BBB Brixton Metals Corp.

Brixton Metals Drills 1,750 g/t Ag, 5.39 g/t Au, 2.65% Cu over 1.37m within a Broad 224.85m of 78.16 g/t Ag, 0.66 g/t Au, 0.24% Cu at its Hog Heaven Project

Brixton Metals Drills 1,750 g/t Ag, 5.39 g/t Au, 2.65% Cu over 1.37m within a Broad 224.85m of 78.16 g/t Ag, 0.66 g/t Au, 0.24% Cu at its Hog Heaven Project

VANCOUVER, British Columbia, July 07, 2020 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSXV:BBB)(OTCQB:BBBXF) (the “Company” or “Brixton”) announces initial drill results from its maiden drill program at is wholly owned Hog Heaven Project, which returned multiple significant intervals of high-grade silver, gold and copper mineralization. A total of seven holes representing 1,400.35 metres were drilled of HQ sized core.

Chairman and CEO of Brixton, Gary R. Thompson stated, “We are very pleased to have successfully completed our maiden drill program at the Hog Heaven Project. The new, strategic approach under Brixton is to define a compliant resource on the high-grade silver-gold-copper targets as a near term underground operation versus the historic mine plan, which was an open pit mine plan. Based on these results and our preliminary interpretation of the remaining holes, we plan to complete a Phase II exploration program at the Hog Heaven Project later this summer.”

The purpose of this drilling program was to validate historical results from the 1970’s and 1980’s at the Main Mine area. High grade mineralization was encountered in all of the holes drilled.

Highlights of Hole HH20-02

  • Drill hole HH20-02 intersected a broad 224.85m zone of mineralization for 78.16 g/t Ag, 0.66 g/t Au, 0.24% Cu (75.07m-299.92m) which includes the following:



    • 5.48m of 445.79 g/t Ag, 1.41 g/t Au, 1.50% Cu



    • 2.13m 0f 917.36 g/t Ag, 2.00 g/t Au, 3.06% Cu



    • 53.49m of 165.90 g/t Ag, 1.28 g/t Au, 0.55% Cu



    • 13.56m of 185.80 g/t Ag, 2.24 g/t Au, 0.76% Cu



    • 1.37m of 1,750 g/t Ag, 5.39 g/t Au, 2.65% Cu

Brixton plans to discuss these results, along with the ongoing work at its Thorn Project, in a webinar on Tuesday, July 7th at 2pm EDT (11am PDT). Please register here

()

High grades emerged within the hole as two distinct Upper and Lower Zones.

The Upper Zone interval of 36.18 metres is from 75.07 metres to 111.25 metres depth. Several semi-massive to massive sulphide mineralization within a latite porphyry dyke and along its brecciated margins. Specific high-grade intervals within the Upper Zone include 5.48 metres of 445.79 g/t Ag, 1.41 g/t Au, and 1.50% Cu, including 2.13 metres of 917.36 g/t Ag, 2.00 g/t Au, 3.06% Cu. 

The Lower Zone interval of 53.49 metres is from 198.12 metres to 251.61 metres, encountered in the sediment-hosted unit, a newly-recognized mineral style at Hog Heaven. In this zone, mineralization is strata-bound within pebble conglomerates and occurs over numerous semi-massive to massive and vuggy replacement horizons. In total the Lower Zone 53.49 metre interval returned 165.90 g/t Ag, 1.28 g/t Au, 0.55% Cu. Several high-grade intervals within the zone returned 9.45 metres assaying 221.90 g/t Ag, 1.05 g/t Au, and 0.94% Cu; 0.32 metres assaying 1,010 g/t Ag, 7.47 g/t Au, and 0.64% Cu; and 13.56 metres assaying 185.80 g/t Ag, 2.24 g/t Au, and 0.76% Cu.  An additional massive sulphide horizon from the Lower Zone assayed 1.37m of 1,750.00 g/t Ag, 5.39 g/t Au, and 2.65% Cu.

Figure 1. Plan Map of Drill Collar Locations:

Table1. Drill hole HH20-02 of Mineralized Intervals as Composite Weighted Average Assays.

Hole IDRemarksFrom

(m)
To (m)Total

(m)
Ag g/tAu g/tCu %
HH20-02All Mineralization75.07299.92224.8578.160.660.24
        
HH20-02Upper Zone75.07111.2536.18119.720.250.26
includingPorphyry Dyke w/margin105.77111.255.48445.791.411.50
containingPorphyry Dyke105.77107.902.13917.362.003.06
        
HH20-02Lower Zone198.12251.6153.49165.901.280.55
includingSemi-massive sulphide198.12207.579.45221.901.050.94
containingSemi-massive sulphide234.85248.4113.56185.802.240.76
includingSemi-massive sulphide237.90245.067.16259.082.681.15
IncludingVuggy massive sulphide250.24251.611.37 1,750.00 5.392.65

The assay intervals reported are uncut weighted averages and true widths cannot be determined at this time. Hole HH20-02 was drilled as a vertical hole to a depth of 299.92 metres.

Figure 2. Hole HH20-02 Graphic Profile:

Figure 3. HQ Core from Hole HH20-02: Massive Sulphide from 250.24 – 251.61m depth (1.37m of 1,750 g/t Ag, 5.39 gt/ Au, 2.65% Cu):

Figure 4. Close up HQ Core Hole HH20-02, Massive Sulphide (pyrite, digenite, enargite) from 250.50m depth:

For more detail please see link to the strip log and additional core pictures:

Brixton recognizes the potential for the Hog Heaven Project to host a cluster of mineralized systems. Results from the recent soil sampling and other recently completed drill holes on the Hog Heaven Project will be released when they have been received and analyzed by the Company.

At least three primary target areas have been identified for further drilling: the Main Mine, WF-Ole Hill area and Martin Mine area. The project has affinity for strata-bound Cu-Ag deposits, high-sulphidation Ag-Au-Cu deposits and porphyry Cu-Au deposits.

Figure 5. Hog Heaven Project Target Areas:

Quality Assurance and Quality Control

As a matter of procedure, the mineralized intervals of drill core were split in the field using an electric-powered core saw, bagged, and delivered to ALS Chemex Laboratories in Vancouver for analysis. In addition to the laboratory's quality control program, a rigorous on-site quality assurance and quality control program was implemented, which involved the insertion of blanks, standards and splits to ensure reliable assay results. The standards, blanks and duplicate assays were found to fall within acceptable limits, supporting the precision and accuracy of the reported results. The QAQC was conducted by an independent third-party, Mr. Scott Close, P.Geo., Principal of Ethos Geological Inc., who is a qualified person as defined by National Instrument 43-101, and who reviewed and approved the information in this press release.

Chairman and CEO of Brixton, Gary R. Thompson further stated, “The Company has accepted the resignation of Mr. Sorin Posescu, VP Exploration for the Company. On Behalf of everyone at Brixton I wish to thank Mr. Posescu for his work over the past decade and wish him the best in his future endeavors.”

Effectively immediately, Mr. Mitchell Smith has been promoted to Vice President of Investor Relations for the Company.

About Brixton Metals Corporation

Brixton is a Canadian exploration and development company focused on the advancement of its mining projects toward feasibility. Brixton wholly owns four exploration projects, the Thorn copper-gold-silver Project, the Atlin Goldfields Projects located in NWBC, the Langis-HudBay silver-cobalt Project in Ontario and the Hog Heaven silver-gold-copper Project in NW Montana, USA. Brixton Metals Corporation shares trade on the TSX-V under the ticker symbol BBB. For more information about Brixton please visit our website at .

On Behalf of the Board of Directors

Mr. Gary R. Thompson, Chairman and CEO

Tel: 604-630-9707 or email:

For Investor Relations please contact Mitchell Smith at or 604-630-9707



Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Information set forth in this news release may involve forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as “anticipate”, “believe”, “plan”, “estimate”, “expect”, and “intend”, statements that an action or event “may”, “might”, “could”, “should”, or “will” be taken or occur, including statements that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans, or other similar expressions. All statements, other than statements of historical fact included herein including, without limitation, statements regarding the use of proceeds, By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the following risks: the need for additional financing; operational risks associated with mineral exploration; fluctuations in commodity prices; title matters; and the additional risks identified in the annual information form of the Company or other reports and filings with the TSXV and applicable Canadian securities regulators. Forward-looking statements are made based on management’s beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by applicable securities laws. Investors are cautioned against attributing undue certainty to forward-looking statements.

Photos accompanying this announcement are available at:

EN
07/07/2020

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Brixton Metals Corp.

 PRESS RELEASE

Brixton Metals Drills 28.35m of 1.63 g/t of Gold, 76.79 g/t Silver, 0....

Brixton Metals Drills 28.35m of 1.63 g/t of Gold, 76.79 g/t Silver, 0.61% Copper and 1002 g/t Antimony at the Northside Vein, Camp Creek Area Including 8.77m of 2.52 g/t Gold, 120.87 g/t Silver, 1.22% Copper and 1481 g/t Antimony VANCOUVER, British Columbia, Aug. 19, 2025 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce further drill results from its near surface program at Camp Creek area. These 2 holes are the balance of early 2025 season drilling in the Camp Creek area for a total of 2165m over 12 holes. D...

 PRESS RELEASE

Brixton Metals Drills 16m of 3.4 g/t Gold, 96 g/t Silver, 0.59% Copper...

Brixton Metals Drills 16m of 3.4 g/t Gold, 96 g/t Silver, 0.59% Copper, 0.12% Antimony at the Glenfiddich Zone, Camp Creek Corridor Including 6m of 6.17 g/t Gold, 221 g/t silver, 1.4% Copper and 0.27% Antimony from 63m depth VANCOUVER, British Columbia, July 29, 2025 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce its second batch of drill results of the 2025 season from its wholly owned Thorn Project located in NW British Columbia, Canada. The Thorn Project is an underexplored copper-gold porphyry district wi...

 PRESS RELEASE

Brixton Metals Starts Drilling at the Catalyst Copper-Gold Porphyry Ta...

Brixton Metals Starts Drilling at the Catalyst Copper-Gold Porphyry Target with a Second Drill VANCOUVER, British Columbia, July 24, 2025 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce that it has begun drilling at the newly identified Catalyst Copper-Gold Porphyry Target at its wholly owned Thorn Project located in NW British Columbia, Canada. The Thorn Project is an underexplored copper-gold porphyry district with several large-scale exploration target areas identified. Drilling is ongoing at its Trapper Gold...

 PRESS RELEASE

Brixton Metals Drills 1.5m of 9.5 g/t Gold, 13.8% Copper, 771.5 g/t Si...

Brixton Metals Drills 1.5m of 9.5 g/t Gold, 13.8% Copper, 771.5 g/t Silver, 7.6% Lead, 609 g/t Tellurium, 7.1% Zinc, and >1% Antimony VANCOUVER, British Columbia, July 22, 2025 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce its first batch of drill results of the 2025 season from its wholly owned Thorn Project located in NW British Columbia, Canada. The Thorn Project is an underexplored copper-gold porphyry district with several large-scale exploration target areas identified. Brixton is operating with one diam...

 PRESS RELEASE

Brixton Metals Closes Private Placement

Brixton Metals Closes Private Placement Not for distribution to United States Newswire Services or for dissemination in the United States VANCOUVER, British Columbia, July 11, 2025 (GLOBE NEWSWIRE) -- Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce that it completed on July 11, 2025, the non-brokered private placement previously announced on July 7, 2025 (the "Offering").   The Offering consisted of 18,234,708 flow-through shares (each, a “FT Share”), for total gross proceeds of $2,370,512.04.   Each FT Share was issued as a ...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch