TUD TUDOR GOLD CORP.

Tudor Gold Continues to Significantly Expand the Goldstorm Deposit to the Northeast as Step-Out Hole GS-23-170 Intersects 1.48 g/t AuEQ over 210 m Within 516 m Grading 1.19 g/t AuEQ, Outside the Goldstorm Deposit Mineral Resource Area

Vancouver, British Columbia--(Newsfile Corp. - August 15, 2023) - Tudor Gold Corp. (TSXV: TUD) (FSE: H56) (the "Company" or "Tudor Gold") is pleased to present the second set of drill results for the 2023 exploration program (the "Program") at their flagship property, Treaty Creek, located in the heart of the Golden Triangle of Northwestern British Columbia.

Since the beginning of this year's Program, the Company has successfully completed over 21,000 meters (m) of drilling, within areas encompassing the Goldstorm Deposit and the Perfectstorm Zone. The five drill holes reported in this release are located in the northeastern area of the Goldstorm Deposit. Click to view .

Ken Konkin, President and CEO, comments: "We are very pleased to confirm the continued expansion of the Goldstorm Deposit to the northeast. Results from our northeastern-most step-out drilling from section 120+50 NE will certainly expand the volume of the deposit with AuEQ values well above the 0.7 gpt AuEQ underground resource estimate cut-off grade used for our deposit. In addition, very large blocks within the previously estimated drill inferred category have been successfully intersected with very positive gold, copper and silver grades, which we believe will convert these blocks of mineralization into the drill Indicated category. Our goal is to increase the size of the resource without diminishing the grade. This will be a critical component to the Preliminary Economic Assessment (PEA) that we plan to complete once we have totally defined the Goldstorm Deposit. We have completed five additional drill holes on the Goldstorm Deposit and three drill holes at the Perfectstorm target, which are currently in the lab. Results will be announced once they are received and compiled. Crews have begun construction of drill pads required to pursue the northern aspects of the CS-600, 300H and DS5 domains for the 2024 drill program; these are beyond the scope and the time available to drill within our planned 2023 program. Defining the shape and extent of each domain is necessary prior to determining a mine plan, which is essential for the PEA level and beyond."

SECTION 117+50NE

  • GS-23-166-W1: This hole targeted the northern aspects of the CS-600 and DS5 Domains of the Goldstorm Deposit. The hole first intersected the northern aspect of the CS-600 Domain in an area that was classified as Inferred in the April 2023 Mineral Resource Estimate (MRE). The hole then successfully intersected DS5 Domain mineralization at approximately 115 m outside and to the northwest of the previous DS5 Domain boundary. Highlights include 153 m grading 1.29 g/t AuEQ (0.75 g/t Au, 14.02 g/t Ag, 0.33 % Cu) with a 1.8 m intercept of 5.18 g/t AuEQ (1.37 g/t Au, 374.0 g/t Ag, 0.09 % Cu). Several mineralized zones were encountered throughout the DS5 Domain, including 45.0 m grading 1.09 g/t AuEQ (1.02 g/t Au, 5.14 g/t Ag, 0.02 % Cu).
  • GS-23-168-W1: This hole targeted the deep, northwest portion of the CS-600 Domain. The hole intersected an area classified as Inferred in the previous MRE. Prior to entering the CS-600, a mineralized section of 75.0 m of 1.34 g/t AuEQ (1.27 g/t Au, 5.89 g/t Ag, 0.01 % Cu) was cut, and this is interpreted to be the 300H Domain. A long intercept of CS-600 included 296.0 m of 1.11 g/t AuEQ (0.65 g/t Au, 5.03 g/t Ag, 0.35 % Cu) with an enriched intercept of 102.0 m grading 1.30 g/t AuEQ (0.64 g/t Au, 7.39 g/t Ag, 0.50 % Cu).
  • GS-23-166: This hole was not sampled and shutdown early due to excessive drill hole deviation. The hole was wedged and drilled as GS-23-166-W1.

SECTION 120+50NE

  • GS-23-169: This hole was drilled outside of the resource area, and at a distance of 160 m northeast of the previous boundary, CS-600 was encountered, with a 190.5 m interval of 0.79 g/t AuEQ (0.38 g/t Au, 5.58 g/t Ag, 0.30 % Cu) and an enriched section of 66.0 m grading 1.44 g/t AuEQ (0.79 g/t Au, 8.45 g/t Ag, 0.47 % Cu). At depth, the DS5 Domain was intersected at a step-out distance of 300 m to the north from the previously defined resource area. An intercept of 133.5 m grading 0.97 g/t AuEQ (0.89 g/t Au, 5.55 g/t Ag, 0.02 % Cu) was reported.
  • GS-23-170: This hole was designed to expand the northern extent of the CS-600 Domain. An intercept of 516.0 m grading 1.19 g/t AuEQ (0.89 g/t Au, 2.86 g/t Ag, 0.23 % Cu) was encountered. This intercept represents a wider than expected interval of mineralization within the northern aspect of the CS-600 Domain. An enriched section measured 90.0 m grading 2.07 g/t AuEQ (1.93 g/t Au, 3.55 g/t Ag, 0.09 % Cu).

Table 1: Drilling Results for Goldstorm Deposit in Press Release August 15, 2023

SectionHoleZoneFrom
(m)
To (m)Interval
(m)
Au (g/t)Ag (g/t)Cu (%)AuEQ
(g/t)
117+50NEGS-22-166Hole abandoned, not sampled
117+50NEGS-23-166-W1CS600430.50583.50153.000.7514.020.331.29
inc.559.50561.301.801.37374.000.095.18
DS5784.50856.5072.000.582.350.010.61
and940.50985.5045.001.025.140.021.09
and1039.501108.5069.000.711.7800.74
117+50NEGS-23-168-W1300H1.5076.5075.001.275.890.011.34
CS600912.001208.00296.000.655.030.351.11
inc.933.00985.5052.500.933.300.401.43
inc.1098.001200.00102.000.647.390.501.30
120+50NEGS-23-169CS600801.00991.50190.500.385.580.300.79
Inc.880.50991.50111.000.628.110.371.13
inc.903.00969.0066.000.798.450.471.44
DS51162.501296.00133.500.895.550.020.97
inc.1162.501221.0058.501.2711.180.031.41
120+50NEGS-23-170CS600937.501453.50516.000.892.860.231.19
inc.1005.001215.00210.001.233.170.181.48
inc.1005.001095.0090.001.933.550.092.07

 

  • All assay values are uncut and intervals reflect drilled intercept lengths.
  • HQ and NQ2 diameter core samples were sawn in half and typically sampled at standard 1.5m intervals.
  • The following metal prices were used to calculate the Au Eq metal content: Gold $1800/oz, Ag: $20/oz, Cu: $3.5/lb. Calculations used the formula AuEQ = Au g/t + (Ag g/t*0.0098765) + (Cu ppm*0.0001185). All metals are reported in USD and calculations consider recoveries of 90 % for gold, 80 % for copper, and 80 % for silver.
  • True widths have not been determined as the mineralized body remains open in all directions. Further drilling is required to determine the mineralized body orientation and true widths.

Table 2: Drill data for holes in Press Release August 15, 2023

SectionHole IDUTM E NAD 83UTM N NAD 83Elevation (m)Azi (ᵒ)Dip (ᵒ)Depth (m)
120+50NEGS-23-16642893362734441398325-80558
GS-23-166-W142891062734721146314-81.51122
GS-23-168-W14285836273554816294-57.51281
117+50NEGS-23-16942903062736661495335-821335.8
GS-23-17042902662736601495312-741512

 

Qualified Person

The Qualified Person for this news release for the purposes of National Instrument 43-101 is the Company's President and CEO, Ken Konkin, P.Geo. He has read and approved the scientific and technical information that forms the basis for the disclosure contained in this news release.

QA/QC

Diamond drill core samples were prepared at MSA Labs' Preparation Laboratory in Terrace, BC and assayed at MSA Labs' Geochemical Laboratory in Langley, BC. Analytical accuracy and precision are monitored by the submission of blanks, certified standards and duplicate samples inserted at regular intervals into the sample stream by Tudor Gold personnel. MSA Laboratories quality system complies with the requirements for the International Standards ISO 17025 and ISO 9001. MSA Labs is independent of the Company.

About Treaty Creek

The Treaty Creek Project hosts the Goldstorm Deposit, comprising a large gold-copper porphyry system, as well as several other mineralized zones. As disclosed in the "NI-43-101 Technical Report for the Treaty Creek Project", dated April 28, 2023 prepared by Garth Kirkham Geosystems and JDS Energy & Mining Inc., the Goldstorm Deposit has an Indicated Mineral Resource of 23.37 Moz of AuEq grading 1.13 g/t AuEq (18.75 Moz gold grading 0.91 g/t, 2.18 Blbs copper grading 0.15 %, 112.4 Moz silver grading 5.45 g/t) and an Inferred Mineral Resource of 7.35 Moz of AuEq grading 0.98 g/t AuEq (5.54 Moz gold grading 0.74 g/t, 0.85 Blb copper grading 0.16 %, 45.08 Moz silver grading 5.99 g/t), with a pit constrained cut-off of 0.5 g/t AuEq and an underground cut-off of 0.7 g/t AuEq. The Goldstorm Deposit has been categorized into three dominant mineral Domains and several smaller mineral Domains. The CS-600 Domain largely consists of an intermediate intrusive stock and hosts the majority of the copper mineralization within the Goldstorm Deposit. CS-600 has an Indicated Mineral Resource of 9.86 Moz AuEq grading 1.10 g/t AuEq (6.22 Moz gold grading 0.70 g/t, 1.98 Blbs copper grading 0.32 %, 51.1 Moz silver grading 5.71 g/t) and an Inferred Mineral Resource of 3.71 Moz AuEq grading 1.19 g/t AuEq (2.32 Moz gold grading 0.75 g/t, 0.76 Blb copper grading 0.36 %, 18.71 Moz silver grading 6.01 g/t). The Goldstorm Deposit remains open in all directions and requires further exploration drilling to determine the size and extent of the deposit.

1 AuEq = Au g/t + (Ag g/t*0.0098765) + (Cu ppm*0.0001185)

About Tudor Gold

TUDOR GOLD CORP. is a precious and base metals exploration and development company with claims in British Columbia's Golden Triangle (Canada), an area that hosts producing and past-producing mines and several large deposits that are approaching potential development. The 17,913 hectare Treaty Creek project (in which TUDOR GOLD has a 60% interest) borders Seabridge Gold Inc.'s KSM property to the southwest and borders Newmont Corporation's Limited's Brucejack property to the southeast.

ON BEHALF OF THE BOARD OF DIRECTORS OF
TUDOR GOLD CORP.

"Ken Konkin"

Ken Konkin
President and Chief Executive Officer

For further information, please visit the Company's website at or contact:
Chris Curran
Head of Corporate Development and Communications
Phone: (604) 559 8092
E-Mail:

or

Carsten Ringler
Head of Investor Relations and Communications
Phone: 0
E-Mail:

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statements regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. "Forward-looking information" includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including the completion and anticipated results of planned exploration activities. Generally, but not always, forward-looking information and statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions, including among others, that the Company's planned exploration activities will be completed in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's plans or expectations include risks relating to the actual results of current exploration activities, fluctuating gold prices, possibility of equipment breakdowns and delays, exploration cost overruns, availability of capital and financing, general economic, market or business conditions, regulatory changes, timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.

The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.




Treaty Creek Section Areas – Plan View

To view an enhanced version of this graphic, please visit:



Goldstorm Deposit - Section 117+50 NE Viewing Northeast

To view an enhanced version of this graphic, please visit:



Goldstorm Deposit - Section 120+50 NE Viewing Northeast

To view an enhanced version of this graphic, please visit:

To view the source version of this press release, please visit

EN
15/08/2023

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on TUDOR GOLD CORP.

 PRESS RELEASE

Tudor Gold Announces Filing of Treaty Creek Project, NI 43-101 Technic...

Vancouver, British Columbia--(Newsfile Corp. - March 10, 2026) - Tudor Gold Corp. (TSXV: TUD) (FSE: H56) (the "Company" or "Tudor") reports it has filed a National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") technical report entitled "NI 43-101 Technical Report, Treaty Creek Project, British Columbia", with an effective date of November 30, 2025 (the "Treaty Creek Technical Report"). The Treaty Creek Technical Report is available under the Company's profile on SEDAR+ at and on the Company's website at -gold.com.The Treaty Creek Technical Report was prepared b...

 PRESS RELEASE

Tudor Gold Launches Preliminary Economic Assessment on Treaty Creek Pr...

Vancouver, British Columbia--(Newsfile Corp. - February 25, 2026) - Tudor Gold Corp. (TSXV: TUD) (FSE: H56) (the "Company" or "Tudor") is pleased to report it has retained Fuse Advisors Inc. of Vancouver, British Columbia, to prepare a preliminary economic assessment ("PEA") on placing the Treaty Creek Project's Goldstorm Deposit in production. PEA Terms of ReferenceFuse Advisors Inc. ("Fuse") has been retained to prepare a PEA examining the potential for an underground mining operation focused on the higher-grade gold mineralization at Treaty Creek's Goldstorm Deposit outlined in the 2026 Mi...

 PRESS RELEASE

Tudor Gold Grants Stock Options

Vancouver, British Columbia--(Newsfile Corp. - February 6, 2026) - Tudor Gold Corp. (TSXV: TUD) (FSE: H56) (the "Company" or "Tudor") is reports that it has granted stock options to directors, officers, and consultants of the Company to purchase an aggregate of 7,075,000 common shares in the capital of the Company at an exercise price of $1.26 per share, which expire on February 5, 2031. Following this stock option grant, the Company has a total of 37,953,810 stock options outstanding representing approximately 9.3% of the outstanding common shares of the Company. This stock option grant is su...

 PRESS RELEASE

Tudor Gold Announces Updated Mineral Resource Estimate for Treaty Cree...

Vancouver, British Columbia--(Newsfile Corp. - January 22, 2026) - Tudor Gold Corp. (TSXV: TUD) (FSE: H56) (the "Company" or "Tudor") is pleased to report an updated Mineral Resource estimate (the "2026 MRE") with higher-grade sensitivities for the Goldstorm Deposit at its flagship Treaty Creek Project located in the Golden Triangle, British Columbia. The 2026 MRE was prepared by Garth Kirkham, P.Geo. of Kirkham Geosystems Ltd. ("KGL") in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101").Treaty Creek 2026 MRE Highlights2026 MRE at a net sme...

 PRESS RELEASE

Tudor Gold Provides 2025 Year End Review and Strategy for 2026

Vancouver, British Columbia--(Newsfile Corp. - December 17, 2025) - Tudor Gold Corp. (TSXV: TUD) (FSE: H56) (the "Company" or "Tudor") is pleased to provide a review of 2025 milestones and its 2026 strategic objectives to advance its flagship Treaty Creek Project located in the Golden Triangle, British Columbia.2025 Treaty Creek Exploration Program Summary: Gold Resource Expansion and Demonstrated Continuity in the Goldstorm DepositTreaty Creek's Goldstorm Deposit was first discovered in 2016 with approximately 190,000 meters drilled at Goldstorm to date. The Goldstorm Deposit has an Indicate...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch