KIP KIPLIN METALS INC.

Kiplin Metals Submits Exploration Permits for the Cluff Lake Road (“CLR”) Uranium Project in Saskatchewan

Kiplin Metals Submits Exploration Permits for the Cluff Lake Road (“CLR”) Uranium Project in Saskatchewan

VANCOUVER, British Columbia, May 18, 2023 (GLOBE NEWSWIRE) -- (TSX-V: KIP) (the "Company" or "Kiplin") announces the submission of exploration permits for its upcoming summer exploration program at its key . The permits are currently under review by the Saskatchewan Ministry of Environment for approval.

The CLR property is situated adjacent to F3 Uranium Corp.'s ("F3") (previously known as Fission 3.0) prominent Paterson Lake North (PLN) project. In November 2022, F3 uncovered the JR high-grade uranium zone, which recently reported intersections (refer to F3 press release dated February 6, 2023) in drill hole PLN22-038 of 11.0 meters averaging 4.20% triuranium octoxide, including a high-grade 4.5-meter interval averaging 9.8% U3O8. The JR uranium zone represents the newest basement-hosted uranium deposit in the Athabasca, similar to the Triple R uranium deposit owned by Fission Uranium Corp.

summer program, contracted to , will involve geophysical surveying focused on the central part of the property. The survey will target multiple prospective areas already identified within the CLR property, including:

  • Three parallel (South-Southeast) conductors spanning a width of one kilometre on F3's PLN property, referred to as the North Conductor Complex, which extend onto the western part of the CLR property.
  • Several other magnetic lineaments within the CLR property, both parallel and intersecting the North Conductor Complex trend.
  • Multiple Alpha Track radon gas sensor anomalies previously completed (2017) and spectrometer radioactivity anomalies detected by the Company in 2022 (refer to Press Release, November 23, 2022). Background radioactivity readings obtained using a handheld Radiation Solutions RS-125 Super-SPEC gamma-ray spectrometer (*) range between 20-50 counts per second (cps), with over 100 anomalous boulders in the 100-500 cps range identified.

(*) The spectrometer readings provided in this news release were obtained using a handheld Radiation Solutions RS-125 Super-SPEC gamma-ray spectrometer, measuring in counts per second. It is important to note that spectrometer readings are not directly or uniformly correlated to uranium grades of the measured rock sample and should be considered as an initial indication of radioactive material presence only.

The Company believes that the CLR property's combination of multiple EM (electromagnetic) conductors, magnetic lineaments, radon gas, and radioactivity anomalies make it a highly prospective location for discovering a basement-hosted uranium deposit.

intends to conduct its exploration activities in compliance with the strictest environmental management standards and maintain open communication with local stakeholders, including indigenous communities, throughout the permitting, exploration, and closure phases.

The Company will share updates on the progress of its permit approval and work program as information becomes available. emphasizes that findings and observations on neighbouring properties do not guarantee the presence of similar mineralization or geological features on their properties.

Dr. Peter Born, PGeo, the designated qualified person as defined by National Instrument 43-101, is responsible for and has approved the technical information contained in this release.

About Kiplin Metals Inc.

is a mineral exploration firm dedicated to identifying and developing high-potential mineral exploration opportunities. By advancing our projects from discovery through production, we strive to create significant value for our shareholders. This comprehensive approach enables Metals to generate outstanding shareholder returns throughout the entire mining process. This vertically integrated strategy allows to achieve exceptional shareholder value through the entire life-cycle of the mining process.

Cluff Lake Road Uranium Project. has the right to earn a one-hundred percent interest in the (referred to as the ""). The spans approximately 531 hectares in the southwestern region of the Athabasca Basin in northern Saskatchewan, an area known for recent discoveries, including the Arrow and Triple R Uranium deposits. is situated 5 km east of Cluff Lake Road (Highway 955), which connects to the historic Cluff Lake Mine, a site that has produced an estimated 62,000,000 lbs of yellowcake uranium in the past.



For further information, contact the Company at , or visit the Company’s website at .

On behalf of the Board,

For further information, contact the Company at 604-622-1199.

On behalf of the Board of Directors,

“Peter Born”

Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may include forward-looking statements that are subject to risks and uncertainties. All statements within, other than statements of historical fact, are to be considered forward-looking. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in forward-looking statements. There can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. We do not assume any obligation to update any forward-looking statements except as required under the applicable laws.

Contact Data

CONTACT:

Alex Zertuche

For E.S.T Office Hours, Call 1 416-477-0587

A photo accompanying this announcement is available at



EN
18/05/2023

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on KIPLIN METALS INC.

 PRESS RELEASE

Kiplin Metals Comments on Uranium Spot Price Trends

Kiplin Metals Comments on Uranium Spot Price Trends VANCOUVER, British Columbia, June 19, 2023 (GLOBE NEWSWIRE) -- Kiplin Metals Inc. (TSX-V: KIP) (the “Company” or “Kiplin”) would like to provide its outlook on the significant price increase observed in the uranium market. The spot price of U3O8 uranium has surged more than 120% since the beginning of 2020. The Company acknowledges the positive impact of this price upturn, which reflects the growing global demand for clean and sustainable energy sources. As the international community focuses on transitioning towards a low-carbon future...

 PRESS RELEASE

Kiplin Metals Addresses Activity Surrounding the Cluff Lake Road (“CLR...

Kiplin Metals Addresses Activity Surrounding the Cluff Lake Road (“CLR”) Uranium Project in Saskatchewan VANCOUVER, British Columbia, June 05, 2023 (GLOBE NEWSWIRE) -- (TSX-V: KIP) (the “Company” or “Kiplin”) has observed a significant increase in activity surrounding its  uranium project. Located in Saskatchewan, the project sits in a highly prospective area with neighbouring companies Orano Canada, Cameco Corp., Stallion Discovery Corp., and Canalaska Uranium Ltd. One noteworthy development is the proximity of the to F3 Uranium Corp.’s (formerly Fission 3.0) Paterson Lake North (...

 PRESS RELEASE

Kiplin Metals Submits Exploration Permits for the Cluff Lake Road (“CL...

Kiplin Metals Submits Exploration Permits for the Cluff Lake Road (“CLR”) Uranium Project in Saskatchewan VANCOUVER, British Columbia, May 18, 2023 (GLOBE NEWSWIRE) -- (TSX-V: KIP) (the "Company" or "Kiplin") announces the submission of exploration permits for its upcoming summer exploration program at its key . The permits are currently under review by the Saskatchewan Ministry of Environment for approval. The CLR property is situated adjacent to F3 Uranium Corp.'s ("F3") (previously known as Fission 3.0) prominent Paterson Lake North (PLN) project. In November 2022, F3 uncovered...

 PRESS RELEASE

Kiplin Metals Set to Begin Exploration Program at Cluff Lake Road Uran...

Kiplin Metals Set to Begin Exploration Program at Cluff Lake Road Uranium Project in Saskatchewan VANCOUVER, British Columbia, May 10, 2023 (GLOBE NEWSWIRE) -- (TSX-V: KIP) ("Kiplin" or the "Company") is delighted to announce the upcoming launch of its summer geophysical program at the situated in northwestern Saskatchewan, scheduled for June 2023. The Company's geological team is set to receive the necessary permit by the end of May and aims to mobilize on-site by June. lies in a region with strong prospects for uranium deposits. summer program will include at least 8 line-kilometre...

 PRESS RELEASE

Kiplin Metals Seeks Geophysical Permits for the Cluff Lake Road (“CLR”...

Kiplin Metals Seeks Geophysical Permits for the Cluff Lake Road (“CLR”) Uranium Project in Saskatchewan VANCOUVER, British Columbia, April 26, 2023 (GLOBE NEWSWIRE) -- (TSX-V: KIP) (the “Company” or “Kiplin”) is pleased to declare that its consultants, Grander Exploration, will be applying for the required exploration permits for the Company’s summer geophysical program at the (CLR) uranium project in northwestern Saskatchewan. The belonging to the is encircled by F3 (“F3”) Uranium Corp.'s (formerly Fission 3.0) high-profile Paterson Lake North (PLN) project. F3 announced the discove...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch