Q2 2025 Energy production +13%

and turnover up +11%

Q2 2025 turnover at 147.7 million euros

  • Energy Sales: Growth in production +13% (to 1.3 terawatt-hours) despite a higher curtailment in Brazil. Turnover decrease of -13% (-7% at constant exchange rates), mainly penalised by a price effect arising from the end of short-term contracts at high prices (effects of early production1), and by an unfavourable EUR/BRL exchange rate relative to 2024, resulting in turnover of 81.7 million euros
  • Services to third parties: Strong growth driven by construction of power plants, particularly in Ireland, Spain and the United Kingdom, combined with growth in Operation and Maintenance, increasing Services turnover to 65.9 million euros. Turnover have been restated for the Equipment Procurement segment, which was discontinued in the first half of 20252

Operational indicators of production and capacity as of June 30, 2025

  • Energy production up in the first half of 2025: +14% to 2.4 terawatt-hours, despite Brazilian curtailment3 of 268 gigawatt-hours, for a total of 14% of Brazilian production (10% of total production)
  • Capacity in operation and under construction: +7% at 3.3 gigawatts including 2.5 gigawatts in operation and 0.8 gigawatt under construction
  • Capacity operated for behalf of third-party clients: +20% to 7.7 gigawatts

2025 operational objectives

  • Capacity in operation and under construction of around 3.6 gigawatts (+10% compared with 2024) including around 3 gigawatts in operation (+20%) with most of commissioning at the end of 2025
  • Production of around 5.2 terawatt-hours (+10% compared with 2024)

SPRING Transformation Plan: update on the diagnostic 

  • The diagnostic phase is now finalised as of June 2025 – remains the definition of the current action, which will be presented jointly with the presentation of the 2025 half-year results

Voltalia (Euronext Paris, code ISIN: FR0011995588), an international player in renewable energy, publishes today its 2025 second quarter turnover.

« Voltalia continues to grow in the first half of the year with an increase in turnover, driven by our Services activities, which mitigated the temporary downturn in Energy Sales. This momentum, combined with a 14% increase in production and a portfolio of operating power plants totalling 3.3 gigawatts, reflects our solid underlying operating indicators. In line with our business activities, we are finalising our SPRING strategic plan, whose actions will be presented in September for immediate implementation, with the aim of strengthening our competitiveness and agility in the face of the sector’s swift evolution. In this rapidly changing renewable energies market, Voltalia is fully mobilized to transform these challenges into levers for sustainable and profitable growth.", declares Robert Klein, CEO of Voltalia.

Second-quarter (Q2) and first-half 2025 turnover

In million eurosQ2 2025Q2 2024Var. at current exchange ratesVar. at constant exchange ratesH1 2025H1 2024Var. at current exchange ratesVar. at constant exchange rates
Energy Sales81.793.9-13%-7%152.1166.6-9%-2%
Services65.938.9+69%+70%104.870.1+50%+50%
Turnover147.7132.9+11%+16%257.0236.7+9%+13%

REVIEW OF ACTIVITIES

First-half 2025 turnover reaches 257 million euros, up +9% at current exchange rates (+13% at constant exchange rates). Whilst Energy Sales were down -9% at current exchange rates, growth was driven by Services to third parties, which were up by 50% at current exchange rates (+50% at constant exchange rates). Energy Sales and Services account for 59% and 41% respectively of first-half 2025 turnover. By geographic region, 64 % of half-year turnover was generated in Europe, 30% in Latin America and 6% in Africa.

Second-quarter 2025 turnover reaches 147.7 million euros, up +11% (+16% at constant exchange rates), driven by the +69% increase in Services for third party customers (+70% at constant exchange rates), which mitigated the temporary -13% decline in Energy Sales. Energy Sales and Services account for 55% and 45% respectively of second-quarter 2025 turnover.

ENERGY SALES

 



 Operational Indicators
Q2 2025Q2 2024Var.H1 2025H1 2024Var.
 
Production (in GWh)1,2571,111+13%2,3732,084+14%
Production curtailment (in GWh)181  268  
Capacity in operation (in MW)   2,5242 452+3%
Capacity in operation and under construction (in MW)   3,2793 057+7%
Wind load factor in Brazil33%27%+6pts33%27%+6pts
Wind load factor in Brazil without curtailment40%33%+7pts39%31%+8pts
Solar load factor in Brazil24%22%+2pts24%23%+1pt
Solar load factor in Brazil without curtailment29%27%+2pts29%27%+2pts
Wind load factor in France19%20%-1pt24%24%stable
Solar load factor in France12%17%-5pts11%14%-3pts
Solar load factor in Egypt and Jordan32%31%+1pt27%26%+1pt
Solar load factor in Albania31%30%+1pt22%22%stable
Solar load factor in the UK26%22%+4pts19%15%+4pts
Solar load factor in Portugal 26%25%+1pt19%20%-1pt

First-half 2025 turnover from Energy Sales reaches 152.1 million euros, down -9% (-2% at constant exchange rates). The average EUR/BRL rate was 6.30 in the first half of 2025, compared with 5.49 in the first half of 2024.

Second-quarter 2025 production reaches 1,257 GWh, up +13% compared with second-quarter 2024 from 1,111 GWh. The rise in production is due to higher resource levels in Brazil and increased operating capacity, notably from Helexia in Europe and Brazil. Operating capacity is 61% in Latin America, 36% in Europe and 3 % in the rest of the world.

Quarterly analysis production by country

  • In Brazil, production increases by +17% due to a better level of resources than in 2024, despite an increase in curtailment in the second quarter of 2025 (181 GWh).
  • In France, production falls by -20% due to the combined effect of disposals in 20244 and a less favourable solar resource than in the second quarter of 2024.
  • In the rest of the world, production is up +3% due to the combined effect of better resource levels in the United Kingdom and Albania, and new capacity commissioned in Italy.
  • Helexia's production continues its rapid growth (+31%), in Europe and Brazil.

Second-quarter 2025 turnover from Energy Sales reaches 81.7 million euros, down -13% (-7% at constant exchange rates). The capacity increase coupled with better resource levels in Brazil did not offset the cumulative unfavourable effects of (i) the price impact in France and Albania, in which Voltalia benefited in 2024 from the favourable effects of high prices on early production5, (ii) the EUR/BRL exchange rate and (iii) curtailment in Brazil.

SERVICES6 

In million eurosQ2 2025Q2 2024Var. at current exchange ratesVar. at constant exchange ratesH1 2025H1 2024Var. at current exchange ratesVar. at constant exchange rates
Turnover from Development and Construction 57.832.3+79%+79%89.557.9+55%+55%
Turnover from Operation and Maintenance8.16.6+23%+26%15.312.2+26%+29%
Total Turnover from Services65.938.9+69%+70%104.870.1+50%+50%

First-half 2025 turnover from third-party Services reaches 104.8 million euros, up +50% (+50% at constant exchange rates). The Development and Construction segment grew by +55% to 89.5 million euros, and the Operation and Maintenance segment by +26% to 15.3 million euros. To be noted that in the first half of 2025, Voltalia initiated the winding down of its Equipment Procurement business segment. First-half 2025 turnover and second quarter 2025 turnover (as well as comparative periods) have been restated for the discontinued Equipment Procurement business segment7.

Second quarter 2025 turnover from third-party Services reaches 65.9 million euros, up +69% (+70% at constant exchange rates).

Third-party Development and Construction turnover reaches 57.8 million euros, up +79% (at current and constant exchange rates), boosted by the growth in third-party construction activity, which recorded a +65% turnover increase (at current and constant exchange rates). Projects currently under construction in Ireland, Spain and the United Kingdom collectively represent more than 800 MW.

Operation-Maintenance turnover for third-party customers reaches 8.1 million euros, an uplift of +23% (+26% at constant exchange rates) compared with the second quarter of 2024. Capacity operated on behalf of third parties reached 7.7 GW (up +20%), thanks to new contracts particularly in Portugal and Brazil.

RECENT ANNOUNCEMENTS

Update on the Brazilian power grid

Curtailment in Brazil during the first half of the year amounted to 268 GWh (i.e. 14% of Brazilian production and 10% of total production over the period). It was higher than the half-year estimates. During the presentation of its 2024 annual results, Voltalia stated that its 2025 operating targets included an assumption of 10% curtailment in 2025 in Brazil8  (compared with 21% in 2024).

A Working Group (WG) set up by the Comité de Surveillance du Secteur Électrique (CMSE) to limit curtailment’s impact, is pursuing its actions. As a result, the ONS (Opérateur National du Système Électrique) has enabled the transmission of a greater volume of energy. The aim is to exploit wind generation to a greater extent, thereby reducing curtailments and the use of thermal power plants.

Voltalia remains confident of a favourable outcome, in the medium term, to the legal and contentious actions undertaken for compensation, however, given this evolving context, no compensation has been included for 2025.

Update on the Cacao power plant

On April 29, 2025, a sawmill adjacent to the Cacao biomass plant (Cacao Biomasse Énergie) in French Guiana caught fire. Although the smoke detection and fire protection systems were functioning correctly, the fire severely damaged the sawing line (not owned by Voltalia S.A) and the two biomass feed conveyors.

Following the incident, technical and industrial assessments have been carried out to precisely evaluate the options to limit the impact on plant operations. Based on these analyses, the plant is expected to be out of operation for an estimated six to twelve months, which could represent a potential loss of around 6 million euros in turnover by 2025, excluding recourse to third parties, including insurance companies, which are currently being analysed.

SPRING TRANSFORMATION PLAN: UPDATE ON THE STRATEGIC BUSINESS REVIEW

The diagnostic phase of the SPRING transformation plan, initiated at the beginning of 2025 by the new general management, was finalised in June, as previously announced9. An action plan is currently being drawn up, aimed at creating sustainable conditions for profitable growth in line with the company's mission.

The conclusions of this initial phase will be presented at the time of the half-yearly results, along with the roadmap for implementing the diagnostic recommendations. Expected to have an initial impact as early as 2025, this roadmap will serve as a guide to ensure effective, structured implementation of the recommended actions.

SPRING is thus a strategic lever for strengthening Voltalia's sustainable and profitable growth trajectory, based on a clearer organisation focused on value creation.

2025 OPERATIONAL TARGETS

Voltalia confirms its operating targets for 2025:

  • Approximately 3.6 gigawatts of capacity in operation and under construction (+10% compared with 2024), of which approximately 3 gigawatts in operation (+20%), with the majority commissioned by the end of 2025
  • Production of around 5.2 TWh (+10% compared with 2024), including a 10% curtailment assumption in Brazil (compared with 21% in 2024)

UPCOMING EVENTS

  • Half-Year Results 2025 and SPRING transformation plan presentation, on September 4, 2025 (before trading) followed by a 10am (CET) in-person event with live webcast

PROSPECTIVE STATEMENTS

This press release contains forward-looking statements. These statements are not historical facts. These statements include projections and estimate and their underlying assumptions, statements regarding plans, objectives, intentions and expectations with respect to future financial results, events, operations, services, product development and potential, and statements regarding future performance. These forward-looking statements may often be identified by the words "expect", "anticipate", "believe", "intend", "estimate" or "plan", as well as by other similar words. Although Voltalia's management believes that these forward-looking statements are reasonable, investors are cautioned that forward-looking statements are subject to numerous risks and uncertainties, many of which are difficult to predict and generally beyond Voltalia's control, that could cause actual results and events to differ materially from those expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties include, among others, the uncertainties inherent in the evolution of the selling price of electricity produced by Voltalia, the evolution of the regulatory environment in which Voltalia operates as well as the competitiveness of renewable energies and other factors that may affect the production capacity or profitability of Voltalia's production sites as well as those developed or identified in Voltalia's public filings with the Autorité des marchés financiers including those listed in section 2.2 "Risk Factors" of Voltalia's 2024 Universal Registration Document filed with the Autorité des marchés financiers on April 2, 2025. Voltalia undertakes no obligation to update any forward-looking information or statements, except as required by law.

Capacity in operation as of June 30, 2025

In MWWindSolarBiomassHydroHybridJune 30, 2025 June 30, 2024
Albania 140   140140
Belgium 23   2321
Brazil773750  121,5351,494
Egypt 32   3232
France81260 5 346341
French Guiana 1475234849
Greece 20   2017
Hungary 24   2422
Italy 24   2417
Jordan 57   5757
Netherlands 60   6060
Portugal 82   8277
Romania 13   138
Spain 30   3027
United Kingdom 57  328989
Total8541,58779672,5242,452

Capacity under construction as of June 30, 2025

Name of the projectCapacity (MW)TechnologyCountry
Bolobedu148SolarSouth Africa
Cafesoca8HydroBrazil
Clifton45SolarUnited Kingdom
East gate34SolarUnited Kingdom
Helexia9SolarBelgium
Helexia113SolarBrazil
Helexia7SolarSpain
Helexia22SolarFrance
Helexia1SolarHungary
Helexia5SolarPoland
Helexia1SolarPortugal
Higher Stockbridge45SolarUnited Kingdom
Le Deffend6SolarFrance
Los Venados20SolarColombia
Sarimay Solar126SolarUzbekistan
Seranon8SolarFrance
Sinnamary (battery)1StorageFrench Guyana
Sinnamary (SBE)10BiomassFrench Guyana
Spitalla Solar100SolarAlbania
Terres Salées11SolarFrance
Voltalia Mobility - Yusco36SolarFrance
Total755  

Production as of June 30, 2025

In GWhWindSolarBiomassHydroHybridJune 30, 2025 June 30, 2024
Albania 132   132136
Brazil1,108487  241,6191,398
Egypt 39   3938
France7441 2 118140
French Guiana 610  1625
Greece 13   1315
Helexia Brazil 119   11944
Helexia Europe 169   169147
Italy 3   30
Jordan 65   6565
Portugal 43   4345
United Kingdom  37   3730
Total1,1821,154102242,3732,084

Quarterly production (Q2) 2025

In GWhWindSolarBiomassHydroHybridQ2 2025Q2 2024
Albania 93   9390
Brazil557235  13804690
Egypt 22   2222
France2925 2 5769
French Guiana 31  59
Greece 8   812
Helexia Brazil 57   5724
Helexia Europe 114   114107
Italy 2   20
Jordan 40   4039
Portugal 29   2928
United Kingdom  26   2622
Total58665412131,2571,111



About Voltalia ()
Voltalia is an international player in renewable energies. The Group produces and sells electricity from its wind, solar, hydro, biomass and storage facilities. It has 3.3 GW of capacity in operation and under construction, and a portfolio of projects under development with a total capacity of 17.4 GW.



Voltalia is also a service provider, supporting its renewable energy customers at every stage of their projects, from design to operation and maintenance.

A pioneer in the business market, Voltalia offers a comprehensive range of services to businesses, from the supply of green electricity to energy efficiency services and the local production of its own electricity.



 



With more than 2,000 employees in 20 countries on 3 continents, Voltalia has the capacity to act globally on behalf of its customers.



 



Voltalia is listed on the Euronext regulated market in Paris (FR0011995588 - VLTSA) and is included in the Enternext Tech 40 and CAC Mid&Small indices. The company is also included, amongst others, in the MSCI ESG ratings and the Sustainalytics ratings.
Voltalia

Email:

T. +33 (0)1 81 70 37 00
Press Relations Seitosei.Actifin - Jennifer Jullia



T. +33 (0)1 56 88 11 19








1 Early generation: power sales in a short-term contract that precedes the entry into force of the long-term contract. In the case of Karavasta (Albania), the short-term contract was negotiated at a higher price than the long-term contract, such as Sud Vannier (France).

2 During the first half of 2025, Voltalia initiated the discontinuation of its Equipment Procurement business. At the end of June 2025, the criteria for qualification as a “discontinued operation” within the scope of IFRS 5 were fulfilled. Consequently, turnover for 2025 and 2024 have been restated for the Equipment Procurement business.

3 For a transmission system operator, curtailment implies limiting the transmission, for a given period, of all or part of a power plant's electrical production potential, to maintain the network's stability.

4 December 9, 2024 press release.

5 Early generation sales benefiting from electricity sales under a short-term contract that precedes the entry into force of the long-term contract. In the case of Karavasta, turnover in 2024 benefited from a short-term contract with a premium price over the first-half 2025 contract, which in turn benefits from a premium price over the terms of the long-term contract due to enter into force in the second half of 2025.

6 Services: Third-party services.

7 In accordance with IFRS 5.

8 March 13th, 2025 press release

9 March 13th, 2025 press release





Attachment



EN
23/07/2025

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Voltalia

 PRESS RELEASE

Voltalia wins two new construction contracts in Ireland

Voltalia wins two new construction contracts in Ireland Voltalia wins two new construction contracts in Ireland Voltalia (Euronext Paris, ISIN code: FR0011995588), an international player in renewable energies, has been chosen by ESB, a semi-state-owned utility company, to provide engineering, procurement and construction (EPC) services for two new solar power plants  ESB has reaffirmed its trust in Voltalia by awarding two new turnkey Engineering, Procurement and Construction (EPC) contracts for solar power plants, totaling 92.9 megawatts. The contracts cover the construction of the 43.7...

 PRESS RELEASE

Voltalia remporte deux nouveaux contrats de construction en Irlande

Voltalia remporte deux nouveaux contrats de construction en Irlande Voltalia remporte deux nouveaux contrats de construction en Irlande Voltalia (Euronext Paris, ISIN code : FR0011995588), acteur international des énergies renouvelables, a été choisi par ESB, entreprise semi-étatique de services publics, pour assurer l’ingénierie, l’approvisionnement et la construction (EPC) de deux nouvelles centrales solaires ESB a réaffirmé sa confiance en Voltalia en lui attribuant deux nouveaux contrats clés en main d'ingénierie, d'approvisionnement et de construction (EPC) de centrales solaires, re...

Louis Boujard ... (+3)
  • Louis Boujard
  • CFA
  • Philippe Ourpatian
Louis Boujard ... (+3)
  • Louis Boujard
  • CFA
  • Philippe Ourpatian

ResearchPool Subscriptions

Get the most out of your insights

Get in touch