FFU F4 URANIUM CORP

F4 and UraniumX Announce Field Program Underway at Murphy Lake

Kelowna, British Columbia--(Newsfile Corp. - March 18, 2026) - F4 Uranium Corp. (TSXV: FFU) ("F4" or "the Company") is pleased to announce that the partner-funded ground EM geophysics program at Murphy Lake is now underway (see F4 news release dated February 17, 2026). The property is located 5 kilometres south of IsoEnergy's high-grade Hurricane Deposit and 4 kilometres east of Cameco's La Rocque Lake Uranium Zone.

The geophysics crew has mobilized to the highest-priority northernmost lines (Figure 1) near historic drill hole ML22-012. This hole is interpreted to have overshot the conductive basement target but returned strong uranium geochemistry just above the Athabasca unconformity, highlighted by 56 ppm U over 0.5 metres in sandstone. These lines will also test for an extension of the north-south conductive corridor where ML22-006 intersected 0.242% U₃O₈ in basement rocks within a 4.2-metre-wide deformation zone.

The new EM results will be integrated into the project model as the data is received and interpreted, helping to guide the upcoming drill program planned for late spring 2026.

The Murphy Lake work program is being fully funded by UraniumX Discovery Corp. in accordance with the terms of the Option Agreement to earn up to a 70% interest in the Murphy Lake Property (see F4 news release dated February 2, 2026). F4 will act as operator during the earn-in period.

About Murphy Lake:

F4's 609-hectare Murphy Lake Property is located in the north-eastern corner of the Athabasca Basin, 30 km northwest of Orano's McLean Lake deposits, 5 km south of IsoEnergy's Hurricane Uranium Deposit and 4 km east of Cameco's La Rocque Lake Uranium Zone where drill hole Q22-040 intersected 29.9% U3O8 over 7.0 m. The 2022 drill program at the Murphy Lake Property consisted of 14 drillholes totaling 6,850m; drill hole ML22-006 intersected 0.065% U3O8 over 2.5m from 322.5m to 324.5m, including 0.242% U3O8 over 0.5m.

Figure 1. Murphy Lake 2026 MLEM Ground Geophysical Program Map.

To view an enhanced version of this graphic, please visit:

Qualified Person

The technical information in this news release has been reviewed and approved on behalf of the Company by Sam Hartmann, P.Geo., President & COO of F4, and a qualified person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

This news release also refers to neighboring properties in which F4 Uranium has no interest, and the Qualified Person has been unable to verify the information from those properties. Mineralization on those neighboring properties is not necessarily indicative of mineralization on the Murphy Lake Property.

For additional information on the Murphy Lake Property, please refer to the National Instrument 43-101 Report titled "Technical Report For The Murphy Lake Project, NE Athabasca Basin, Saskatchewan, Canada" effective March 20, 2024, available at .

About F4 Uranium Corp:

F4 Uranium is a Canadian uranium exploration company focused on the Athabasca Basin in northern Saskatchewan Company is led by a management and exploration team with a legacy of discovery successes. The project portfolio includes 17 wholly owned properties totaling roughly 157,000 ha, many of which are near uranium deposits including Paladin's Triple R, NexGen Energy's Arrow and IsoEnergy's Hurricane projects.

The project portfolio includes 17 wholly owned properties totaling roughly 157,000 ha, many of which are near uranium deposits including Paladin's Triple R, Nexgen Energy's Arrow and IsoEnergy's Hurricane projects. The assets were spun out of F3 Uranium in 2024, where the technical and management team made their third, and more recently fourth uranium discoveries at Patterson Lake North and Broach Lake.

Contact Information

F4 Uranium Corp.
750-1620 Dickson Avenue
Kelowna, BC V1Y9Y2

Investor Relations
Telephone: 778 484 8030
Email:

ON BEHALF OF THE BOARD,
"Ray Ashley"
Raymond Ashley, CEO
F4 Uranium Corp.

Forward-Looking Statements

This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation, statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the suitability of the Properties for mining exploration, future payments, issuance of shares and work commitment funds, entry into of a definitive option agreement respecting the Properties, are "forward-looking statements". These forward-looking statements reflect the expectations or beliefs of management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or disapproved the contents of this press release, and do not accept responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit

EN
18/03/2026

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on F4 URANIUM CORP

 PRESS RELEASE

F4 and UraniumX Announce Field Program Underway at Murphy Lake

Kelowna, British Columbia--(Newsfile Corp. - March 18, 2026) - F4 Uranium Corp. (TSXV: FFU) ("F4" or "the Company") is pleased to announce that the partner-funded ground EM geophysics program at Murphy Lake is now underway (see F4 news release dated February 17, 2026). The property is located 5 kilometres south of IsoEnergy's high-grade Hurricane Deposit and 4 kilometres east of Cameco's La Rocque Lake Uranium Zone.The geophysics crew has mobilized to the highest-priority northernmost lines (Figure 1) near historic drill hole ML22-012. This hole is interpreted to have overshot the conductive b...

 PRESS RELEASE

F4 and UraniumX Announce Geophysics at Murphy Lake

Kelowna, British Columbia--(Newsfile Corp. - February 17, 2026) - F4 Uranium Corp (TSXV: FFU) ("F4" or "the Company") is pleased to announce plans to commence ground EM geophysics at Murphy Lake, 5 kilometers South of IsoEnergy's High-Grade Hurricane Deposit and 4 kilometers east of Cameco's La Rocque Lake Uranium Zone.EarthEx Geophysical Solutions will complete 4 lines totaling 9.2 line-kilometers of Moving Loop Electromagnetics; this MLEM will build on previous ground geophysics by tightening the survey line spacing - testing the areas around and between two known prospective conductor syst...

 PRESS RELEASE

F4 Identifies Multiple Prospective Trends at Grey Island

Airborne MT Provides Modern GeophysicsKelowna, British Columbia--(Newsfile Corp. - February 3, 2026) - F4 Uranium Corp (TSXV: FFU) ("F4" or "the Company") is pleased to announce that an airborne Mobile Magnetotellurics (Mobile MT) survey over the Grey Island Project in the southern Athabasca Basin has yielded very favorable geophysics results indicating multiple large scale linear resistivity features (Figure 1) which represent prospective corridors and provide promising target areas. The Grey Island Project is located 70km to the west of the Key Lake Mine owned by Cameco and Orano and 60km to...

 PRESS RELEASE

F4 Receives Approval for Murphy Lake Option Agreement

Kelowna, British Columbia--(Newsfile Corp. - February 2, 2026) - F4 Uranium Corp. (TSXV: FFU) ("F4" or "the Company") is pleased to announce that pursuant to its press release of July 29, 2025, the TSX Venture Exchange (the TSXV) has granted approval of the option agreement (the "Agreement"), with Stearman Resources Inc. (the "Purchaser") in which the Company has granted the Purchaser the exclusive option to acquire up to a 70% interest in the Company's Murphy Lake uranium property in Saskatchewan (the "Property").The Transaction required the Company to provide documents to the TSXV including...

 PRESS RELEASE

Airborne MT Points to Patterson Lake Corridor at Todd Lake

First Work Completed by F4 on the Flagship Todd Lake PropertyKelowna, British Columbia--(Newsfile Corp. - December 15, 2025) - F4 Uranium Corp (TSXV: FFU) ("F4" or "the Company") is pleased to announce that it has completed an airborne Mobile MagnetoTellurics (Mobile MT) survey over the southern portion of its Todd Lake Project, located in the southwestern Athabasca Basin. The survey identified possible extensions to the Patterson Lake Corridor (PLC) and the Carter Trends, within the Clearwater Domain. The PLC is a prolific conductive corridor which hosts both NexGen Energy's Arrow (20km east)...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch