements reflect management's current plans, projections, and intents, by their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond the control of the Company. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on these forward-looking statements. There is no assurance the transactions noted above will be completed on the terms as contemplated, or at all. The Company’s actual results, programs, activities, and financial position could differ materially from those expressed in or implied by these forward-looking statements.



EN
10/03/2021

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Prime Mining

 PRESS RELEASE

Prime Announces Voting Results of 2025 AGM

Prime Announces Voting Results of 2025 AGM VANCOUVER, British Columbia, June 19, 2025 (GLOBE NEWSWIRE) -- Prime Mining Corp. (“Prime” or the “Company”) (TSX: PRYM) (OTCQX: PRMNF) (Frankfurt: O4V3) announces that shareholder voting at the Company's Annual General and Special Meeting of shareholders held on June 19, 2025 (the “Meeting”) has resulted in the election of all the directors listed as nominees in management's information circular dated May 5, 2025 (the “Circular”), as well as the approval of all matters presented. Summaries of the results of voting are provided below. Prime is f...

 PRESS RELEASE

Prime Announces Completion of June Warrant Exercise

Prime Announces Completion of June Warrant Exercise Current Cash Balance of $33M Funds Activities Through 2026 VANCOUVER, British Columbia, June 17, 2025 (GLOBE NEWSWIRE) -- Prime Mining Corp. (“Prime” or the “Company”) (TSX: PRYM) (OTCQX: PRMNF) (Frankfurt: O4V3) announces that 97% of its $1.10 warrants due June 12, 2025 have been exercised, which, including the exercise of certain options, have increased Prime’s cash balance to almost $33 million dollars as of today. Proceeds will contribute to the advancement of Prime’s wholly-owned Los Reyes gold-silver project (“Los Reyes” or the “...

 PRESS RELEASE

Prime Announces Selection of Ausenco to Lead PEA Study Work

Prime Announces Selection of Ausenco to Lead PEA Study Work Preliminary Economic Assessment Targeted for Completion in Q3/2025[with Clarification of Current Drilling Status] VANCOUVER, British Columbia, May 28, 2025 (GLOBE NEWSWIRE) -- Prime Mining Corp. (“Prime” or the “Company”) (TSX: PRYM) (OTCQX: PRMNF) (Frankfurt: O4V3) announces that it has selected Ausenco Engineering Canada ULC (“Ausenco”) to lead the study work for a Preliminary Economic Assessment (“PEA”) on its wholly-owned Los Reyes gold-silver project (“Los Reyes” or the “Project”) located in Sinaloa State, Mexico. The ...

 PRESS RELEASE

Prime Announces Selection of Ausenco to Lead PEA Study Work

Prime Announces Selection of Ausenco to Lead PEA Study Work Preliminary Economic Assessment Targeted for Completion in Q3/2025 VANCOUVER, British Columbia, May 27, 2025 (GLOBE NEWSWIRE) -- Prime Mining Corp. (“Prime” or the “Company”) (TSX: PRYM) (OTCQX: PRMNF) (Frankfurt: O4V3) announces that it has selected Ausenco Engineering Canada ULC (“Ausenco”) to lead the study work for a Preliminary Economic Assessment (“PEA”) on its wholly-owned Los Reyes gold-silver project (“Los Reyes” or the “Project”) located in Sinaloa State, Mexico. The Company is targeting the delivery of a PEA reflect...

 PRESS RELEASE

Prime Mining Reports Q1 2025 Financial and Operating Results

Prime Mining Reports Q1 2025 Financial and Operating Results VANCOUVER, British Columbia, May 12, 2025 (GLOBE NEWSWIRE) -- Prime Mining Corp. (“Prime” or the “Company”) (TSV: PRYM) (OTCQX: PRMNF) (Frankfurt: O4V3) is pleased to report its operating and financial results for the quarter ended March 31, 2025. Prime is focused on the exploration and development of its wholly owned high-grade Los Reyes Gold-Silver Project in Sinaloa State, Mexico (“Los Reyes” or the “Project”). Prime Chief Executive Officer Scott Hicks commented, “The Prime team continued to progress our technical understand...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch