SOC Subsea 7 S.A.

Subsea7 awarded a contract for the Bittern field in the UK North Sea

Subsea7 awarded a contract for the Bittern field in the UK North Sea

Luxembourg – 14 June 2024 - Subsea7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a sizeable1 contract by Dana Petroleum (E&P) Limited, for the Bittern field development, located approximately 190km east of Aberdeen in the UK Central North Sea, at a water depth of 90 metres.

The contract scope includes project management, engineering, procurement, construction and installation (EPCI) of a 22km 12” water injection pipeline. Subsea7’s scope also includes associated subsea structures and tie-ins at the Triton Floating Production Storage & Offloading (FPSO) vessel and the Bittern field.

Project management and engineering work will commence immediately in Aberdeen. The offshore activities are scheduled for Q3 2025.

Steve Wisely, Senior Vice President of UK and Global Inspection, Repair and Maintenance, Subsea7, said: "We are pleased that Dana Petroleum has chosen Subsea7 to provide project management expertise and engineering technical knowledge for this important field development. We look forward to supporting Dana in meeting their project objectives and for the opportunity to play a key role in the safe and successful completion of Bittern."

  1. Subsea7 defines a sizeable contract as being between $50 million and $150 million



*******************************************************************************

Subsea7 is a global leader in the delivery of offshore projects and services for the evolving energy industry, creating sustainable value by being the industry’s partner and employer of choice in delivering the efficient offshore solutions the world needs.

Subsea7 is listed on the Oslo Børs (SUBC), ISIN LU0075646355, LEI 222100AIF0CBCY80AH62.

*******************************************************************************

Contact for investment community enquiries:

Katherine Tonks

Investor Relations Director

Tel 8

Contact for media enquiries:

Michelle Wainwright

UK & Global IRM Communications Manager

Tel +44 (0)7876778370

Forward-Looking Statements: This document may contain ‘forward-looking statements’ (within the meaning of the safe harbour provisions of the U.S. Private Securities Litigation Reform Act of 1995). These statements relate to our current expectations, beliefs, intentions, assumptions or strategies regarding the future and are subject to known and unknown risks that could cause actual results, performance or events to differ materially from those expressed or implied in these statements. Forward-looking statements may be identified by the use of words such as ‘anticipate’, ‘believe’, ‘estimate’, ‘expect’, ‘future’, ‘goal’, ‘intend’, ‘likely’ ‘may’, ‘plan’, ‘project’, ‘seek’, ‘should’, ‘strategy’ ‘will’, and similar expressions. The principal risks which could affect future operations of the Group are described in the ‘Risk Management’ section of the Group’s Annual Report and Consolidated Financial Statements. Factors that may cause actual and future results and trends to differ materially from our forward-looking statements include (but are not limited to): (i) our ability to deliver fixed price projects in accordance with client expectations and within the parameters of our bids, and to avoid cost overruns; (ii) our ability to collect receivables, negotiate variation orders and collect the related revenue; (iii) our ability to recover costs on significant projects; (iv) capital expenditure by oil and gas companies, which is affected by fluctuations in the price of, and demand for, crude oil and natural gas; (v) unanticipated delays or cancellation of projects included in our backlog; (vi) competition and price fluctuations in the markets and businesses in which we operate; (vii) the loss of, or deterioration in our relationship with, any significant clients; (viii) the outcome of legal proceedings or governmental inquiries; (ix) uncertainties inherent in operating internationally, including economic, political and social instability, boycotts or embargoes, labour unrest, changes in foreign governmental regulations, corruption and currency fluctuations; (x) the effects of a pandemic or epidemic or a natural disaster; (xi) liability to third parties for the failure of our joint venture partners to fulfil their obligations; (xii) changes in, or our failure to comply with, applicable laws and regulations (including regulatory measures addressing climate change); (xiii) operating hazards, including spills, environmental damage, personal or property damage and business interruptions caused by adverse weather; (xiv) equipment or mechanical failures, which could increase costs, impair revenue and result in penalties for failure to meet project completion requirements; (xv) the timely delivery of vessels on order and the timely completion of ship conversion programmes; (xvi) our ability to keep pace with technological changes and the impact of potential information technology, cyber security or data security breaches; (xvii) global availability at scale and commercially viability of suitable alternative vessel fuels; and (xviii) the effectiveness of our disclosure controls and procedures and internal control over financial reporting. Many of these factors are beyond our ability to control or predict. Given these uncertainties, you should not place undue reliance on the forward-looking statements. Each forward-looking statement speaks only as of the date of this document. We undertake no obligation to update publicly or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

This information is considered to be inside information pursuant to the EU Market Abuse Regulation and is subject to the disclosure requirements pursuant to Section 5-12 the Norwegian Securities Trading Act.

This stock exchange release was published by Katherine Tonks, Investor Relations, Subsea7, on 14 June 2024 at 13:50 CET.

Attachment



EN
14/06/2024

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Subsea 7 S.A.

 PRESS RELEASE

Subsea 7 S.A. Conference Call Notification - Q2 2024 Results

Subsea 7 S.A. Conference Call Notification - Q2 2024 Results  Luxembourg – 20 June 2024 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) will publish its second quarter results for the period ended 30 June 2024 on Thursday 25 July 2024 at 08:00 CET. A conference call and simultaneous webcast for the investment community will be held on Thursday 25 July 2024 at 13:00 CET. From 08:00 CET the results announcement and the presentation to be reviewed during the conference call and webcast will be available on the Subsea7 website: Conference call registration:Call:  Webcast: ******...

Baptiste Lebacq
  • Baptiste Lebacq

Subsea 7 : Partnerships: a means to reduce risk in a dynamic sector

>Outperform rating, target price of NOK 220 - Following the CMD, we reiterate our Outperform rating with a target price of NOK 220. As a reminder, our method of valuation is unchanged and remains based on an 12-mth fwd EV/EBITDA multiple of 5x. The stock is one of the key players to play the acceleration phase in investment in the subsea segment for the O&G industry which still has bright days and even years ahead of it. In light of the CMD, we have made a s...

Baptiste Lebacq
  • Baptiste Lebacq

Subsea 7 : Partenariats : un moyen de réduire les risques dans un sect...

>Opinion Surperformance, OC 220 NOK - Post CMD, nous réitérons notre recommandation Surperformance avec un OC de 220 NOK. Pour rappel notre méthode de valorisation est inchangée est reste basée sur un multiple de VE/EBITDA N12M de 5x. Le titre fait partie des acteurs clefs afin de jouer la phase d’accélération des investissements dans le segment du Subsea pour l’industrie du O&G qui a encore de beaux jours et mêmes années devant lui. Post CMD, nous avons rev...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch