CDSG CHINA DONGSHENG INTERNATIONAL INC

CDSG SAMPLES UP TO 2.79% LI2O WITHIN EXTENSIVE AND EXTREMELY STRONG LITHIUM GEOCHEMICAL ANOMALIES AT TITAN 1 PROJECT

CDSG SAMPLES UP TO 2.79% LI2O WITHIN EXTENSIVE AND EXTREMELY STRONG LITHIUM GEOCHEMICAL ANOMALIES AT TITAN 1 PROJECT

Las Vegas, NV , March 02, 2023 (GLOBE NEWSWIRE) -- China Dongsheng International Inc., (OTC Markets: CDSG) (the “Company” or “CDSG”) is pleased to announce positive soil geochemical sampling results from the first phase of the company’s extensive Titan 1 lithium property in Tanzania.

Craig Alford, MSc, PGeo, and CEO of the Company, a Qualified Person under NI 43-101, noted “The results from the initial geochemical sampling are staggering. The size and strength of the Lithium anomaly at Titan 1 is particularly exceptional as it is within an area that has had no previous exploration and both sample lines ended at their northern limit within some of the highest grades of up 2.79% Li2O. These very strong results are being followed up by ongoing sampling and exploration on the Titan 1 Project area.” More results will be announced in the coming weeks.

Rigorous Quality control of the samples was maintained and all samples were prepared and analyzed at the independent and ISO 9001 certified African Minerals and Geosciences Centre (AMGC) in Dar es Salaam, Tanzania.

As part of the work on our largest Project, Titan 1, two lines of surficial geochemical soil surveys were collected over a section of the nearly 115 square mile (300 sq km) central Prospecting License (“PL”). The lines were run approximately Northwest-Southeast and spaced 3 kms apart.

Results from both lines returned very high Lithium values over extensive distances, two zero values were returned from each line, however, the positive geochemical results indicated lithium values ranging from 100 ppm to highs of 13,000 ppm with average values of 0.55% Li2O (2,569ppm Li) over 7.4 miles (12 km) for the westernmost line and 1.14% Li2O (5,300ppm Li) over 3.7 miles (6 km) for the eastern line. Values for sodium, potassium, magnesium broadly mirror and confirm the distribution of the anomalous lithium values. Potassium oxide (K2O) values ranged as high as 3.6% in the results.

The Titan 1 PL is centered over a vast, sparsely vegetated, flat lying ‘playa’ covered by a thin layer of alluvium overlying volcano-sedimentary basin fill. The area is morphologically and depositionally somewhat similar to the company’s WEL project claim area, containing mudstones much like the TLC project (American Lithium Corp.)  and the Thacker Pass (Lithium Americas Corp.) projects of Nevada.

The project is part of a Definitive Agreement with Kilimanjaro Lithium Inc., a private corporation domiciled in the United Republic of Tanzania, whereby CDSG has the exclusive right to earn up to a One Hundred Percent (100%) interest in two large Lithium projects, Titan 1 and 2.  Presently, the company has already fulfilled the requirements for 80% of the total earn-in on both projects.

To simplify the business descriptions of Titan Lithium (CDSG) and Barrel Energy (BRLL), and how they associate with each other, CDSG is our lithium resource holdings company and BRLL is our technology company. Management of both companies are very excited to continue the announcements of advancements into Lithium resources, especially, in sharing the completion of the agreement relating to our claystone extraction technology.

About the Company: China Dongsheng International Inc. (OTC Markets: CDSG), through its wholly owned subsidiary Titan Lithium, Inc., is a lithium explorer and developer with operations in Nevada, USA and The United Republic of Tanzania. 

Contact:

Harp Sangha-Chairman

                                    

titanlithiuminc.com

Forward-Looking Statements:

This press release may contain "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995, such as statements relating to financial results and plans for future development activities and are thus prospective. Forward-looking statements include all statements that are not statements of historical fact regarding intent, belief or current expectations of the Company, its directors or its officers.  Investors are cautioned that any such forward-looking statements are not guarantees of future performance and involve risks and uncertainties, many of which are beyond the Company's ability to control. Actual results may differ materially from those projected in the forward-looking statements. Among the factors that could cause actual results to differ materially from those indicated in the forward-looking statements are risks and uncertainties associated with the Company's business and finances in general, including the ability to continue and manage its growth, competition, global economic conditions and other factors discussed in detail in the Company's periodic filings with the Securities and Exchange Commission.



EN
02/03/2023

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on CHINA DONGSHENG INTERNATIONAL INC

 PRESS RELEASE

CDSG ADDS GOLD PROJECT IN TANZANIA

CDSG ADDS GOLD PROJECT IN TANZANIA Las Vegas, NV., April 29, 2024 (GLOBE NEWSWIRE) -- China Dongsheng International, Inc. (OTC Markets: CDSG) (the “Company” or “CDSG”) is pleased to announce CDSG has entered into a co-production agreement with an individual based in Tanzania to recover gold from a large alluvial gold field within the active Nachingwea District, Lindi Region of southern Tanzania. Harp Sangha, Chairman of CDSG states, “This additional project is a further step towards our strategy of acquiring non-exploration, near-term low-cost gold producing projects; to bring robust cas...

 PRESS RELEASE

CDSG PLANS HIGHLY PROFITABLE GOLD PRODUCTION IN WESTERN TANZANIA

CDSG PLANS HIGHLY PROFITABLE GOLD PRODUCTION IN WESTERN TANZANIA Las Vegas, NV., April 22, 2024 (GLOBE NEWSWIRE) -- Titan Lithium Inc., (OTC Markets: CDSG) (the “Company” or “CDSG”) is pleased to announce CDSG has entered into a co-production agreement with a company based in Tanzania to recover gold from the processed tailings within the heart of the gold region of Tanzania. The Company is presently planning a 200 ton per day Carbon in Pulp (“CIP”) processing plant that will serve to initially process 20,000 - 30,000 tons of tailings annually. CDSG has begun sourcing out prefabricated C...

 PRESS RELEASE

CDSG PROVIDES A CORPORATE AND STRATEGIC UPDATE FOR 2024

CDSG PROVIDES A CORPORATE AND STRATEGIC UPDATE FOR 2024 Las Vegas, NV, April 18, 2024 (GLOBE NEWSWIRE) -- Titan Lithium Inc., (OTC Markets: CDSG) (the “Company” or “CDSG”) is pleased to provide a corporate update regarding a number of significant business items. On April 3rd 2024, the company filed our Form 10 registration statement with the U.S. Securities and Exchange Commission (SEC) and we anticipate the Form 10 will be fully effective in June of this year. The Form 10 includes important information about the company’s business, assets, strategy, and historical financial results. Sep...

 PRESS RELEASE

X-Ray Diffraction Test Work confirms widespread Lithium bearing minera...

X-Ray Diffraction Test Work confirms widespread Lithium bearing minerals at Titan Lithium Projects Las Vegas, NV. , April 15, 2024 (GLOBE NEWSWIRE) -- Titan Lithium Inc., (OTC Markets: CDSG) (the “Company” or “CDSG”) is pleased to announce the X-ray diffraction (XRD) results for various selected samples from its auger drill program conducted at the both the Titan 1 and Titan 2 projects in Tanzania. The aim of the analysis was to identify and quantify the lithium bearing minerals present at the projects that have resulted in the anomalous lithium values as previously reported at the projec...

 PRESS RELEASE

ASTER DATA IDENTIFIES HUGE SPECTRAL ANOMALY AT TITAN 1

ASTER DATA IDENTIFIES HUGE SPECTRAL ANOMALY AT TITAN 1 Las Vegas, NV., Jan. 30, 2024 (GLOBE NEWSWIRE) -- Titan Lithium Inc., (OTC Markets: CDSG) (the “Company” or “CDSG”) is pleased to announce that it received a report detailing a completed multispectral ASTER analysis across the large Titan 1 Lithium Project area in Tanzania. The contents of the report covers an examination of spectral data conducted in late 2023 and represents an important fully independent confirmation of the company’s observations recorded to-date on the projects as well as providing multiple new high value targets. ...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch