ALPHAMIN PROVIDES QUARTERLY PRODUCTION UPDATE

ALPHAMIN PROVIDES QUARTERLY PRODUCTION UPDATE

GRAND BAIE, MAURITIUS, April 03, 2020 (GLOBE NEWSWIRE) -- Alphamin Resources Corp. (AFM:TSXV, APH:JSE AltX, “Alphamin” or the “Company”) is pleased to provide the following production update for the most recent quarter ended March 2020:

  • Contained tin production of 2,119 tons – at mid point of previous guidance range
  • Processing recoveries of 71% - in line with target
  • Plant throughput up 19%
  • Q2 2020 production guidance of 2,400 - 2,600 tons contained tin
  • Excellent safety performance with zero lost time injuries during the quarter

Production Summary for the Quarter ended March 2020

DescriptionUnitsActual
  Quarter

ended

March 2020 
Quarter

ended

December 2019
 Variance
Tons processed Tons 85 060 71 559 19%
Tin grade % Sn 3,5 4,9-29%
Overall Plant recovery % 71 64 11%
Payable Tin produced Tons 2 119 2 235 -5%
Payable Tin sold Tons 32861 109196%

The Bisie tin mine has continued with its excellent safety record with zero lost-time injuries recorded during the past quarter.

Contained tin production of 2,119 tons was at the mid point of our previous market guidance. The commissioning of two new remote controlled LHDs (load, haul, dump machines) during February 2020 improved underground loading capacity and this together with the impact of the recently announced new mining method resulted in a 19% increase in run-of-mine material processed. Tin grades are variable depending on where mining is taking place and tapered off to 3.5% Sn during Q1 2020, in line with expectations. Underground grades are expected to average 4.0% Sn during the next quarter. The overall plant recovery of 71% was in line with target and 11% above the previous quarter.



Payable tin sales exceeded production as we reduced the on-mine concentrate stockpile during the months of February and March 2020 following the repair of the collapsed bridge on the main access highway which was opened to traffic on 25 January 2020.



Production Guidance for the next Quarter:



We expect contained tin production of between 2,400 and 2,600[1] tons for the quarter ending June 2020 based upon run-of-mine tin grades planned at 4.0% Sn and overall plant recoveries at 72%.



Covid-19 Pandemic and Impact on Operations:

The health of our employees is of paramount importance and in this regard the Company has a range of Covid-19 awareness, prevention and other risk mitigation controls in place.



The Covid-19 crisis has seen global disruptions to supply chains. To date, the Company has been able to continue with normal production and concentrate sales activities. The main border crossings relevant to our in and outbound activities are still open to freight movement and our concentrate off-take customer is currently able to send product to at least one tin smelter. The situation remains dynamic and any issue impacting critical flow in our supply chain or that would restrict operations or the availablity of the Company’s workforce may negatively affect production and sales activities. During this challenging time it is important that the Company continues producing and selling tin concentrates for the benefit of all our stakeholders, particularly the economy and people of the North-Kivu province, DRC.



Covid-19 is having a negative impact on global commodity prices. The LME tin price is currently ranging between US$13,500/t and US$14,500/t compared to the Company’s recently released NI 43-101 Technical Report which assumed a price of US$17,000/t. From a liquidity perspective and basis current production rates, this current tin price range supports ongoing production and sales costs together with debt interest payments but higher tin prices will be required to meet additional monthly debt capital repayments scheduled to commence 31 July 2020. The Company continues to focus on achieving its full production targets at the lowest possible unit cost.



Alphamin’s audited consolidated financial statements and accompanying Management’s Discussion and Analysis for the year and three months ended December 31, 2019 are expected to be released by mid April 2020. The unaudited financial statements and accompanying Management’s Discussion and Analysis for the three months ended March 31, 2020 are expected to be released by the end of April 2020.

Qualified Person



Mr. Vaughn Duke Pr.Eng. PMP, MBA, B.Sc. Mining Engineering (Hons.), is a qualified person (QP) as defined in National Instrument 43-101 and has reviewed and approved the scientific and technical information contained in this news release. He is a Principal Consultant, Partner and Director of Sound Mining Solutions, an independent technical consultant to the Company.

__________________________________________________________________________________________

[1] Production guidance is based on certain estimates and assumptions, including but not limited to: quantity of material processed, tin grades of processed material and processing recoveries and assumes mining operations will continue to be conducted in the same manner as the previous quarter and will not be further impacted by the Covid-19 pandemic.

FOR MORE INFORMATION, PLEASE CONTACT:

Maritz Smith                                     

CEO                           

Alphamin Resources Corp.                           

Tel: +230 269 4166

E-mail:

Information in this news release that is not a statement of historical fact constitutes forward-looking information. Forward-looking statements contained herein include, without limitation, statements relating to production volumes and anticipated tin grades and processing recoveries. Forward-looking statements are based on assumptions management believes to be reasonable at the time such statements are made. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Although Alphamin has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Factors that may cause actual results to differ materially from expected results described in forward-looking statements include, but are not limited to: uncertainties associated with Alphamin’s resource and reserve estimates, uncertainties regarding estimates of the expected mined tin grades, processing plant performance and recoveries, uncertainties regarding global supply and demand for tin and market and sales prices,  uncertainties with respect to social, community and environmental impacts, adverse political events, impacts of the global Covid-19 pandemic on mining operations and commodity prices as well as those risk factors set out in the Company’s Management Discussion and Analysis and other disclosure documents available under the Company’s profile at . Forward-looking statements contained herein are made as of the date of this news release and Alphamin disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws.

CAUTION REGARDING FORWARD LOOKING STATEMENTS

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

 

EN
03/04/2020

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Alphamin Resources Corp.

 PRESS RELEASE

ALPHAMIN ANNOUNCES CAD$0.07 PER SHARE INTERIM FY2025 DIVIDEND/ APPOINT...

ALPHAMIN ANNOUNCES CAD$0.07 PER SHARE INTERIM FY2025 DIVIDEND/ APPOINTMENT OF TWO NEW DIRECTORS/ FILES Q2 2025 FINANCIAL STATEMENTS AND MD&A GRAND BAIE, MAURITIUS, Aug. 07, 2025 (GLOBE NEWSWIRE) -- Alphamin Resources Corp. (AFM:TSXV, APH:JSE AltX)( “Alphamin” or the “Company”) announced today the appointment of two new directors, the declaration of an interim FY2025 dividend and the filing of its unaudited condensed consolidated financial statements and accompanying Management’s Discussion and Analysis (“MD&A”) for the quarter and six months ended 30 June 2025 on SEDAR+ at . Appointme...

 PRESS RELEASE

ALPHAMIN PROVIDES Q2 2025 OPERATIONAL UPDATE/ FILES AMENDED CONSTITUTI...

ALPHAMIN PROVIDES Q2 2025 OPERATIONAL UPDATE/ FILES AMENDED CONSTITUTION GRAND BAIE, MAURITIUS, July 03, 2025 (GLOBE NEWSWIRE) -- Alphamin Resources Corp. (AFM:TSXV, APH:JSE AltX)( “Alphamin” or the “Company”) is pleased to provide an operational update as follows: Q2 2025 contained tin production of 4,106 tonnes following a phased operational restart on 15 April 2025 (Q1 2025: 4,270 tonnes)Contained tin sales of 4,587 tonnes for the quarter, up 19% from the prior periodQ2 2025 EBITDA2,3 guidance of US$75m (Q1 2025 actual: US$62m)Strong cash flow generation with Net Cash increasing by US...

 PRESS RELEASE

ALPHAMIN ANNOUNCES APPOINTMENT OF DIRECTOR

ALPHAMIN ANNOUNCES APPOINTMENT OF DIRECTOR GRAND BAIE, MAURITIUS, June 25, 2025 (GLOBE NEWSWIRE) -- Alphamin Resources Corp. (AFM:TSXV, APH:JSE AltX) (the “Company” or “Alphamin”) announced today that, subject to regulatory approval, Mr. John Robertson, a Mauritian resident, has been appointed as a director of the Company. Mr. Robertson is a mining professional with 30 years of experience in countries across Franco and Anglophone Africa. He has significant surface and underground mine management experience in both base and precious metals and a strong background in compliant Resource and ...

 PRESS RELEASE

ALPHAMIN ANNOUNCES RESIGNATION OF DIRECTOR

ALPHAMIN ANNOUNCES RESIGNATION OF DIRECTOR GRAND BAIE, MAURITIUS, June 23, 2025 (GLOBE NEWSWIRE) -- Alphamin Resources Corp. (AFM:TSXV, APH:JSE AltX) (the “Company” or “Alphamin”) announced today that Mr. Rudolf Pretorius has resigned as a director of the Company. Mr. Pretorius served as an appointee of Tremont Master Holdings since February 2014 and the board of directors wishes to thank him for his contributions to Alphamin during his tenure. FOR MORE INFORMATION, PLEASE CONTACT: Charles NeedhamChairmanAlphamin Resources Corp.Tel: +230 269 4166E-mail: Neither the TSX ...

Alphamin Resources Corp: 1 director

A director at Alphamin Resources Corp sold 718,990,967 shares at 0.700CAD and the significance rating of the trade was 99/100. Is that information sufficient for you to make an investment decision? This report gives details of those trades and adds context and analysis to them such that you can judge whether these trading decisions are ones worth following. Included in the report is a detailed share price chart which plots discretionary trades by all the company's directors over the last two y...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch