COP.. Marimaca Copper

Marimaca Announces Infill Drilling Results Further Confirming Consistency of Mineralization at the MOD

Marimaca Announces Infill Drilling Results Further Confirming Consistency of Mineralization at the MOD

VANCOUVER, British Columbia, Sept. 07, 2022 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to announce further results from the 2022 infill and extensional drilling campaign at the Marimaca Oxide Deposit (the “MOD”). Results reflect a total of 6,130m across 31 drill holes.

The drilling intersected mineralization in-line with the current geological interpretation of the MOD. Drilling in the south-east zone of the MOD, on trend with the Sierra and Sorpresa satellite targets, continues to demonstrate extensions to green-oxide rich mineralization beyond the previously interpreted limits of the 2019 Mineral Resource Estimate (“MRE”). Copper oxide mineralization also remains open to the east of the MOD. Hole MAR-158 was drilled on a ~150m step-out from the eastern pit limits and intersected continuations of shallow green oxide mineralization. Drilling on the western boundary of the MOD confirmed limits of copper oxide mineralization with lower-grade intersections of thinning mineralization. In the central MOD, hole MAR-65Ext intersected extensions of higher-grade mineralization into the MAMIX zone.

Highlights

  • Infill drilling intersected extensions to known green-oxide mineralization in the south-east zone of the MOD, consistent with previous 2022 results (see release dated March 28, 2022)
  • MAMIX drilling intersected extensions to higher grade oxide and mixed mineralization at depth, improving confidence in the higher-grade core of the MOD and MAMIX
  • Oxide intersections from step-out drilling on the north-eastern boundary of the MOD (MAR-158) demonstrates a material broadening of the MOD’s oxide halo to the east which is consistent with previous step-out drilling (MAR-126, see release dated May 5, 2021)
  • Notable intersections include
    • MAR-65Ext intersected 332m at 0.44% CuT from 36m, including a higher-grade extension of 78m at 0.90% CuT from 218m
    • LAR-96 intersected 98m at 0.41% CuT from surface including 22m at 1.14% CuT from surface
    • MAR-172 intersected 200m at 0.25% CuT from 12m including 66m at 0.51% CuT from 38m
    • MAR-171 intersected 164m at 0.37% CuT from 2m including 96m at 0.53% CuT from 70m
    • MAR-158 intersected 72m at 0.36% CuT from 120m
    • LAR-03 intersected 346m at 0.32% CuT from 2m including 40m at 0.34% CuT from 272m
    • LAR-25 intersected 340m at 0.33% CuT from 12m
  • The 2022 drilling program is now finalized with 38,570m of RC and 3,000m of diamond drilling complete
    • 21,992m of remaining drilling to be released pending final assay results

Sergio Rivera, VP Exploration of Marimaca Copper, commented:

“We have now completed the 2022 Marimaca drilling campaign with our work now focused on the upcoming mineral resource update planned for late September or early October.

“Overall, the 2022 program was a success. All our objectives going into the program were met and results continue to be in-line with our geological interpretation at the MOD, with the consistency of the Marimaca mineralization demonstrated again in this latest batch of results.”

Overview of Drilling Campaign Objectives

Marimaca’s 2022 RC drilling campaign consists of over 38,570m of drilling between the MOD infill and the MAMIX zone, the depth extension of the MOD.

Geological interpretation and resource modelling is currently underway ahead of the planned 2022 Mineral Resource Update (“MRE”) expected in late Q3. The 2022 MRE will capture drilling data completed up to June 30th, 2022, with the balance of the infill drilling (targeting conversion to Measured and Indicated Resource categories) to be captured in a subsequent MRE planned for early 2023.

Figure 1: Plan View of Infill Drilling Results, Pending Holes and MOD PEA Pit Shell:

Table 1. Summary of Infill Drill Results

HoleTD (m) From (m)To (m)m%CuT
MAR-158

200

 81921840.23
including868600.22
including828200.23
and4664180.41
 120192720.36
including120146260.44
and174192180.71
MAR-159

200

 7284120.21
 150172220.25
MAR-160

160

 2438140.14
 92104120.52
MAR-161210 112164520.27
MAR-162

180

 212100.29
 122134120.25
MAR-163

180

 2860.22
 88150620.14
MAR-164

200

 2860.32
 126192660.24
including152192400.31
MAR-165

200

 118148300.23
including124138140.34
MAR-166

300

 123002880.19
including1230180.23
and5688320.32
 98138400.21
 16417280.36
 230300700.29
including230258280.49
and282300180.27
MAR-167

300

 98154560.15
including98122240.20
 1882921040.20
including188252640.20
 270292220.33
MAR-168

200

 141501360.20
including14104900.16
and124150260.46
MAR-169

250

 962001040.27
including1252400.20
and96140440.23
 150200500.35
including150176260.21
and186200140.81
 222242200.17
MAR-170

250

 14102880.28
including1442280.50
and80102220.42
 20621480.48
MAR-171

200

 21661640.37
including220180.21
and3854160.32
 70166960.53
including70118480.71
and140166260.62
MAR-172

220

 122122000.25
including1228160.16
 38104660.51
including3860220.51
and72104320.67
 134170360.22
LAR-88

200

 6274120.12
 146156100.29
LAR-89

170

 1224120.41
 144168240.18
LAR-90

200

 1834160.18
 114130160.16
LAR-91

150

 436320.21
 116134180.15
LAR-93260 5882240.21
LAR-94

150

 341481140.17
including3476420.16
 110148380.28
including126148220.41
LAR-95

300

 281901620.20
including4080400.41
and160182220.27
 228252240.18
LAR-96

270

 098980.41
including022221.14
and7098280.38
 15616480.53
 236266300.17
including236248120.27
LAR-97170 418140.26
ATR-113

160

 241521280.22
including2438140.31
and5092420.33
 136152160.33



Table 2. Summary of MAMIX Drill Results

HoleTD (m) From (m)To (m)m%CuT
LAR-03ext

350

Historic + New23483460.32
 262348860.25
 272312400.34
LAR-15ext

450

Historic + New124284160.15
 302320180.30
 416428120.13
LAR-25ext

400

Historic + New123523400.33
 256352960.24
MAR-65ext

400

Historic + New363683320.44
 2183681500.61
including218296780.90
ATR-89ext

400

Historic + New103743640.21
 318374560.24
including340374340.34



Table 3. Infill collars and survey

HoleEastingNorthingElevationAzimuthInclinationDepth
MAR-158375363.67435943.51127.3220-60200
MAR-159375219.27435932.41119.5220-60200
MAR-160375256.07435905.71109.6310-60160
MAR-161375176.67435902.61114.7310-60210
MAR-162375235.77435861.81093.6310-60180
MAR-163375148.17435868.51110.4310-60180
MAR-164375234.37435853.91093.3220-60200
MAR-165375146.07435861.81110.4220-60150
MAR-166375163.77435000.11050.8310-60300
MAR-167375110.57435834.21104.6310-60300
MAR-168375224.97434945.91036.6310-60200
MAR-169375268.17435159.11061.5220-60250
MAR-170374974.07435243.11051.4220-60250
MAR-171374991.97435297.51060.7220-60200
MAR-172375158.07435199.71080.0220-60220
LAR-88374572.77435553.31026.6220-60200
LAR-89374665.87436069.2961.9310-60170
LAR-90374557.67435609.91023.8220-60200
LAR-91374494.57435937.8964.0220-60150
LAR-92374443.37435844.1972.0220-60150
LAR-93374556.17435697.01014.9220-60260
LAR-94374608.27435588.31050.8220-60150
LAR-95374639.37435579.11064.0220-60300
LAR-96 (*)374762.07435919.01015.0220-60270
LAR-97374522.77435811.0984.6220-60170
ATR-113374771.67436325.51047.4310-60160
(*) unsurveyed collar location    



Table 4. MAMIX collars and survey

HoleEastingNorthingElevationAzimuthInclinationExtensionFinal Depth
LAR03-EXT374684.67435736.11084.7310-60100350
LAR15-EXT374839.07435824.81068.2220-60200450
LAR25-EXT374765.17435781.11076.1220-60150400
MAR65-EXT374902.17435647.21112.9220-60200400
ATR89-EXT375062.37435866.51093.2310-60100400



Sampling and Assay Protocol

True widths cannot be determined with the information available at this time. RC holes were sampled on a 2m continuous basis, with dry samples riffle split on site and one quarter sent to the Andes Analytical Assay preparation laboratory in Calama and the pulps then sent to the same company laboratory in Santiago for assaying. A second quarter was stored on site for reference. Samples were prepared using the following standard protocol: drying; crushing to better than 85% passing -10#; homogenizing; splitting; pulverizing a 500-700g subsample to 95% passing -150#; and a 125g split of this sent for assaying. All samples were assayed for %CuT (total copper) and %CuS (acid soluble copper) by AAS. A full QA/QC program, involving insertion of appropriate blanks, standards and duplicates was employed with acceptable results. Pulps and sample rejects are stored by Marimaca Copper for future reference.

Qualified Person

The technical information in this news release, including the information that relates to geology, drilling and mineralization was prepared under the supervision of, or has been reviewed by Paola Kovacic, Exploration Manager, Marimaca Copper Corp, a geologist with more than 20 years of experience and a member of the Colegio de Geólogos de Chile and of the Society of Economic Geologist USA, , and who is the Qualified Person for the purposes of NI 43-101 responsible for the design and execution of the drilling program.

The QP confirms she has visited the project area, has reviewed relevant project information, is responsible for the information contained in this news release, and consents to its publication.

Contact Information

For further information please visit  or contact:

Tavistock

+44 (0) 207 920 3150

Jos Simson / Emily Moss / Nick Elwes

Forward Looking Statements

This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by Marimaca Copper, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: risks related to share price and market conditions, the inherent risks involved in the mining, exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project delays or cost overruns or unanticipated excessive operating costs and expenses, uncertainties related to the necessity of financing, the availability of and costs of financing needed in the future as well as those factors disclosed in the annual information form of the Company dated March 28, 2022, the final short form base prospectus and other filings made by the Company with the Canadian securities regulatory authorities (which may be viewed at ). Accordingly, readers should not place undue reliance on forward-looking statements. Marimaca Copper undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.

Neither the Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.



EN
07/09/2022

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Marimaca Copper

 PRESS RELEASE

Marimaca Extends Pampa Medina Norte Discovery – Intersects 68m at 1.20...

Marimaca Extends Pampa Medina Norte Discovery – Intersects 68m at 1.20% and 40m at 1.07% CuT in Dominantly Oxides with Assays Pending for Deep Sulphide Extension VANCOUVER, British Columbia, May 15, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX:MARI, ASX:MC2) is pleased to announce results of further drilling at Pampa Medina Norte, the recently discovered northern extension of the Pampa Medina Deposit. The latest result from hole SMD-01, follows news of the discovery hole - SMR-01 on December 30, 2024, which identified this northern extension of...

 PRESS RELEASE

Marimaca Defines Large Sediment and Volcanic Hosted Manto Copper Syste...

Marimaca Defines Large Sediment and Volcanic Hosted Manto Copper System across the Pampa Medina Area VANCOUVER, British Columbia, April 15, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company” (TSX: MARI) is pleased to announce results from the re-interpretation of data in the Pampa Medina Project Area (“Pampa Medina”) which incorporates the Pampa Medina and Madrugador deposits and the newly identified Pampa West oxide zone, and is located approximately 25km from the Company’s flagship Marimaca Oxide Deposit (“MOD”). The Company also announces results from f...

 PRESS RELEASE

Correction: Marimaca Commences Trading on the Australian Securities Ex...

Correction: Marimaca Commences Trading on the Australian Securities Exchange VANCOUVER, British Columbia, April 02, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca” or the “Company”) (TSX: MARI) (ASX: MC2) refers to its announcement dated March 31st, 2025 (ET) / April 1st, 2025 (AEDT) in relation to the commencement of trading on the Australian Securities Exchange (“ASX”). The Company advises that the announcement contained an error and Marimaca is not admitted to the ASX as a ‘Foreign Exempt Listing’. The Company was admitted to the official list of the ASX on March 31st 2025 ...

 PRESS RELEASE

Marimaca Commences Trading on the Australian Securities Exchange

Marimaca Commences Trading on the Australian Securities Exchange VANCOUVER, British Columbia, April 01, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca” or the “Company”) (TSX: MARI) (ASX: MC2) is pleased to announce that the Company has been admitted to the official list of the Australian Securities Exchange (“ASX”) as a Foreign Exempt Listing, on March 31st 2025 (AEDT), and that the securities of the Company will commence quotation at 13:00 (1:00pm) Australia Eastern Daylight Time (AEDT) on April 2nd 2025. Shares of the Company will trade under the ticket MC2 and will be sett...

 PRESS RELEASE

Marimaca Progresses DIA Environmental Permitting Process with Receipt ...

Marimaca Progresses DIA Environmental Permitting Process with Receipt of ICSARA VANCOUVER, British Columbia, Feb. 18, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca” or the “Company”) (TSX: MARI) is pleased to announce that following the Company’s Declaración de Impacto Ambiental (Environmental Impact Statement) (“DIA”) submission on December 27th, 2024, the Company received it’s Informe Consolidado de Solicitud de Aclaraciones, Rectificaciones y/o Ampliaciones (Consolidated Request for Clarifications, Rectifications and/or Extensions) (“ICSARA”) on February 14th, 2025. The re...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch