(Figures in brackets refer to the corresponding period of 2021)

Fourth quarter 2022 EBITDA increased by 94 per cent year-over-year to USD 9.6 million (USD 4.4 million). The fleet utilization was 56.1 per cent. At period end, liquidity was USD 91.6 million (USD 73.9 million).

Operations, HSSE and backlog

  • Q4 2022 utilisation of 56.1 (59.3) per cent, five out of seven vessels in operation during the quarter
  • Full year utilization of 70.6 per cent, highest since 2014
  • Good operating and HSSE performance on all vessels
  • Backlog of USD 332 million (USD 126 million) at quarter end
  • Signed 650-day Petrobras contract valued at USD 73 million, commencing in May 2023

Q4 financials

  • Revenue of USD 38.9 million (USD 29.4 million) and EBITDA of USD 9.6 million (USD 4.4 million)
  • Earnings increase compared to Q4 2021 driven by higher day rates
  • Cash flow from operations of USD 24.7 million (USD 36.0 million), positively impacted in the quarter by improved working capital as vessels came off contract
  • Liquidity of USD 91.6 million (USD 73.9 million) at quarter end

Market and outlook

  • Strong improvement in demand and utilisation during 2022. Market utilisation for the most advanced accommodation vessels increased from 30 to 80 per cent in the past year
  • Slower 2023 North Sea market expected. This combined with capex and mobilization spend in preparation for new contracts in Brazil and US GoM will negatively impact liquidity during 2023
  • Favourable demand outlook in core markets, with an all-time high number of new PDOs in Norway and multiple FPSOs expected to come on stream in Brazil over the next years
  • Increased tender activity expected based on ongoing client discussions for 2024 and beyond

CEO comment

“We had high operational activity in the fourth quarter. Safe Boreas, Safe Caledonia and Safe Zephyrus all completed their contracts during the period and were safely demobilised. Backlog increased further as we finalised the 650-day contract for Safe Zephyrus in Brazil,” says Jesper K. Andresen, CEO of Prosafe.

“We believe that 2023 will be weak in the North Sea with limited prospects for Safe Caledonia and Safe Boreas. In contrast, we see increasing activity in 2024 and beyond. Based on discussion with clients, we expect several additional tenders in the North Sea and Brazil for 2024 in the coming months. For the longer term, the company remains optimistic on the outlook and sees significant potential for market tightening and increasing day rates.”

Presentation





Jesper Kragh Andresen, CEO and Reese McNeel, CFO will today at 10:00 a.m. CET present the results at the Hotel Continental, Stortingsgata 24/26, Oslo. The presentation is open to the public and can also be followed live via web streaming at

It will be possible to ask questions during the presentation by using the Q&A tool embedded in the webcast. These questions will be answered after the presentation. A replay of the audiocast will be made available on Prosafe’s website shortly after.

A complete version of the Q4 2022 earnings release and the Q4 2022 presentation is attached and can be downloaded from and

Prosafe is a leading owner and operator of semi-submersible accommodation vessels. The company is listed on the Oslo Stock Exchange with ticker code PRS. For more information, please refer to

Stavanger, 28 February 2022

Prosafe SE

For further information, please contact:

Jesper K. Andresen, CEO

Phone: /

Reese McNeel, CFO

Phone: / +47 415 08 186

This information is subject to the disclosure requirements pursuant to Section 5-12 the Norwegian Securities Trading Act.

Attachments



EN
28/02/2023

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Prosafe

 PRESS RELEASE

Prosafe SE: Operational update – February 2026

Prosafe SE: Operational update – February 2026 23 March 2026 - Fleet utilisation for February 2026 was 96%.   In Brazil, Safe Eurus, Safe Notos, and Safe Zephyrus continued to operate at full capacity in January, delivering near 100 % commercial uptime. In early-March, Safe Zephyrus and Safe Notos both commenced scheduled special periodic surveys (SPS), upgrade and maintenance work.  Safe Boreas continued to receive full day rate, awaiting commencement of the 15-month firm period upon gangway connection, which is delayed and expected now during the second quarter.   Safe Caledonia had 7...

 PRESS RELEASE

Prosafe SE: Grants of Restricted Stock Units

Prosafe SE: Grants of Restricted Stock Units Oslo, Norway, 16 March 2026 Prosafe SE announces the award of Restricted Share Units ("RSUs") and notification of awards of RSUs to primary insiders. The board of directors in the Company resolved, on 28 September 2025, to establish a long-term incentive program for the Company's senior executives and key personnel based on the granting of restricted stock units to the participants. The Annual General Meeting held on 21 May 2025 resolved to issue restricted, share based compensation to board members. The Board has therefore resolved to include ...

 PRESS RELEASE

Prosafe SE: Shareholding disclosure

Prosafe SE: Shareholding disclosure 03 March 2026 following the sale of shares, Burlington Loan Management DAC owns in total 35,253,797 shares in the Company, representing 10% of the total 352,537,966 outstanding shares and votes in the Company, thereby crossing the 10% disclosure threshold in the Norwegian Securities Trading Act Section 4.2. The previous filing was made on 13th November 2025, when Burlington Loan Management DAC owned 52,880,695 shares in the Company, representing approximately 15% of the total 352,537,966 outstanding shares and votes in the Company.  This information is s...

 PRESS RELEASE

Prosafe SE: Fourth-quarter results 2025

Prosafe SE: Fourth-quarter results 2025 This release contains forward-looking statements based on current assumptions and forecasts made by the Group. Various known and unknown risks, uncertainties and other factors could lead to material differences between the actual future results, financial situation, development or performance of the Group and the estimates given here. (Figures in brackets refer to the corresponding period last year1) 26 February 2026 – Prosafe SE reported EBITDA of USD 21.1 million (USD 8.4 million) for the fourth quarter of 2025. All the company’s five vessels gene...

 PRESS RELEASE

Prosafe SE: Operational update – January 2026

Prosafe SE: Operational update – January 2026 24 February 2026 - Fleet utilisation for January 2026 was 100%.   In Brazil, Safe Eurus, Safe Notos, and Safe Zephyrus continued to operate at full capacity in January, delivering near 100 % commercial uptime.  Safe Caledonia maintained 100% commercial uptime at the Captain Field in the UK. The vessel ended the contract for Ithaca Energy on 22 February 2026 following the exercise of all option periods. The vessel has a Letter of Intent (LoI) from Ithaca Energy for 6 months firm and 3 months of options from the second quarter of 2027.   Safe ...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch