PZG Paramount Gold Nevada Corp.

New High Grade Surface Samples at Paramount’s Bald Peak Prospect Align With Large, Shallow Geophysical Target

New High Grade Surface Samples at Paramount’s Bald Peak Prospect Align With Large, Shallow Geophysical Target

Surface assays up to 10.85 g/T Au may be leakage from CSAMT anomaly

WINNEMUCCA, Nev., Nov. 02, 2021 (GLOBE NEWSWIRE) -- Paramount Gold Nevada Corp. (NYSE American: PZG) (“Paramount” or the “Company”) announced today assay results from 44 new surface samples collected by the company primarily from silicic outcrops at its recently acquired Bald Peak Project (“Bald Peak”) in Mineral County, Nevada. The samples averaged 2.62 g/T gold and 4.2 g/T silver, with more than half assaying above 2 g/T gold and running as high as 10.85 g/T gold.

Paramount President and COO Glen Van Treek commented: “We are extremely excited about these results. The samples align with a large, intense CSAMT-derived resistivity anomaly about 300 feet below. Resistivity indicates silicification and we know that gold at Bald Peak is found in association with silica. It is also exceedingly rare to find these surface grades in a Nevada project which has never been drilled.”

The best surface values are clustered in close proximity to the most intense area of the geophysical anomaly which measures about 600 meters by 1,400 meters (see map below).

”These assay results suggest the potential for an open pit deposit. The alignment of surface samples and CSAMT anomalies are exactly what we were looking for when we acquired Bald Peak. This work will define our initial drill program at Bald Peak which is targeted for next year,” added Van Treek.

Several examples of the higher-grade results are listed in the table below.

Sample IDAu

(g/t)
Ag

(g/t)
Sample SourceDescription



29850210.93.7OutcropQuartz vein, strong FeOx, some quartz boxwork
2985587.95.7OutcropQuartz vein, 2' w, moderate to strong FeOx, void with secondary quartz mineralization
2985485.62.7OutcropQuartz vein outcrop, 1' w, moderate FeOx, void <2 cm with secondary quartz mineralization
2985075.510.3Outcrop10' w, minor quartz vault/stockwork, void, moderate FeOx, euhedral calcite boxwork
2985575.31.7OutcropQuartz vein, 2' w, moderate to strong FeOx, void with secondary quartz mineralization,
2985464.92.7FloatQuartz vein float, void <2cm with secondary Qtz mineralization, strong FeOx, Bx
2985454.82.2OutcropQuartz vein, 6"w, FeOx
2985014.41.7OutcropQuartz vein, 4"w, FeOx
2985533.63.0OutcropQuartz vein, 6' w, visible strata in vein, moderate to strong FeOx, void with secondary quartz mineralization, quartz boxwork, vault <2"
2985553.61.6OutcropQuartz vein, 6'w, weak to moderate FeOx, void with secondary quartz mineralization
2985523.68.7OutcropQuartz vein, strong FeOx, 7"w
2985473.54.8OutcropQuartz vein & vault, 1"w 20" l, strong FeOx, old exploration/prospecting pit, some voids with minor secondary quartz mineralization
2985603.42.5OutcropQuartz vein, 1'w, strong FeOx, some voids with FeOx and secondary quartz mineralization
2985713.216.2OutcropQuartz vein, 6'w, fault separating 2 sections of outcrop, dominant feature at outcrop, boxwork in vein and wall rock, void with secondary quartz mineralization
2985813.212.7



OutcropQuartz vein zone, 4'w, 20% silicified wall rock, strong FeOx on fractures & disseminated in wall rock
2985542.81.0FloatQuartz vein float, weak to moderate FeOx, void with secondary quartz mineralization
2985762.72.7OutcropQuartz vein outcrop and float, FeOx, void with secondary quartz mineralization
2985592.72.0



Outcrop2' Quartz Vein
2985562.50.9OutcropQuartz vein, 2'w, weak FeOx, void with secondary quartz mineralization, boxwork (euhedral calcite voids)
2985032.31.7OutcropQuartz vein in lithic tuff outcrop, 2'w, weak FeOx, void with secondary quartz mineralization, weak propylitic alteration (epidote)

Figure 1 Rock samples shown in CSAMT slice from a depth of 300 ft. to 450 ft. -

To stay informed of future press releases, subscribe to our and to learn more about our projects visit the projects section of our .

About Paramount Gold Nevada Corp.

Paramount Gold Nevada Corp. is a U.S. based precious metals exploration and development company. Paramount’s strategy is to create shareholder value through exploring and developing its mineral properties and to realize this value for its shareholders in three ways: by selling its assets to established producers; entering joint ventures with producers for construction and operation; or constructing and operating mines for its own account.

Paramount holds a 100% interest in four gold projects: Grassy Mountain; Frost; Sleeper and Bald Peak.

The Grassy Mountain Gold Project consists of approximately 8,200 acres located on private and BLM land in Malheur County, Oregon. The Grassy Mountain Gold Project contains a gold-silver deposit (100% located on private land) for which results of a positive Feasibility Study have been released and key permitting milestones accomplished.

Frost is comprised of 84 unpatented lode claims covering approximately 1,730 acres located 12 miles southwest of the Company’s proposed high-grade, underground Grassy Mountain gold mine in Malheur County, Oregon (“Grassy”). An initial drill program is ongoing.

The Sleeper Gold Project is located in Northern Nevada, the world’s premier mining jurisdiction. The Sleeper Gold Project, which includes the former producing Sleeper mine, totals 2,322 unpatented mining claims (approximately 60 square miles or 15,500 hectares). The Sleeper gold project is host to a large gold deposit (over 4 million ounces of mineralized material) and the Company has completed and released a positive Preliminary Economic Assessment. With higher gold prices, Paramount has begun work to update and improve the economics of the Sleeper project.

The newly acquired Bald Peak Project in Nevada, consists of approximately 2,260 acres.

Safe Harbor for Forward-Looking Statements

This release and related documents may include "forward-looking statements" and “forward-looking information” (collectively, “forward-looking statements”) pursuant to applicable United States and Canadian securities laws. Paramount’s future expectations, beliefs, goals, plans or prospects constitute forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and other applicable securities laws. Words such as "believes," "plans," "anticipates," "expects," "estimates" and similar expressions are intended to identify forward-looking statements, although these words may not be present in all forward-looking statements. Forward-looking statements included in this news release include, without limitation, statements with respect to the use of proceeds from the Offerings. Forward-looking statements are based on the reasonable assumptions, estimates, analyses and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. Management believes that the assumptions and expectations reflected in such forward-looking statements are reasonable. Assumptions have been made regarding, among other things: the conclusions made in the feasibility study for the Grassy Mountain Gold Project (the “FS”); the quantity and grade of resources included in resource estimates; the accuracy and achievability of projections included in the FS; Paramount’s ability to carry on exploration and development activities, including construction; the timely receipt of required approvals and permits; the price of silver, gold and other metals; prices for key mining supplies, including labor costs and consumables, remaining consistent with current expectations; work meeting expectations and being consistent with estimates and plant, equipment and processes operating as anticipated. There are a number of important factors that could cause actual results or events to differ materially from those indicated by such forward-looking statements, including, but not limited to: uncertainties involving interpretation of drilling results; environmental matters; the ability to obtain required permitting; equipment breakdown or disruptions; additional financing requirements; the completion of a definitive feasibility study for the Grassy Mountain Gold Project; discrepancies between actual and estimated mineral reserves and mineral resources, between actual and estimated development and operating costs and between estimated and actual production; the global epidemics, pandemics, or other public health crises, including the novel coronavirus (COVID-19) global health pandemic, and the spread of other viruses or pathogens and the other factors described in Paramount’s disclosures as filed with the SEC and the Ontario, British Columbia and Alberta Securities Commissions.

Except as required by applicable law, Paramount disclaims any intention or obligation to update any forward-looking statements as a result of developments occurring after the date of this document.

Paramount Gold Nevada Corp.

Rachel Goldman, Chief Executive Officer

Christos Theodossiou, Director of Corporate Communications

866-481-2233

Twitter: @ParamountNV



EN
02/11/2021

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Paramount Gold Nevada Corp.

 PRESS RELEASE

Paramount Gold Nevada Provides Details of Its Upcoming AGM

Paramount Gold Nevada Provides Details of Its Upcoming AGM WINNEMUCCA, Nev., Sept. 25, 2025 (GLOBE NEWSWIRE) -- Paramount Gold Nevada Corp. (NYSE American: PZG) (“Paramount” or the “Company”) is pleased to announce that its Annual General Meeting (“AGM” or the “meeting”) of the stockholders will be held on December 11, 2025 at 11:00 AM eastern standard time. The meeting will be held virtually over the Internet. Proxy materials will be available on or about October 30th, the mail date, at and on the . The Board of Directors has fixed the close of business on Monday, October 16, 2025, as ...

 PRESS RELEASE

BLM Releases Draft EIS for the Grassy Mountain Gold Project

BLM Releases Draft EIS for the Grassy Mountain Gold Project WINNEMUCCA, Nev., Aug. 08, 2025 (GLOBE NEWSWIRE) -- Paramount Gold Nevada Corp. (NYSE American: PZG) (“Paramount” or the “Company”) is pleased to announce that the U.S. Bureau of Land Management (“BLM”) has released its draft Environmental Impact Statement (“DEIS”) for the Company’s 100% owned Grassy Mountain gold project, located in Malheur County, Oregon. The DEIS evaluates the potential environmental impacts of the proposed mine and outlines measures to mitigate those impacts. The release of the DEIS initiates a 30-day public...

 PRESS RELEASE

Paramount Gold Receives Permit Extension from Malheur County for its P...

Paramount Gold Receives Permit Extension from Malheur County for its Proposed Grassy Mountain Underground Mine WINNEMUCCA, Nev., July 28, 2025 (GLOBE NEWSWIRE) -- Paramount Gold Nevada Corp. (NYSE American: PZG) (“Paramount” or the “Company”) announced today that it has received approval for a two-year extension of its Conditional Use Permit (CUP) and Sage Grouse Permit (SGP) during a public meeting of the Malheur County Planning Department held on July 23rd, 2025. Paramount’s CEO Rachel Goldman stated, “We appreciate the ongoing support from Malheur County as one of our key stakeholde...

Jonathan Moreland
  • Jonathan Moreland

InsiderInsights Weekly Report: July 12, 2025

InsiderInsights Ratings of Companies with Open-Market Form 4 Purchases; Sales Filed at the SEC on the date above. We separate the real investment intelligence from the noise. Saving you time, and improving your research process

 PRESS RELEASE

Bureau of Land Management Accelerates Permitting for Paramount’s High-...

Bureau of Land Management Accelerates Permitting for Paramount’s High-Grade Grassy Mountain Gold Project WINNEMUCCA, Nev., July 10, 2025 (GLOBE NEWSWIRE) -- Paramount Gold Nevada Corp. (NYSE American: PZG) (“Paramount” or the “Company”) is delighted to announce the U.S. Bureau of Land Management (‘BLM’) has advised the company that following recent changes to NEPA (), the draft Environmental Impact Statement (‘DEIS’) is now expected to be published in early August 2025. With the publication of the DEIS, an updated schedule will be posted on the BLM’s permitting dashboard at and . Followi...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch