2J1A Minnova Corp

Minnova Corp. - 101.6 g/t Au Assay Results Associated with Visible Gold Discovered in Biggest Step-Out Drill Hole in History of PL Mine

Toronto, Ontario--(Newsfile Corp. - May 27, 2021) - Minnova Corp. (TSXV: MCI) (OTC Pink: AGRDF) ("Minnova" or the "Company"), a discovery-stage exploration and advanced development-stage gold company focused on the expansion and restart of our 100% owned PL Gold Mine in central Manitoba is pleased to announce recent assay results and on-site activities.

Following a detailed review and compilation of the Winter 2021 drill program the Company's technical team planned a 642 meter follow-up drill program consisting of 4 holes targeting: a) a south east trending mineralized vector on the main PL Deposit, b) shallow infill holes on the PL North Upper and Lower Zones to define mineralized structures in advance of planned open pit / bulk sample and c) a deeper, down dip hole to test the PL North mineralized trend at depth.

The Company announced that Visible Gold had been intersected in DDH M-21-048x on April 20, 2021 (see link to press release: ). Assay results confirmed a bonanza gold grade of 101.6 g/t over 0.50 meter interval with a weighted average grade of 51.95 g/t over the 1 meter mineralized structure. The significance of the intercept is twofold:

  • It is the biggest step-out hole in the history of the project highlighting the down-dip and on-strike resource expansion and exploration potential of the PL property (see Figure 1).

  • This intercept is the 6th highest grade assay in the history of the PL Deposit and highlights the potential for extremely high gold grades to occur in the mineralized structures that make up the PL Deposit and the evolving PL North target area ("PLN").

Other positive assay results were returned from shallow drilling on PL North Upper Zone. These include 2.95 g/t over 1.75 meters starting at a depth of 2.5 meters in DDH M-21-082 and 1.02 g/t over 3.5 meters starting at a depth of 17.0 meters in DDH M-21-083. Near surface gold mineralization on the PL North Upper Zone is being evaluated for future development, initially as an open pit / bulk sample that would ultimately be developed into a new northern portal. A second decline will provide more direct access to PL Deposit reserves (see Note 1) targeted for initial development and optimize future underground mining operations. The benefits of a new northern decline were previously highlighted in the April 20, 2021 press release noted above.

PL North Lower Zone continues to evolve as a mappable mineralized structure. The presence of high-grade assays between the PL North upper and lower zones are interpreted as higher order shear zones and possibly conjugate shear zones that link the two main mineralized structures at PL North. In addition to these subsidiary mineralized zones, gold-bearing quartz veins are consistently intersected at depth within the footwall tonalite, below the PL North Lower Zone (see link to press release where new Tonalite hosted mineralized structures were originally highlighted: ). These recently identified mineralized structures are interpreted to be the strike-extension of discontinuous, tonalite-hosted mineralized structures in the footwall of the PL Deposit, historically referred to as the Lower Lower Zone.

The Location of DDH M-21-048x and other PL North Target drilling, relative to the PL Mill and main PL Deposit is highlighted in Figure 1.

Figure 1: Location Map Highlighting Spring 2021 Drilling and PL Deposit Resource Model (Note 1)

To view an enhanced version of this graphic, please visit:

Gorden Glenn President & CEO commented: "We are pleased that assay results have confirmed bonanza grades associated with the visible gold observed in step-out hole M-21-048x. The exceptional grade and location of this intercept confirm the on-strike exploration and resource expansion potential that exists at the PL Mine. Further drilling is warranted to infill drill a large untested area underlying the PL mill.

We are currently active onsite planning work programs for additional drilling (step-out drilling and infill drilling). While on site we are also hosting local contractors and service providers to update our mine development and mill refurbishment cost estimates. All site visitors have commented on the sites clean and safe working condition (see Photo 1 below). This is a positive reflection on our management, site personnel, contractors and shareholders and we are always pleased to present our project to interested parties."

Table 1: Selected Assay Results (>2.00gpt) from the Spring 2021 PL Mine Drill Program

Hole Location Target ZoneFrom (m) To (m) Length(m) Au gpt
M-21-048x373092E/6101499NPLN Upper Zone208.00209.001.0051.95
including208.00208.500.50101.60
M-21-082373997E/6100922NPLN Upper Zone2.504.251.752.95
including2.503.000.502.57
3.003.500.502.85
3.504.250.753.26
PLN Intermediate Zone45.5048.943.441.48
including45.5046.501.002.26
48.4048.940.544.60
PLN Lower Zone65.0066.921.922.91
including65.0066.001.004.77
M-21-083372971E/6100982NPLN Upper Zone17.0020.503.501.02
including17.0017.850.851.82
19.0019.500.501.06
19.5020.501.001.17
PLN Lower Zone79.5080.000.502.47
PLN Deep Zone100.78102.902.122.67
including100.78101.140.362.06
101.14102.000.860.21
102.00102.900.905.25
M-21-081373960E/6099965NPLD Main ZoneNo significant results

 
Note 1: Nokomis NI 43-101 mineral resource estimate was prepared by Leon McGarry, B.Sc., P.Geo., of CSA Global Pty Ltd., and is contained in the Technical Report entitled Feasibility Study, PL Gold Project, Manitoba, Canada filed on SEDAR on May 4, 2018.

Photo 1: PL Mine Site May 2021 Current Condition (left photo of north side of mill and right photo of south side of the mill)

To view an enhanced version of this graphic, please visit:

The Company will provide further progress updates as internal studies and site work advances during the summer of 2021 and over the remainder of the year.

About Minnova Corp.

Minnova Corp. is an emerging Canadian gold producer focused on restarting the PL Gold Mine and expanding gold resources on its PL and Nokomis gold deposits. The Company has completed a Positive Feasibility Study in support of restarting the PL Mine at an average annual production rate of 46,493 ounces over a minimum 5 year mine life. The resource remains open to expansion and future surface exploration work programs will target resource expansion. The PL Gold Mine has a relatively short pre-production timeline forecast at 15 months, benefits from a valid underground mining permit (Environment Act 1207E), an existing 1000 tpd processing plant, over 7,000 meters of developed underground ramp to -135 metres depth, is fully road accessible and close to existing mining infrastructure in the prolific Flin Flon Greenstone Belt of Central Manitoba.

Qualified Person

Mr. Chris Buchanan, M. Sc., P. Geo., a consultant of the Company and a "Qualified Person" under National Instrument 43-101, has reviewed and approved the scientific and technical information in this press release.

For more information please contact:

Minnova Corp.
Gorden Glenn
President & Chief Executive Officer

For further information, please contact Investor Relations at 647-985-2785 or

Visit our website at

Forward Looking Statements

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, information regarding the Company including management's assessment of future plans and operations, that may involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward looking statements. A feasibility study has not been completed and there is no certainty the disclosed targets will be achieved nor that the proposed operations will be economically viable. Although Minnova has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. Minnova does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

NOT FOR DISSEMINATION INTO THE UNITED STATES

To view the source version of this press release, please visit

EN
27/05/2021

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Minnova Corp

 PRESS RELEASE

Minnova Announces Acquisition of 50% of Duma Engineering, Waste to Ene...

Toronto, Ontario--(Newsfile Corp. - October 13, 2022) -  Minnova Corp. (TSXV: MCI) (OTC Pink: AGRDF) ("Minnova" or the "Company") an evolving gold development and green energy company is pleased to announce the following positive developments:Completed the initial acquisition of 50% interest in Duma Engineering (2018) Inc.Our 3rd generation biomass gasification technology was recognized by the Ontario Sustainable Energy Organization ("OSEA") for waste to energy innovation in their GEDO 2022 Best-in-Class CleanTech Awards.Advancing discussions for forest waste supply and power generation in Sou...

 PRESS RELEASE

Minnova Corp. and Minnova Renewable Energy Announce Positive Velocimet...

Toronto, Ontario--(Newsfile Corp. - July 13, 2022) - Minnova Corp. (TSXV: MCI) (OTC Pink: AGRDF) ("Minnova" or the "Company"), is an evolving resource development company with an exciting green hydrogen and cleantech innovation strategy to compliment our development-stage PL Gold Mine restart plan.Positive Particle Velocimetry Test ResultsWe are pleased to announce positive particle tracking velocimetry results of the DUMA technology. The tests were conducted by University of L'Aquila (Italy) and support the development of our planned demonstration plant in Swan River, Manitoba (see press rele...

 PRESS RELEASE

Minnova Corp. Announces Non-Brokered Private Placement

Toronto, Ontario--(Newsfile Corp. - May 31, 2022) - Minnova Corp. (TSXV: MCI) (OTC Pink: AGRDF) ("Minnova" or the "Company") is pleased to announce a non-brokered private placement of up to 10,000,00 units (each, a "Unit") at a price of $0.05 per Unit for aggregate gross proceeds of up to $500,000 (the "Offering"). Each Unit shall be comprised of one common share (each, a "Common Share") in the capital of the Company and one-half of one whole Common Share purchase warrant (each whole warrant, a "Warrant") of the Company. Each Warrant shall entitle the holder thereof to acquire one common share...

 PRESS RELEASE

Minnova Corp. and Minnova Renewable Energy Update on Green Hydrogen Pr...

Toronto, Ontario--(Newsfile Corp. - February 15, 2022) - Minnova Corp. (TSXV: MCI) (OTC Pink: AGRDF) ("Minnova" or the "Company"), is an evolving resource development company with an exciting green hydrogen and cleantech innovation strategy to compliment our development-stage PL Gold Mine restart plan. We are pleased to provide an update on ongoing design and testing of a new generation of gasification technology by DUMA Engineering (2018) Inc. ("DUMA") in collaboration with leading European Institutes that is capable of producing higher hydrogen content and tar free syngas than existing techn...

 PRESS RELEASE

Minnova Corp. Announces Closing of Private Placement

Toronto, Ontario--(Newsfile Corp. - December 30, 2021) - Minnova Corp. (TSXV: MCI) (OTC Pink: AGRDF) ("Minnova" or the "Company"), is pleased to announce it has closed non-brokered private placement through the issuance of 2,307,692 common shares (the "FT Shares") in the capital of the Company, issued of a flow-through basis at a price of $0.13 per FT Share for gross proceeds of $299,999.96 (the "Offering"). All securities issued pursuant to the Offering will be subject to a hold period of four months plus a day from the date of issuance and the resale rules of applicable securities legislati...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch