ERA Eramet SA

Eramet delivers first lithium carbonate from Centenario DLE plant in Argentina

Eramet delivers first lithium carbonate from Centenario DLE plant in Argentina

Paris, December 24th, 2024 - 2:30pm

PRESS RELEASE

Eramet delivers first lithium carbonate from Centenario DLE plant in Argentina

Eramet announces that it has delivered first lithium carbonate production at its newly commissioned Centenario plant, located in Salta Province, in Argentina.

The Centenario plant is the first facility to implement at an industrial scale Eramet’s advanced Direct Lithium Extraction (“DLE”) technology. This industry leading technology delivers sustainable and highly efficient lithium carbonate suitable for electric vehicle battery applications. Centenario first plant is designed to extract and produce 24,000 t/year of battery-grade lithium carbonate, and at full capacity should be positioned in the 1st quartile of the lithium industry cost-curve. First lithium carbonate production has been achieved less than three years after Eramet started the construction of the plant.

Total drainable mineral resources of the Centenario-Ratones salar amount to more than 15 Mt of Lithium Carbonate Equivalent (“LCE”)1, with an average concentration of 407 mg/L of lithium contained in the brine. This worldclass resource is large enough to support long-term growth optionality for production capacity to above 75kt-LCE/year.

On October 24th, the Group had announced it had regained full ownership of its flagship lithium business in Argentina, buying-out the 49.9% share of its partner in their joint-venture Eramine which fully owns the Centenario plant.

Christel Bories, Chair and CEO of Eramet group:

  • The start of our lithium production at Centenario in Argentina represents a key milestone for the diversification of the Group into metals for the energy transition, which will place Eramet as the first European company to produce lithium carbonate at an industrial scale. I would like to thank and congratulate our teams for their strong commitment and their determination in delivering this DLE project within an impressive timeframe compared to similar projects in the region, despite the technical, logistical and meteorological challenges associated with its location at 4,000 meters of altitude in the remote Andean Highlands. In 2025, we will ramp up production at the plant, aiming at becoming a key global player in the sustainable production of lithium. 

Calendar

19.02.2025: Publication of 2024 Group annual results

24.04.2025: Publication of 2025 Group first-quarter turnover

ABOUT ERAMET

Eramet transforms the Earth’s mineral resources to provide sustainable and responsible solutions to the growth of the industry and to the challenges of the energy transition.

Its employees are committed to this through their civic and contributory approach in all the countries where the mining and metallurgical group is present.

Manganese, nickel, mineral sands, and lithium: Eramet recovers and develops metals that are essential to the construction of a more sustainable world.

As a privileged partner of its industrial clients, the Group contributes to making robust and resistant infrastructures and constructions, more efficient means of mobility, safer health tools and more efficient telecommunications devices.

Fully committed to the era of metals, Eramet’s ambition is to become a reference for the responsible transformation of the Earth’s mineral resources for living well together.

www..com

INVESTOR CONTACT



Director of Investor Relations



Sandrine Nourry-Dabi



T. 02









PRESS CONTACT



Media Relations Manager



Fanny Mounier



T. 83






1 15,120 Mt-LCE, Measured + Indicated + Inferred, as of January 1st, 2024.

Attachment



EN
24/12/2024

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Eramet SA

 PRESS RELEASE

Fire at Eramet Grande Côte’s mineral sands extraction unit: production...

Fire at Eramet Grande Côte’s mineral sands extraction unit: production suspended and force majeure declared Paris, February 26th, 2026, at 08h30 a.m PRESS RELEASE Fire at Eramet Grande Côte’s mineral sands extraction unit: production suspended and force majeure declared A localised fire broke out on 22 February in the afternoon at the WCP (Wet Concentration Plant) of the Eramet Grande Côte (EGC) site in Senegal. The incident was brought under control and fully extinguished at around 8:00 p.m. the same day. No casualties or injuries were reported.The fire resulted in the shutdown of the W...

 PRESS RELEASE

Incendie sur l’unité d’extraction de sables minéralisés d’Eramet Grand...

Incendie sur l’unité d’extraction de sables minéralisés d’Eramet Grande Côte : suspension de production et déclaration de force majeure Paris, le 26 février 2026 à 08h30 COMMUNIQUE DE PRESSE Incendie sur l’unité d’extraction de sables minéralisés d’Eramet Grande Côte : suspension de production et déclaration de force majeure Un incendie localisé s’est déclaré le 22 février dans l’après-midi sur la WCP (Wet Concentration Plant) du site d’Eramet Grande Côte (EGC), au Sénégal. L’incident a été maîtrisé puis totalement éteint aux alentours de 20 heures le jour même, sans faire de victime n...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch