VANCOUVER, British Columbia, Nov. 06, 2023 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX: MARI) is pleased to announce results of the Phase 6 Metallurgical testing program (the “Phase 6 Program” or the “Program”) for the Company’s flagship Marimaca Oxide Copper Project (“the MOD” or “the Project”), located in northern Chile.

The Phase 6 program was designed to evaluate leaching conditions to optimize acid consumption, recoveries and leaching efficiency to be incorporated into the ongoing Definitive Feasibility Study (“DFS”).

Highlights

  • Comprehensive 5 column-test program evaluating the impact of curing, leaching rates and acid concentration in solution on acid consumption, recoveries and impurities generation
  • Significantly improved acid consumption based on optimization of leaching conditions
    • Net acid consumption of 30.6kg/t from experimental samples – an approximate 25% reduction from the 40.6kg/t derived from previous metallurgical campaigns
    • Provides further confidence in expected acid consumption with clear potential to enhance operating cost profile for the DFS
  • Confirms average copper recovery of 74.9% - in-line with previous results from metallurgical campaigns (Phases 1-5)
  • Flexibility for further reductions in acid consumption with relatively low recovery losses
  • Program completed with recycled sea-water sourced from Marimaca’s intended water supplier under its water option agreement to accurately reflect process water to be utilized at the Project
  • Further de-risking of the Marimaca metallurgy – allows for improved predictability of metallurgical performance during operations
    • Results will be incorporated into the final geo-metallurgical model to be utilized in the DFS which will define, at high resolution, the metallurgical performance of each ore-feed type in the DFS
  • Results demonstrate the self-regulation of impurities in the leaching cycle which allows for simple SX-EW process design and capital efficiency for the planned DFS

Hayden Locke, President and CEO of Marimaca Copper, commented:

“We are pleased with the Phase 6 metallurgical results and particularly the implications for acid consumption optimization in the DFS and in future operations.

Acid consumption is a key component of our operating costs, and fluctuations in acid price were identified as a core external factor in our projected operating margins as we move towards first copper. The results from this program show, firstly, that our base case assumptions, with respect to acid consumption, can be materially reduced via simple changes to our operational approach with no significant impact to our expected recoveries.

Secondly, the testing highlights that we have further flexibility to reduce acid consumption, with relatively small recovery losses. From my perspective, this is the most important outcome from the testing, because it allows us to make operational changes to preserve margin and cashflow during periods of high acid prices, which increases the resilience of the Project to external shocks.

“The Marimaca Project continues to demonstrate unique positioning in the copper development space. We are excited to move through the final development milestones as we rapidly advance toward first copper.”

Program Overview

Phase 6 Metallurgy comprised of a set of leaching tests in five 1m high, 6-inch diameter columns. The sample set consisted of green oxides comprised 50% brochantite/atacamite and 50% chrysocholla with a total sample size of 240kg which was crushed at P90 ½”, consistent with previous metallurgical test-work phases. The sample was subjected to separation by sieving, in the ½”, ¼”, 10 and -10 Tyler meshes, and then, from each granulometric fraction, a sample size was taken as required to form the program design cut under the standardized “cut by mono size” technique.

Process seawater used in the column tests was sourced from the counterparty to Marimaca’s water option agreement to accurately represent the industrial process water that will be used at the Marimaca operation (see Water Option press release dated November 7, 2022). The leaching conditions were focused on variables to optimize acid consumption. The two variables controlled were acid dosing in curing step, and the Leaching Ratio (m3 irrigate solution/tonne ore). The head grade of the ore, the grade of ripios resulting from leaching, the initially acidified seawater, the pregnant leaching solution (“PLS”) and the raffinate solutions were each characterized by the elements for which the evolution of impurities was monitored. The evolution of impurities was quantified by determining the concentration in the PLS solutions of the following elements: FeT, Al, Mg, Mn, Na, Cl- and SO4= and Cu. Cu was removed from the PLS solutions by solvent extraction (SX), at the end of each leaching cycle.

Column Tests

Results were evaluated from two leaching cycles over five columns. In both irrigation cycles, the tests operate in a closed circuit with a volume of irrigation solution equivalent to 10 days of operation, which, at an irrigation rate of 10 L/h/m2 is equivalent to a leaching rate of 0.93m3/to (approximately) for each cycle and 1.86 m3/t in total.

Column 1 (C-1) and Column 2 (C-2) were leached with seawater and acid in the first cycle, then the PLS obtained was treated by solvent extraction and the raffinate produced was used for the second leaching cycle. The PLS from the second cycle of each column (C-1 and C-2) was then treated by solvent extraction (SX) and both raffinate solutions produced were mixed and used as the leaching solution for Column 3 (C-3). The post-SX raffinate of the C-3 PLS was used to leach Column 4 (C-4) and similarly for C-4 to Column 5 (C-5).

Each column was agglomerated and cured under identical conditions, summarized in Table 3.

Table 1. Sample Set Mass Allocation

UsageUnitValue
Columnskg150 (5x30kg)
Head Gradekg10
Back Upkg80 (4x20kg)
 

Table 2. Particle Size Distribution of Sample Set

Granulometric

Fraction

Mass (kg)
C-1C-2C-3C-4C-5Backup
1/2"3.253.253.253.253.258.66
1/4"9.519.519.519.519.5125.37
+10 #8.628.628.628.628.6222.97
-10 #8.628.628.628.628.6222.99
TOTAL 30.030.030.030.030.080.0
 

Table 3. Agglomeration and Curing Conditions

ParameterUnitValue
Moisture (Seawater)%6
Acid Dose Curingkg/ton20
Curing Timedays3
 

Following the irrigation cycle in each column, the solution contained inside the column was allowed to drain, and the ripios were washed by passing a seawater solution at pH 3 at an irrigation rate of 10 L/h/m2 for 24 hours. The drained volume was measured and analyzed for the same elements considered in the analysis of the PLS solutions.

Following drainage of the washing stage, the ripios were unloaded from the respective columns and the wet and dry weights were recorded. A subsample equal to a quarter of the total ripios sample was sent for chemical assays following separation.

Results

Acid Consumption

Acid consumption was measured by both total acid consumption (CAB) and net acid consumption (CAN). CAN reflects acid consumed only by the gangue minerals (carbonate, aluminium, total iron, magnesium) given raffinate is recirculated with the acid consumed by copper post the SX stage. Geomet 6 was designed to evaluate the optimization of acid consumption by evaluating three variables: acid curing rate (20kg/t), acid concentration (10gpl) and leaching ratio (1.86m3/t).

Results of the column test acid consumption is presented in Figure 1. Average CAB was 36.91kg/t while average CAN was 30.63kg/t.

Figure 1. Acid Consumption – Columns 1-5



By controlling the noted variables, acid consumption can be optimized given the sequential nature of consumption by each of the gangue minerals – for example, the majority of acid consumption in the curing stage is driven by carbonate, followed by copper, aluminum, total iron and magnesium predominantly during the leaching cycle.

Copper Recovery

Table 4 and Figure 2 show the calculated head and head/ripio base copper recovery by columns. The average copper recovery of the 5 columns per head calculated was 74.9%, while the recovery per head/ripios was 73.0%. Results are in-line with expected results based on previous test-work and demonstrate that copper recovery can be maintained while optimizing the variables that reduce acid consumption and impurities generation.

Table 4. Column Recoveries

ColumnAnalyzed

Cu Head

Grade
Calculated Cu

Head Grade
Fine Cu

Analyzed

Head Grade
Copper

Leached
Copper in

Ripios
Copper

Calculated

Head
Recovery

Calculated

from Head

(R CC)
Recovery

Calculated

from Ripios

(R C/R)
(N°)(%)(%)(g)(g)(g)(g)(%)(%)
C-10.6200.568186.00122.6447.74170.472.074.3
C-20.6200.628186.00139.4749.03188.474.073.6
C-30.6200.638186.00143.6847.74191.475.174.3
C-40.6200.718186.00166.7248.83215.477.473.7
C-50.6200.815186.00186.358.05244.576.268.8
 

Figure 2. Column Recoveries



Impurities Generation

The column tests were evaluated to determine the experimental evolution of impurities generation vs. the theoretical evolution of impurities generation to determine the equilibrium point of the system. This was studied to determine the expected performance of the SX-EW plant and its ability to handle the solution generation from leaching of Marimaca ores.

Results shows that as the recirculation of leaching solution occurs, as is the case in industrial operations, the capacity of the system to dissolve impurities decreases, which indicates that the system self-regulates before any impurities mitigation is required in the SX-EW process design. In industrial terms, by feeding the heap with fresh ore, the curing acid and the leaching solutions will dissolve new impurities, but simultaneously others will precipitate in the heap, and the system will reach equilibrium.

This concept is demonstrated in Figure 3. Whereby results from Geomet 6 show the experimental sulfate concentration in each cycle deviates and plateaus relative to the theoretical sulfate concentration with the correlation coefficient of the experimental results of 0.9992. When projecting the experimental curve 3 additional cycles, it can be observed that the sulfate saturation level is approximately 147 gpl.

Table 5. Evolution of Impurities Concentration in PLS solution

ColumnFeTAl+3Mg+2    Mn+2Na+Cl- SO4=
(Nº)(g/L)(g/L)(g/L)(g/L)(g/L)(g/L)(g/L)
C-16,543,143,490,2513,1527,5546,21
C-26,183,033,210,2012,5526,6744,76
C-39,615,404,030,3713,4228,8174,98
C-413,506,995,610,5716,0531,43103,37
C-517,5210,346,800,8018,5338,16120,32
 

Figure 3. Evolution of Sulfate Concentration in PLS solution



Appendix: Chemical Characterization of Experimental Inputs

Below the chemical characterization of the head sample, the seawater input, and the leaching solution are presented.

Table 6. Chemical Characterization of Head Sample

ElementsCuT

(%)
FeT

(%)
 Al

(%)
Mg

(%)
 Mn

(%)
Na

(%)
CO3

(%)
Cl-

(%)
SO4=

(%)
Head Grade0.6417.66 6.721.05 0.073.090.630.250.15
 

Table 7. Chemical Characterization of Seawater Used

ElementCu+2

(mg/L)
 FeT

(mg/L)
Al+3

(mg/L)
Mg+2

(g/L)
Mn+2

(mg/L)
Na+

(g/L)
Cl- (g/L)SO4=

(g/L)
pH



Seawater0,00 0,901,701,44ND11,3323,212,107,60
 

Table 8. Chemical Characterization of the Initial Leaching Solution (for Columns C-1 and C-2)

 Cu+2FeTFe+2Al+3Mg+2Mn+2Na+Cl- H+pHSO4=
(mg/L)(mg/L)(mg/L)(mg/L)(g/L)(mg/L)(g/L)(g/L)(g/L) (g/L)
Leach Solution0,000,90ND1,701,44ND11,3322,109,380,759,94
 

Qualified Person

The Qualified Person for technical information in this news release is Gabriel Vera, an extractive metallurgical engineer with over 35 years of experience. Mr. Vera is a registered member of the Comision Minera (Chilean Mining Commission) and a Qualified Person for the purposes of NI 43-101.

The QP confirms they have reviewed and approved the scientific and technical information related to metallurgy in this news release.

Contact Information

For further information please visit or contact:

Tavistock

+44 (0) 207 920 3150

Gareth Tredway / Adam Baynes

Forward Looking Statements

This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by Marimaca Copper, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: risks related to share price and market conditions, the inherent risks involved in the mining, exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices, the possibility of project delays or cost overruns or unanticipated excessive operating costs and expenses, uncertainties related to the necessity of financing, uncertainties relating to regulatory procedure and timing for permitting reviews, the availability of and costs of financing needed in the future as well as those factors disclosed in the annual information form of the Company dated March 27, 2023 and other filings made by the Company with the Canadian securities regulatory authorities (which may be viewed at ). Statements regarding the Company’s planned DFS on the Project are forward-looking information and may not be realized. Readers should not place undue reliance on forward-looking statements. Marimaca Copper undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.

Neither the Toronto Stock Exchange nor the Canadian Investment Regulatory Organization accepts responsibility for the adequacy or accuracy of this release.

Photos accompanying this announcement are available at:



EN
06/11/2023

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Marimaca Copper

 PRESS RELEASE

Marimaca Announces Results of Annual General Meeting of Shareholders

Marimaca Announces Results of Annual General Meeting of Shareholders VANCOUVER, British Columbia, June 06, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (TSX: MARI) (ASX: MC2) (“Marimaca” or the “Company”) is pleased to announce the results of the votes cast by ballot at its Annual General Meeting of Shareholders held virtually via webcast on Thursday, June 5, 2025 at 10:00 a.m. (local time in Vancouver, British Columbia) (the “Meeting”). All matters submitted to shareholders for approval as set out in the Company’s Notice of Annual General Meeting of Shareholders and Information Circ...

 PRESS RELEASE

Marimaca Copper Announces Proposed US$17.7 Million Non-Brokered Privat...

Marimaca Copper Announces Proposed US$17.7 Million Non-Brokered Private Placement Not for distribution to U.S. newswire services or for dissemination in the United States. Any failure to comply with this restriction may constitute a violation of U.S. securities law. VANCOUVER, British Columbia, June 04, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca” or the “Company”) (TSX: MARI) (ASX: MC2) is pleased to announce a proposed non-brokered private placement (the “Private Placement”) of an aggregate of 5,311,416 common shares of the Company (the “Shares”) at a price of C$4.60 per ...

 PRESS RELEASE

Marimaca Extends Pampa Medina Norte Discovery – Intersects 68m at 1.20...

Marimaca Extends Pampa Medina Norte Discovery – Intersects 68m at 1.20% and 40m at 1.07% CuT in Dominantly Oxides with Assays Pending for Deep Sulphide Extension VANCOUVER, British Columbia, May 15, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company”) (TSX:MARI, ASX:MC2) is pleased to announce results of further drilling at Pampa Medina Norte, the recently discovered northern extension of the Pampa Medina Deposit. The latest result from hole SMD-01, follows news of the discovery hole - SMR-01 on December 30, 2024, which identified this northern extension of...

 PRESS RELEASE

Marimaca Defines Large Sediment and Volcanic Hosted Manto Copper Syste...

Marimaca Defines Large Sediment and Volcanic Hosted Manto Copper System across the Pampa Medina Area VANCOUVER, British Columbia, April 15, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca Copper” or the “Company” (TSX: MARI) is pleased to announce results from the re-interpretation of data in the Pampa Medina Project Area (“Pampa Medina”) which incorporates the Pampa Medina and Madrugador deposits and the newly identified Pampa West oxide zone, and is located approximately 25km from the Company’s flagship Marimaca Oxide Deposit (“MOD”). The Company also announces results from f...

 PRESS RELEASE

Correction: Marimaca Commences Trading on the Australian Securities Ex...

Correction: Marimaca Commences Trading on the Australian Securities Exchange VANCOUVER, British Columbia, April 02, 2025 (GLOBE NEWSWIRE) -- Marimaca Copper Corp. (“Marimaca” or the “Company”) (TSX: MARI) (ASX: MC2) refers to its announcement dated March 31st, 2025 (ET) / April 1st, 2025 (AEDT) in relation to the commencement of trading on the Australian Securities Exchange (“ASX”). The Company advises that the announcement contained an error and Marimaca is not admitted to the ASX as a ‘Foreign Exempt Listing’. The Company was admitted to the official list of the ASX on March 31st 2025 ...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch