AYA Aya Gold and Silver

Aya Gold & Silver Reports High-Grade Boumadine Exploration Results, Expands Imariren to 1km and Identifies New High-Grade Asirem Zone to the West

Aya Gold & Silver Reports High-Grade Boumadine Exploration Results, Expands Imariren to 1km and Identifies New High-Grade Asirem Zone to the West

MONTREAL, July 07, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce new high-grade drill exploration results from its 2025 program at Boumadine in the Kingdom of Morocco. Today's results also extend the Imariren mineralized trend to 1 kilometer (“km”) and confirm high-grade continuity along the Boumadine Main Trend. In addition, Aya is pleased to announce that it has identified a new mineralized high-grade at-surface zone to the west.

Highlights1

  • New prospective high-grade Asirem zone identified to the west of Boumadine Main Trend, with grab samples including 3.34 grams per tonne ("g/t") gold (“Au”) and 4.0% copper (“Cu”).
  • High-grade intercepts on the Boumadine Main Trend (5.4km):
    • BOU-MP25-038 intercepted 258 g/t silver equivalent (“AgEq”) over 3.3 meter (“m”) (2.85 g/t Au, 27 g/t silver (“Ag”), 0.1% zinc (“Zn”), 1.0% lead (“Pb”) and 0.05% Cu, including 563 g/t AgEq over 1.3m (6.13 g/t Au, 65 g/t Ag, 0.3% Zn, 0.2% Pb and 0.1% Cu)
    • BOU-MP25-028 intercepted 286 g/t AgEq over 4.3m (3.27 g/t Au, 19 g/t Ag, 0.3% Zn, 0.1% Pb and 0.1% Cu), including 460 g/t AgEq over 2.1m (5.46 g/t Au, 26 g/t Ag, 0.05% Zn, 0.1% Pb and 0.1% Cu)
  • High-grade intercepts on the Tizi Zone (2km):
    • BOU-DD25-547 intercepted 248 g/t AgEq over 9.0m (0.42 g/t Au, 80 g/t Ag, 3.6% Zn, 1.8% Pb and 0.04% Cu)
    • BOU-DD24-540 intercepted 480 g/t AgEq over 2.0m (3.27 g/t Au, 53 g/t Ag, 1.1% Zn, 5.2% Pb and 0.2% Cu)
  • Extension of Imariren strike length to 1km:
    • BOU-DD25-503 intercepted 876 g/t AgEq over 1.0m (9.92 g/t Au, 49 g/t Ag, 1.6% Zn, 0.2% Pb and 0.1% Cu)
    • BOU-DD25-529 intercepted 365 g/t AgEq over 2.0m (3.66 g/t Au, 52 g/t Ag, 0.5% Zn, 0.5% Pb and 0.1% Cu)
  • Completed 79,732m of drilling at Boumadine year-to-date in 2025.

1. All intersections are in core lengths. Ag equivalent is based on a silver price of US$24/oz with a process recovery of 89%, a gold price of US$2,200/oz with a process recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead price of US$1.00/lb with a process recovery of 85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 77.9 g/t Ag; 1% Cu: 85.4 g/t Ag; 1% Pb: 24.2 g/t Ag; and 1% Zn: 24.6 g/t Ag.

“We are excited to have identified the new Asirem gold-copper zone at surface to the west of the Boumadine Main Trend — a new prospective target that highlights Boumadine’s potential to become a large-scale, high-grade project,” said Benoit La Salle, President & CEO. “We are well positioned to quickly drill test this new regional target, and the structure can now be traced to the west over 9km. In addition, high-grade holes BOU-MP25-038 and BOU-MP25-028 confirm strong continuity of the Boumadine Main Trend at depth, while hole BOU-DD25-529 extends the footprint south at Imariren. With over 8.4km of mineralized strike length, we continue to demonstrate Boumadine’s significant resource growth potential.”

Table 1 – Significant Intercepts from Boumadine Drill Exploration Program (Core Lengths)

DDH No.

From To Au Ag Length* Cu Pb Zn Mo Ag Eq** 
 (m) (m) (g/t) (g/t) (m) (%) (%) (%) (g/t) (g/t) 
BOU-DD25-503224.2 225.2 9.92 49 1.0 0.1 0.2 1.6 6 876 
BOU-DD25-529134.4 136.4 3.66 52 2.0 0.0 0.5 0.5 5 365 
BOU-DD25-533204.3 207.7 1.18 61 3.4 0.2 0.1 3.7 13 266 
Including206.1 207.7 2.19 87 1.6 0.3 0.2 5.9 13 436 
BOU-DD25-537119.9 124.3 1.46 30 4.4 0.0 0.2 0.8 119 174 
BOU-DD25-54069.0 71.0 3.27 53 2.0 0.2 5.2 1.1 3 480 
BOU-DD25-547117.0 126.0 0.42 80 9.0 0.0 1.8 3.6 5 248 
BOU-MP25-026238.5 243.2 0.58 36 4.7 0.1 1.3 7.2 12 296 
BOU-MP25-028392.1 396.4 3.27 19 4.3 0.1 0.1 0.3 8 286 
Including392.1 394.2 5.46 26 2.1 0.1 0.1 0.0 10 460 
BOU-MP25-031279.1 282.0 2.47 21 2.9 0.1 0.2 0.7 7 242 
BOU-MP25-038437.7 441.0 2.85 27 3.3 0.0 0.1 0.1 2 258 
Including437.7 439.0 6.13 65 1.3 0.1 0.2 0.3 2 563 
BOU-MP25-039521.0 525.0 2.86 13 4.0 0.0 0.1 0.2 1 246 
Including521.0 523.0 3.91 19 2.0 0.1 0.1 0.4 1 339 
BOU-MP25-042194.0 196.0 2.82 31 2.0 0.1 0.7 1.9 7 322 
                     

* True width remains undetermined at this stage; all values are uncut.

** Ag equivalent is based on a silver price of US$24/oz with a process recovery of 89%, a gold price of US$2,200/oz with a process recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead price of US$1.00/lb with a process recovery of 85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 77.9 g/t Ag; 1% Cu: 85.4 g/t Ag; 1% Pb: 24.2 g/t Ag; and 1% Zn: 24.6 g/t Ag

Figure 1 - Boumadine Mining Licence Surface Plan with Magnetic Data (Residual Total Field) and 2025 Drill Holes



Figure 2 - Boumadine Property Surface Plan with 2025 Drill Holes



2025 Exploration Results

This year, 148 diamond drill holes (“DDH”), 31 reverse circulation holes (“RC”) and 15 multi-purpose drill holes (“MP”) totaling 79,732m have been completed at Boumadine (Figure 1, Figure 2 and Appendix 2). Drilling was conducted on strike along the Main Trend (North Zones), Tizi, Imariren as well as on some regional targets. The majority of results have been received for drill holes up to BOU-DD25-557 (Table 1, Figure 3, and Appendix 1).

Results received so far in 2025, including holes BOU-MP25-038 and BOU-MP25-028, confirm the high-grade continuity of the Main Trend, which remains open in all directions. Today’s results, with BOU-DD25-529 and BOU-DD25-547, also confirm the continuity of the Tizi Zone and extend Imariren mineralization to 1.0km. The Imariren and Tizi zones also remain open in all directions.

The main mineralization generally measures 1m to 4m wide (locally reaching over a 10m width) N340-oriented massive sulphide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins (>80%) are mainly composed of pyrite, with variable proportions of sphalerite, galena, and chalcopyrite. Tizi and Imariren share the same characteristics except for their N000 orientation.

Figures 4 and 5 shows the newly receive grab results on the western most permit, recently acquired. Strong gold and copper results helped identify the new Asirem high-grade mineralization at-surface, which will be test drilled in the coming months. The Au-Cu anomalies coincide with a strong N080 geophysical feature and a regional fault. This major structure can be traced for over 9km within our new western exploration permits.

Figure 3 – Surface Plan of Boumadine North, Imariren and Tizi Zones with New DDH Results



Figure 4 – Surface Map of Boumadine Property with Simplified Geology and Au Grab Results



Figure 5 – Surface Map of Boumadine Property with Simplified Geology and Cu Grab Results



Next Steps

Significant upside potential exists to expand the Boumadine Main Trend, which currently extends 5.4km, the Tizi Zone, which currently extends 2.0km and the Imariren Zone, with a current extension of 1.0km; the three trends remain open in all directions. Currently, the Corporation has mobilized drill rigs to complete the 100,000m to 140,000m drilling program. Half of the drilling will focus along the Main Trend, Imariren and Tizi to continue extending the known mineralization trend along strike and at depth and to infill known areas advancing the project towards a preliminary economic assessment. The remaining 50% will focus on greenfield exploration designed to test geological hypotheses and drill targets generated from the past three years of work. The results from ongoing geology work will determine additional development work.

Technical Information

Aya has implemented a quality control program to comply with best practices in sampling and analysis of drill core and RC chips. For core drilling, all individual samples represent approximately one meter in length of core, which is halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco. For drilling using RC, all individual samples represent 1.0m in length and a representative portion is kept for every meter in some chip trays stored on site. A split samples representing 1/16th, ranging from 2 to 4 kilogram is sent for preparation and assaying to Afrilab in Marrakech, Morocco.

All samples are analyzed for silver, copper, iron, lead, zinc, tin, and molybdenum using Aqua regia and finished by atomic absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed using fire assaying. Gold is assayed by fire assaying. Standards of different grades and blanks were inserted every 20 samples in addition to the standards, blanks and pulp duplicate inserted by Afrilab.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David Lalonde, B. Sc, Vice-President Exploration, Qualified Person, for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver Inc. is a rapidly growing, Canada-based silver producer with operations in the Kingdom of Morocco.

The only TSX-listed pure silver mining company, Aya operates the high-grade Zgounder Silver Mine and is exploring its properties along the prospective South-Atlas Fault, several of which have hosted past-producing mines and historical resources.

Aya’s management team maximizes shareholder value by anchoring sustainability at the heart of its production, resource, governance, and financial growth plans.

For additional information, please visit Aya’s website at or contact:

Benoit La Salle, FCPA, MBA

President & CEO

Alex Ball

VP, Corporate Development & IR

  

Forward-Looking Statements

This press release contains certain statements that constitute forward-looking information within the meaning of applicable securities laws (“forward-looking statements”), which reflects management's expectations regarding Aya’s future growth and business prospects (including the timing and development of new deposits and the success of exploration activities) and other opportunities. Wherever possible, words such as “expand”, “Identify”, “extend”, “confirm”, “prospective”, “target”, potential”, “become”, “position”, “continue”, “potential”, “to complete”, and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been used to identify such forward-looking information. Specific forward-looking statements in this press release include, but are not limited to, statements and information with respect to the (1) confirmation of high-grade continuity along the Boumadine Main Trend and the extension of the Imariren mineralized trend to 1 kilometer; (2) identification of a new mineralized high-grade at-surface zone to the west for potential future exploration; (3) identification of the new prospective high-grade Asirem zone to the west of Boumadine Main Trend for potential future exploration; (4) identification of the Asirem gold-copper zone as a new prospective target; (5) potential of Boumadine to become a large-scale, high-grade project; (6) intention and readiness to quickly drill test the newly identified Asirem regional target; (7) mineralized structure at Boumadine to be traced over 9 kilometers, supporting future exploration potential; (8) continued demonstration of Boumadine’s significant resource growth potential; (9) high-grade continuity within the Main Trend and its continued potential for extension, as it remains open in all directions; (10) continuity in the Tizi Zone and the extension of mineralization at Imariren to 1.0 km; (11) potential for continued extension and exploration at the Tizi and Imariren zones, which remain open in all directions; (12) identification of the new Asirem high-grade surface mineralization; (13) intention to drill test the new Asirem high-grade surface mineralization in the coming months; (14) major mineralized structure to be traced for over 9 kilometers within the newly acquired western exploration permits, supporting future exploration potential; (15) potential to expand the Boumadine Main Trend, Tizi Zone, and Imariren Zone, all of which remain open in all directions; (16) execution of the planned 100,000 to 140,000 meter drilling program at Boumadine; (17) continuation and success of the exploration program, including the extension of mineralization; (18) advancement of the project toward a preliminary economic assessment; (19) focus of future drilling on greenfield exploration and testing of geological hypotheses and targets generated over the past three years; (20) expectation that ongoing geological work will guide and determine further development activities. Although the forward-looking information contained in this press release reflect management's current beliefs based upon information currently available to management and based upon what management believes to be reasonable assumptions, Aya cannot be certain that actual results will be consistent with such forward-looking information. Such forward-looking statements are based upon assumptions, opinions and analysis made by management in light of its experience, current conditions, and its expectations of future developments that management believe to be reasonable and relevant but that may prove to be incorrect. These assumptions include, among other things, the ability to obtain any requisite governmental approvals, obtaining regulatory permits for on-site work, importing goods and machinery and employment permits, the accuracy of Mineral Reserve and Mineral Resource Estimates (including, but not limited to, ore tonnage and ore grade estimates), silver price, exchange rates, fuel and energy costs, future economic conditions, anticipated future estimates of free cash flow, and courses of action. Aya cautions you not to place undue reliance upon any such forward-looking statements.

The risks and uncertainties that may affect forward-looking statements include, among others: the inherent risks involved in exploration and development of mineral properties, including government approvals and permitting, changes in economic conditions, changes in the worldwide price of silver and other key inputs, changes in mine plans (including, but not limited to, throughput and recoveries being affected by metallurgical characteristics) and other factors, such as project execution delays, many of which are beyond the control of Aya, as well as other risks and uncertainties which are more fully described in Aya's 2024 Annual Information Form dated March 31, 2025, and in other filings of Aya with securities and regulatory authorities which are available on SEDAR+ at . Aya does not undertake any obligation to update forward-looking statements should assumptions related to these plans, estimates, projections, beliefs, and opinions change. Nothing in this document should be construed as either an offer to sell or a solicitation to buy or sell Aya securities. All references to Aya include its subsidiaries unless the context requires otherwise.

Appendix 1 – Full Drill Results from Boumadine (core lengths)

DDH No.

 From To Au Ag Length* Cu Pb Zn Mo Ag Eq** 
  (m) (m) (g/t) (g/t) (m) (%) (%) (%) (g/t) (g/t) 
BOU-DD25-492 0.0 666.0 0.00 0 666.0 0.0 0.0 0.0 0 0 
BOU-DD25-495 258.9 259.5 0.03 47 0.6 0.6 0.0 0.1 9 102 
BOU-DD25-499 0.0 705.0 0.00 0 705.0 0.0 0.0 0.0 0 0 
BOU-DD25-503 224.2 225.2 9.92 49 1.0 0.1 0.2 1.6 6 876 
BOU-DD25-507 28.0 29.4 1.18 20 1.4 0.0 0.4 2.0 14 171 
BOU-DD25-523 0.0 183.0 0.00 0 183.0 0.0 0.0 0.0 0 0 
BOU-DD25-527 129.4 131.3 0.73 26 1.9 0.1 0.2 0.3 2 99 
BOU-DD25-529 103.0 104.0 1.41 14 1.0 0.0 0.1 0.1 6 131 
BOU-DD25-529 105.9 108.2 1.42 6 2.3 0.0 0.3 0.5 4 142 
BOU-DD25-529 134.4 136.4 3.66 52 2.0 0.0 0.5 0.5 5 365 
BOU-DD25-532 43.6 44.4 3.32 32 0.8 0.0 0.1 0.2 16 299 
BOU-DD25-532 51.0 52.0 0.09 81 1.0 0.1 0.2 3.5 2 187 
BOU-DD25-532 165.3 165.8 1.22 11 0.5 0.2 0.1 0.4 2 135 
BOU-DD25-532 169.4 171.2 0.64 12 1.8 0.0 0.1 0.4 2 77 
BOU-DD25-532 189.0 190.0 0.89 6 1.0 0.0 0.3 1.3 3 114 
BOU-DD25-533 204.3 207.7 1.18 61 3.4 0.2 0.1 3.7 13 266 
Including 206.1 207.7 2.19 87 1.6 0.3 0.2 5.9 13 436 
BOU-DD25-534 0.0 114.0 0.00 0 114.0 0.0 0.0 0.0 0 0 
BOU-DD25-535 230.5 231.5 0.48 9 1.0 0.0 0.2 0.8 1 72 
BOU-DD25-537 65.6 70.0 0.92 29 4.4 0.1 0.1 0.4 6 118 
BOU-DD25-537 104.2 104.8 0.33 44 0.6 0.0 1.2 1.5 4 135 
BOU-DD25-537 108.5 109.0 0.24 42 0.5 0.0 0.5 1.0 8 102 
BOU-DD25-537 119.9 124.3 1.46 30 4.4 0.0 0.2 0.8 119 174 
BOU-DD25-538 203.5 204.3 0.23 74 0.8 0.1 0.2 1.7 2 147 
BOU-DD25-538 264.0 266.0 0.66 5 2.0 0.0 0.0 0.0 2 60 
BOU-DD25-539 80.2 81.0 0.90 1 0.8 0.0 1.1 1.1 7 128 
BOU-DD25-539 85.7 86.3 0.89 373 0.6 0.3 0.5 13.7 4 816 
BOU-DD25-539 113.0 113.9 0.46 11 0.9 0.0 0.4 1.1 2 86 
BOU-DD25-540 69.0 71.0 3.27 53 2.0 0.2 5.2 1.1 3 480 
BOU-DD25-540 164.2 165.1 0.90 11 0.9 0.1 0.0 0.1 8 93 
BOU-DD25-540 330.5 331.5 2.59 332 1.0 0.3 0.7 0.2 2 582 
BOU-DD25-541 111.8 112.9 0.78 52 1.1 0.0 0.2 1.5 9 159 
BOU-DD25-541 133.5 134.2 2.16 1 0.7 0.0 0.2 0.2 114 184 
BOU-DD25-541 165.7 166.3 1.02 3 0.6 0.1 0.1 0.1 1 93 
BOU-DD25-541 255.7 256.5 0.93 1 0.8 0.0 0.2 0.4 1 89 
BOU-DD25-542 22.4 23.0 0.84 13 0.6 0.0 0.3 0.3 20 96 
BOU-DD25-542 36.0 37.0 0.87 1 1.0 0.0 0.3 0.4 5 86 
BOU-DD25-542 177.3 179.0 0.80 1 1.7 0.0 0.3 0.5 14 86 
BOU-DD25-542 182.0 183.0 0.66 1 1.0 0.0 0.4 0.6 12 76 
BOU-DD25-543 200.0 201.0 0.68 6 1.0 0.0 1.0 1.6 4 124 
BOU-DD25-543 223.0 224.0 0.48 11 1.0 0.0 0.6 1.5 2 103 
BOU-DD25-544 31.9 44.2 0.31 60 12.3 0.0 1.1 1.9 4 161 
BOU-DD25-544 55.0 56.0 0.38 35 1.0 0.0 0.7 1.9 1 130 
BOU-DD25-545 130.8 131.8 0.60 32 1.0 0.2 1.2 3.2 14 205 
BOU-DD25-545 134.2 136.6 0.52 25 2.4 0.2 0.9 1.1 5 127 
BOU-DD25-545 177.8 178.5 0.46 23 0.7 0.1 1.3 2.9 6 170 
BOU-DD25-545 242.0 244.4 1.48 23 2.4 0.2 0.6 1.5 6 206 
BOU-DD25-545 368.4 369.3 0.50 16 0.9 0.0 0.1 1.2 1 88 
BOU-DD25-546 22.1 22.8 0.95 37 0.7 0.1 1.1 7.1 11 320 
BOU-DD25-546 41.7 42.6 0.38 21 0.9 0.0 0.5 1.2 4 91 
BOU-DD25-546 57.0 59.7 0.57 53 2.7 0.0 1.8 1.8 6 189 
BOU-DD25-546 62.4 63.3 0.45 26 0.9 0.0 1.2 1.8 9 137 
BOU-DD25-546 79.4 82.1 0.55 78 2.7 0.1 1.6 1.8 7 209 
BOU-DD25-547 69.3 73.0 0.72 22 3.7 0.0 0.3 0.7 4 106 
BOU-DD25-547 86.3 86.8 0.20 69 0.5 0.0 0.4 1.5 3 134 
BOU-DD25-547 97.8 98.6 0.74 26 0.8 0.0 0.5 1.0 2 123 
BOU-DD25-547 117.0 126.0 0.42 80 9.0 0.0 1.8 3.6 5 248 
BOU-DD25-548 0.0 294.0 0.00 0 294.0 0.0 0.0 0.0 0 0 
BOU-DD25-549 176.5 184.0 0.40 38 7.5 0.0 0.8 0.9 4 112 
BOU-DD25-549 186.0 187.7 0.32 34 1.7 0.0 1.5 3.2 8 176 
BOU-DD25-550 40.2 40.8 0.44 82 0.6 0.0 0.7 1.6 13 173 
BOU-DD25-551 95.5 100.0 0.47 36 4.5 0.0 0.8 1.0 8 116 
BOU-DD25-552 54.6 55.9 1.19 21 1.3 0.0 0.2 0.2 3 128 
BOU-DD25-552 123.4 124.1 0.41 19 0.7 0.0 0.1 0.4 6 64 
BOU-DD25-552 161.5 163.0 1.01 13 1.5 0.0 0.2 0.5 14 110 
BOU-DD25-552 166.6 168.1 0.69 117 1.5 0.0 1.8 2.7 8 282 
BOU-DD25-553 102.1 102.9 0.28 30 0.8 0.0 0.2 0.7 4 75 
BOU-DD25-553 286.3 287.8 0.73 108 1.5 0.3 2.2 4.8 3 361 
BOU-DD25-554 222.0 223.9 0.58 58 1.9 0.1 1.4 2.6 6 207 
BOU-DD25-554 224.9 226.5 0.29 34 1.6 0.0 0.9 1.6 9 119 
BOU-DD25-555 171.8 172.8 0.54 9 1.0 0.0 0.0 0.1 10 55 
BOU-DD25-556 24.7 30.5 1.73 2 5.8 0.0 0.0 0.1 12 141 
BOU-DD25-556 45.1 46.1 0.06 122 1.0 0.0 0.1 0.3 32 136 
BOU-DD25-557 212.0 213.0 0.40 25 1.0 0.0 0.0 0.1 2 60 
BOU-DD25-557 214.7 215.2 6.38 126 0.5 0.1 1.8 0.7 3 697 
BOU-DD25-557 222.2 222.8 2.30 21 0.6 0.0 0.4 1.0 1 236 
BOU-DD25-557 234.3 235.0 1.35 27 0.7 0.1 0.6 1.8 3 196 
BOU-DD25-557 246.3 247.0 2.52 30 0.7 0.2 0.4 0.7 5 273 
BOU-DD25-557 258.7 259.9 1.99 20 1.2 0.0 0.5 0.9 17 210 
BOU-DD25-557 266.6 268.4 2.32 34 1.8 0.1 0.1 0.1 5 231 
BOU-DD25-557 270.5 271.0 1.71 29 0.5 0.1 0.1 0.2 6 181 
BOU-DD25-560 82.0 83.0 1.19 9 1.0 0.0 0.0 0.0 10 104 
BOU-DD25-560 90.3 91.0 1.19 9 0.7 0.0 0.0 0.0 9 103 
BOU-MP25-024 0.0 200.0 0.00 0 200.0 0.0 0.0 0.0 0 0 
BOU-MP25-025 151.0 152.0 0.06 57 1.0 0.0 0.6 2.5 16 138 
BOU-MP25-025 164.0 165.0 0.40 17 1.0 0.0 0.1 0.5 13 63 
BOU-MP25-026 13.0 14.0 0.80 5 1.0 0.0 0.6 0.1 14 86 
BOU-MP25-026 238.5 243.2 0.58 36 4.7 0.1 1.3 7.2 12 296 
BOU-MP25-026 252.0 254.0 0.47 16 2.0 0.0 1.1 1.2 15 115 
BOU-MP25-026 317.0 318.0 1.12 2 1.0 0.0 0.1 0.1 2 96 
BOU-MP25-026 326.0 327.0 1.53 4 1.0 0.0 0.1 0.4 2 137 
BOU-MP25-028 392.1 396.4 3.27 19 4.3 0.1 0.1 0.3 8 286 
Including 392.1 394.2 5.46 26 2.1 0.1 0.1 0.0 10 460 
BOU-MP25-029 69.0 70.0 0.39 20 1.0 0.0 1.1 0.4 25 90 
BOU-MP25-031 275.0 276.3 0.47 31 1.3 0.0 0.4 0.9 6 100 
BOU-MP25-031 279.1 282.0 2.47 21 2.9 0.1 0.2 0.7 7 242 
BOU-MP25-034 191.0 192.0 0.53 12 1.0 0.0 0.4 0.7 6 83 
BOU-MP25-034 497.0 498.0 0.75 12 1.0 0.0 0.2 0.6 1 92 
BOU-MP25-036 312.3 313.0 0.87 19 0.7 0.0 0.7 1.3 3 137 
BOU-MP25-036 618.2 618.9 1.38 30 0.7 0.1 0.1 1.4 7 183 
BOU-MP25-036 646.8 647.5 1.34 11 0.7 0.1 0.1 1.4 8 161 
BOU-MP25-036 721.2 722.3 1.45 33 1.1 0.1 0.0 0.1 1 157 
BOU-MP25-037 733.6 734.4 3.52 10 0.8 0.0 0.1 0.2 1 293 
BOU-MP25-038 437.7 441.0 2.85 27 3.3 0.0 0.1 0.1 2 258 
Including 437.7 439.0 6.13 65 1.3 0.1 0.2 0.3 2 563 
BOU-MP25-038 453.9 457.6 1.66 2 3.7 0.0 0.0 0.2 4 139 
BOU-MP25-038 907.6 908.3 3.29 84 0.7 0.2 0.6 1.4 5 408 
BOU-MP25-039 164.0 166.0 0.24 161 2.0 0.0 0.2 0.3 5 192 
BOU-MP25-039 419.4 420.1 0.52 16 0.7 0.0 0.1 1.5 7 101 
BOU-MP25-039 466.0 467.0 0.97 12 1.0 0.1 0.6 1.2 14 136 
BOU-MP25-039 521.0 525.0 2.86 13 4.0 0.0 0.1 0.2 1 246 
Including 521.0 523.0 3.91 19 2.0 0.1 0.1 0.4 1 339 
BOU-MP25-039 565.0 565.6 0.61 26 0.6 0.1 0.7 2.4 2 154 
BOU-MP25-039 604.2 604.7 0.42 25 0.5 0.1 0.9 1.4 1 119 
BOU-MP25-040 413.5 415.4 0.89 25 1.9 0.0 0.3 0.8 14 126 
BOU-MP25-040 568.8 569.6 0.03 77 0.8 0.2 5.9 2.8 4 308 
BOU-MP25-040 571.6 572.5 0.03 77 0.9 0.0 0.2 0.4 6 95 
BOU-MP25-040 574.3 576.9 1.94 26 2.6 0.1 0.8 0.6 3 218 
BOU-MP25-041 70.0 71.0 0.39 20 1.0 0.0 1.4 1.4 27 120 
BOU-MP25-041 81.0 83.0 0.90 15 2.0 0.0 0.9 1.1 30 138 
BOU-MP25-041 114.0 115.0 0.47 16 1.0 0.1 0.4 2.6 9 130 
BOU-MP25-041 116.0 120.0 0.69 19 4.0 0.0 0.6 2.3 7 148 
BOU-MP25-041 121.0 122.0 0.52 10 1.0 0.0 0.1 0.1 7 56 
BOU-MP25-041 487.0 487.5 1.77 30 0.5 0.1 0.5 1.7 1 228 
BOU-MP25-041 621.5 622.4 0.72 33 0.9 0.3 0.3 0.3 18 128 
BOU-MP25-041 626.0 626.5 0.50 64 0.5 0.1 1.3 1.9 6 193 
BOU-MP25-041 644.6 645.1 2.50 45 0.5 0.1 0.5 3.4 1 347 
BOU-MP25-041 648.6 649.1 4.86 20 0.5 0.0 0.7 1.6 1 458 
BOU-MP25-042 189.0 190.0 0.51 8 1.0 0.0 0.9 1.0 9 96 
BOU-MP25-042 194.0 196.0 2.82 31 2.0 0.1 0.7 1.9 7 322 
BOU-MP25-042 776.4 776.9 0.80 6 0.5 0.1 0.5 0.4 20 100 
                      

* True width remains undetermined at this stage; all values are uncut.

** Ag equivalent is based on a silver price of US$24/oz with a process recovery of 89%, a gold price of US$2,200/oz with a process recovery of 85%, a zinc price of US$1.20/lb with a process recovery of 72%, a lead price of US$1.00/lb with a process recovery of 85%, and a copper price of US$4.00/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 77.9 g/t Ag; 1% Cu: 85.4 g/t Ag; 1% Pb: 24.2 g/t Ag; and 1% Zn: 24.6 g/t Ag.

Appendix 2 – New Drillhole Coordinates of 2025 Boumadine Exploration Program (completed holes)

DDH No.EastingNorthingElevationAzimuthDipLength (m)

BOU-DD25-59630527834736931245180-50156 
BOU-DD25-59730527834737741240180-50168 
BOU-DD25-59830527834738681252180-50216 
BOU-DD25-59931753634762761212250-50820 
BOU-DD25-60030527834739461249180-50237 
BOU-DD25-60130420834732241349180-50153 
BOU-DD25-60231733834769691201250-50846 
BOU-DD25-60330420834733161320180-50330 
BOU-DD25-60631717134757391250250-50543 
BOU-MP25-07031770034764511208250-55102 
BOU-MP25-07131761234763031209250-55126 
BOU-MP25-07231763134761141231250-55200 
BOU-MP25-07331744034761571213245-5536 
BOU-MP25-07431744034761571213245-5536 
BOU-MP25-0753173853474168128665-5012 
BOU-MP25-0763173853474168128665-5584 
BOU-MP25-0773173163474143127365-55102 
BOU-MP25-07831770034764511208250-5012 
BOU-RC25-02831714234761811218250-55192 
BOU-RC25-02931710434761671219250-55156 
BOU-RC25-03031706534761531223250-55200 
BOU-RC25-03133255534879431033315-50192 
BOU-RC25-03233233734878191039135-50200 
BOU-RC25-03333131334868361069135-55200 
BOU-RC25-03433128634868641066135-50200 
BOU-RC25-03533546534719631183180-50150 
BOU-RC25-03633546434719221182180-50144 
BOU-RC25-03733556434719081190180-50200 
BOU-RC25-03833556434719551194180-5012 
        

Photos accompanying this announcement is available at:



EN
07/07/2025

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Aya Gold and Silver

 PRESS RELEASE

Aya Gold & Silver Reports High-Grade Boumadine Exploration Results, Ex...

Aya Gold & Silver Reports High-Grade Boumadine Exploration Results, Expands Imariren to 1km and Identifies New High-Grade Asirem Zone to the West MONTREAL, July 07, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce new high-grade drill exploration results from its 2025 program at Boumadine in the Kingdom of Morocco. Today's results also extend the Imariren mineralized trend to 1 kilometer (“km”) and confirm high-grade continuity along the Boumadine Main Trend. In addition, Aya is pleased to announce that it has ide...

 PRESS RELEASE

Aya Or & Argent inc. publie des résultats d’exploration à haute teneur...

Aya Or & Argent inc. publie des résultats d’exploration à haute teneur à Boumadine, augmente l’étendue de la zone Imariren à 1 km et identifie la zone Asirem, une nouvelle zone à haute teneur à l’ouest MONTRÉAL, 07 juill. 2025 (GLOBE NEWSWIRE) -- Aya Or & Argent inc. (TSX : AYA; OTCQX : AYASF) (« Aya » ou la « Société ») a le plaisir d’annoncer les nouveaux résultats de forage d’exploration à haute teneur issus de son programme 2025 à Boumadine, dans le Royaume du Maroc. Les résultats annoncés d’aujourd’hui permettent également d’augmenter de 1 kilomètre (« km ») l’étendue du corridor min...

 PRESS RELEASE

Aya Gold & Silver Launches Drill Exploration Program at Zgounder Far E...

Aya Gold & Silver Launches Drill Exploration Program at Zgounder Far East and Adds 6 New Regional Permits MONTREAL, June 26, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to announce high-grade silver results from its ongoing drill exploration program at the Zgounder Silver Mine and the start of its drill exploration program in the Far East permits in the Kingdom of Morocco. The Corporation has also acquired six (6) new permits to the north, expanding the Zgounder exploration footprint by 11.9% to over 452.7 square kilomet...

 PRESS RELEASE

Aya Gold & Silver Reports May Silver Production

Aya Gold & Silver Reports May Silver Production MONTREAL, June 25, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Corporation”) is pleased to report silver production for the month of May at its Zgounder Silver Mine located in the Kingdom of Morocco. May Production Metrics Production Metrics Q1-2024Q1-2025April 2025May 2025Silver productionoz366,3621,068,652345,550353,879Tonnage processedkt81,331249,74390,76391,077Silver recovery%82828088Mill availability%96919898Mine productiont106,880194,66182,49671,814 May Operational Highlights Silver r...

 PRESS RELEASE

Aya Gold & Silver Closes Credit Facility with the EBRD to Support Boum...

Aya Gold & Silver Closes Credit Facility with the EBRD to Support Boumadine Development MONTREAL, June 23, 2025 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; OTCQX: AYASF) (“Aya” or the “Company”) is pleased to announce the closing of the previously announced US$25 million credit facility with the European Bank for Reconstruction and Development (“EBRD”) to support the advancement of development work at its Boumadine polymetallic project located in the Draa-Tafilalet region in the Kingdom of Morocco. This marks the third transaction between Aya and EBRD in support of Aya’s stra...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch