CAPT Capitan Mining

Capitan Mining Drills 58 Meters of 0.94 g/t Gold Equivalent; Including 18.3 Meters of 2.04 g/t Gold Equivalent, at Penoles Project in Durango, Mexico

Vancouver, British Columbia--(Newsfile Corp. - January 11, 2021) - Capitan Mining Inc. (TSXV: CAPT) ("Capitan" or the "Company") is pleased to report results for five drill holes.

Release Highlights:

  • 20-CARC-11 intersected 57.9 m of 0.94 g/t AuEq including 18.3 m of 2.04 g/t AuEq.
  • 20-CARC-13 intersected 100.6 m of 0.42 g/t AuEq including 21.3 m of 0.67 AuEq.
  • New drilling has confirmed that Capitan Hill gold mineralization continues along strike to the east, over 250 m beyond the 2015 43-101 resource and remains open to expansion to the east, west and down-dip.
  • Drill Holes Pending: 20-CARC-16 and 20-CARC-17.
  • Drilling to recommence on January 11th, 2021.

Program Description

The five drill holes reported herein targeted the western and eastern limits of the Capitan Main zone, where there was limited knowledge of continuity and grade as historic drilling was sparse in these areas. The purpose of these holes was to confirm the potential to expand Capitan Hill mineralization within these areas, as well as investigate the undrilled potential along strike.

Capitan's CEO, Alberto Orozco, stated: "The current drill program has continued to confirm our thesis that there is excellent potential to expand the size of the known resource at Capitan Hill. Results from the ongoing program continue to show wide intercepts of mineralization coincident with deep zones of oxidation, both down-dip of known gold zones, and also within areas of sparse, historic drilling along strike. We are excited to see that gold and silver mineralization continues to expand and remains open in all directions. This is indicative of how premature the maiden resource was for this project."

Western Extension

Hole 20-CARC-13 was drilled on section -500, 70 m from of the western limits of the Capitan main zone. Historic drilling located up-dip (CDDH-12-21) intersected typical Capitan Hill style mineralization, but to the west, historic drilling indicated the zone was somewhat narrower and weaker. Hole 20-CARC-13, which returned 100.6 m of 0.42 g/t AuEq, illustrates that this may be a local, weak area in the Capitan main zone, and that drilling on the section to the west was located just above of the main plunge of Capitan Hill zone. Further drilling will be planned to investigate the western extension of the Capitan main zone and to further investigate the undrilled potential beyond the current drilling limits.

Eastern Extension

Hole 20-CARC-11 was designed to test the down-dip/down plunge extension of the Capitan main zone from holes 20-CARC-01 and 12, both of which returned strong drill results including 51.8 m of 0.46 g/t AuEq and 73.15 m of 0.63 g/t AuEq respectively. The hole cut the main Capitan zone starting from 53 m and was present in 6 distinct gold zones ranging in width from 9.1 to 57.9 m, with the best intersection returning 57.9 m of 0.94 g/t AuEq (including 18.3 m of 2.04 g/t AuEq) and successfully extending the main Capitan zone between 85 to 105 m downdip from hole 20-CARC-01. Hole 20-CARC-11 ended prematurely in mineralization due to technical challenges.

Holes 20-CARC-10, 14 and 15 were drilled within the eastern most portion of the Capitan main zone, where historical drilling was generally widely spaced, targeting the zone close to surface.

Hole 20-CARC-10 on section 000 was a step-out hole that successfully extended the Capitan Hill zone between 45-65 m down-dip, intersecting 3 distinct zones, the most significant being 64 m of 0.27 g/t AuEq and 45.7 m of 0.31 g/t AuEq (including 4.6 m of 1.41 g/t AuEq).

Hole 20-CARC 14 drilled on section 100 was an infill hole that was designed to test a 100 m gap between historic core holes CDDH-11-12 and CDDH-11-08. The hole successfully intersected the Capitan Hill zone in two intervals, with the most significant returning 25.9 m of 0.36 g/t AuEq (including 12.2 m of 0.48 g/t AuEq).

Hole 20-CARC-15 drilled on section 300 was a step-out hole to designed to test the down-dip extension below historic core hole CDDH-11-03. The hole intersected 5 separate zones of Capitan hill style mineralization, ranging in width from 7.6 to 38.1 m, and returned generally low grades, the most significant being 16.8 m of 0.24 g/t AuEq. This hole successfully extended the main Capitan Hill zone between 50 and 85 m down-dip.



Figure 1: Map of Capitan Mining Fall/Winter 2020 Drill Program

To view an enhanced version of Figure 1, please visit:



00 Cross Section

To view an enhanced version of this map, please visit:



100 Cross Section

To view an enhanced version of this map, please visit:

Table 1. Table of Drill Results

Hole NameAz.DipSectionZoneFrom
(m)
To
(m)
Interval
(m)
AuEq
(g/t)
Au
(g/t)
Ag
(g/t)
OX-SUL
20-CARC-10
Interval2870°000Hanging Wall36.6100.664.00.270.260.39OX
Interval


Hanging Wall105.2150.945.70.310.300.61OX
including


Hanging Wall144.8149.44.61.411.391.70OX
Interval


Capitan Main166.1213.447.20.240.202.62
including


Capitan Main166.1181.415.20.190.170.89OX
and including


Capitan Main181.4213.432.00.260.223.44SUL
20-CARC-11
Interval2850°-100Hanging Wall53.364.010.70.170.17NSVOX
Interval


Hanging Wall73.2102.129.00.150.15NSVOX
Interval


Hanging Wall112.8125.012.20.180.18NSVOX
Interval


Hanging Wall135.6147.812.20.210.21NSVOX
Interval


Hanging Wall163.1172.29.10.340.34NSVOX
Interval


Capitan Main192.0249.957.90.940.884.15
including


Capitan Main192.0231.639.61.211.154.38OX
and including


Capitan Main196.6225.629.01.541.484.96OX
and including


Capitan Main196.6214.918.32.041.994.12OX
and including


Capitan Main231.6249.918.30.350.313.67SUL
20-CARC-13
Interval36090°-500Capitan Main85.3185.9100.60.420.328.15
including


Capitan Main131.1152.421.30.670.5211.67OX
and including


Capitan Main182.9185.93.00.230.174.70SUL
20-CARC-14
Interval1560°100Hanging Wall30.550.319.80.130.13NSVOX
Interval


Capitan Main94.5120.425.90.360.314.41
including


Capitan Main108.2120.412.20.480.368.84SUL
20-CARC-15
Interval2865°300Hanging Wall21.329.07.60.160.16NSVOX
Interval


Hanging Wall50.361.010.70.180.18NSVOX
Interval


Hanging Wall108.2121.913.70.190.19NSVOX
Interval


Hanging Wall128.0166.138.10.180.18NSVOX
Interval


Capitan Main204.2221.016.80.240.221.83OX

 

Note: True widths range between 70-95% of the reported drill intersections.
* Gold equivalent calculated at 80:1 ratio
** No significant values

Qualified Person & QA/QC:

The scientific and technical data contained in this news release pertaining to the Peñoles Project was reviewed and approved by Marc Idziszek, P.Geo, a non-independent qualified person to Capitan Mining, who is responsible for ensuring that the technical information provided in this news release is accurate and who acts as a "qualified person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

Capitan Mining Inc. has a Quality Assurance/Quality Control program that includes insertion and verification of control samples including standard reference material, blanks and duplicates consistent with industry standards.

RC drill samples from the Peñoles Project are collected and split at the drill site using a Gilson Universal Splitter. The samples are stored in either plastic bags (dry) or micropore bags (wet) and secured with plastic zip-ties and then transported to the preparation laboratory of Bureau Veritas in Hermosillo, Sonora. The sample pulps are then transported to the Bureau Veritas' laboratory in Vancouver, where they are assayed for gold by fire assay with atomic absorption finish (FA430 assay method code; 0.005 to 10 ppm detection limit). Samples over 10 ppm Au are assayed with gravimetric finish (Assay code FA530). All samples are also assayed by ICP-ES (code AQ300) for a suite of 33 elements.

All summarized intervals reported in this press release were calculated using a 0.10 ppm Au cut-off grade. Intervals contain no more than 3 metres of internal dilution. High grades have not been capped.

About Capitan Mining Inc.:

Capitan Mining is a well-funded junior exploration company focused on its 100% owned gold and silver Peñoles Project in Durango, Mexico. The company is led by a management team that has successfully advanced and developed several heap leach operations in Mexico over the past 16 years. More information for the Company can be found at .

ON BEHALF OF CAPITAN MINING INC.

"Alberto Orozco"

Alberto Orozco, CEO

For additional information contact:

Alberto Orozco
CEO
Capitan Mining Inc.

Phone: (778) 327-6671
Fax: (778) 327-6675
Web:

Raffi Elmajian
Corporate Communications
Capitan Mining Inc.

Phone: (604) 358-2601
Web:

Certain statements in this press release may be considered forward-looking information. These statements can be identified by the use of forward-looking terminology (e.g., "expect"," estimates", "intends", "anticipates", "believes", "plans"). Such information involves known and unknown risks -- including the availability of funds, the results of financing and exploration activities, the interpretation of exploration results and other geological data, or unanticipated costs and expenses and other risks identified by Capitan in its public securities filings that may cause actual events to differ materially from current expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit

EN
11/01/2021

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Capitan Mining

 PRESS RELEASE

Michael Gentile, CFA Announces Filing of Early Warning Report Related ...

Toronto, Ontario--(Newsfile Corp. - March 14, 2022) - Michael Gentile announces that he has filed an early warning report (the "Report") announcing the acquisition ("Acquisition") of 487,500 common shares ("Shares") in the capital of Capitan Mining Inc. ("Capitan Mining").Prior to the completion of the Acquisition, Gentile beneficially owned and controlled, directly or indirectly, an aggregate of 9,158,500 Shares, representing approximately 17.02% of the Company's issued and outstanding Common Shares on an undiluted and partially diluted basis. Following the completion of the Acquisition, Mr....

 PRESS RELEASE

Capitan Mining Drills 56.4m of 0.75 g/t AuEq Including 10.7m of 1.19 g...

Vancouver, British Columbia--(Newsfile Corp. - July 7, 2021) - Capitan Mining Inc. (TSXV: CAPT) ("Capitan" or the "Company") is pleased to report results for four reverse-circulation (RC) drill holes from the Capitan oxide-gold deposit, at its 100%-owned Peñoles project in Durango, Mexico.Highlights:Hole 21-CARC-33 returned 56.4m at 0.75 g/t Aueq, including a higher-grade interval of 10.7m grading 1.19 g/t AueqHole 21-CARC-31 returned a higher-grade interval of 29m at 0.55 g/t Aueq from the Capitan Main Zone which was within a continuous interval of 187.5m at 0.24g/t Aueq All holes reported he...

 PRESS RELEASE

Capitan Mining Announces Drill Results from Peñoles Project: Expands G...

Vancouver, British Columbia--(Newsfile Corp. - May 20, 2021) - Capitan Mining Inc. (TSXV: CAPT) ("Capitan" or the "Company") is pleased to report results from eight drill holes from its 2021 program on the Capitan gold zone.Highlights:Hole 21-CARC-24 returned 10.7m @ 0.56 g/t Aueq within a larger interval of 42.7m @ 0.34 g/t AueqAll reported drill holes herein returned Capitan style mineralization, over significant width'sTo date the Capitan gold zone has been traced for 1.2 kilometres along strike and up to 450 metres down-dip and remains open in all directions except to the north.These drill...

 PRESS RELEASE

Michael Gentile, CFA Announces Filing of Early Warning Report Related ...

Toronto, Ontario--(Newsfile Corp. - May 10, 2021) - Michael Gentile announces that he has filed an early warning report (the "Report") announcing the acquisition ("Acquisition") of 8,000,000 common shares ("Shares") in the capital of Capitan Mining Inc. ("Capitan Mining"). Prior to the completion of the Acquisition, Mr. Gentile beneficially owned and controlled, directly or indirectly, an aggregate of 1,158,500 Shares, representing approximately 3.07% of Capitan Mining's issued and outstanding Shares on an undiluted and partially diluted basis. Following the completion of the Acquisition, Mr....

 PRESS RELEASE

Capitan Mining Inc. Announces the Successful Closing of a $3.2 Million...

Vancouver, British Columbia--(Newsfile Corp. - May 7, 2021) - Capitan Mining Inc. (TSXV: CAPT) ("Capitan" or the "Company"), is pleased to announce that it has closed its non-brokered equity financing previously announced on April 6, 2021 (the "Private Placement"). Pursuant to the Private Placement, Capitan issued 16,000,000 common shares at a price of C$0.20 per Common Share (the "Issue Price") for gross proceeds of C$3,200,000. There were no finders' fees paid on the Private Placement.The proceeds received by the Company will be primarily used to advance exploration and corporate development...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch