MAHA A Maha Energy

Maha Energy AB Announces Filing of Third Quarter Report & Live Webcast

Maha Energy AB Announces Filing of Third Quarter Report & Live Webcast

Maha Energy AB (publ)
Strandvägen 5A

SE-114 51 Stockholm

                                   

Press release

Stockholm

25 November 2019

                                                                                                  

Maha Energy AB Announces Filing of Third Quarter Report & Live Webcast

Maha Energy AB (publ) (“Maha” or the “Company”) is pleased to announce its Third Quarter results.  The report is attached to this press release and available on the Company’s website at

Third Quarter 2019

  • Daily oil & gas production for Q3 2019 averaged 3,593 BOEPD (Q3 2018: 1,565 BOEPD).
  • Effective August 1, 2019, the Company grew its Proven (1P) and Proven plus Probable (2P) reserves, by 14% and 62% respectively, at the Tie Field in Brazil.
  • During the quarter, the Maha-1 well on the Tartaruga Field was successfully drilled with production testing operations to follow.
  • Revenue of USD 16.1 million (Q3 2018: USD 9.0 million)
  • Operating netback of USD 12.0 million or USD 38.22 per BOE (Q3 2018: USD 6.6 million or USD 46.17 per BOE)
  • EBITDA of USD 10.7 million (Q3 2018: USD 5.4 million)
  • Net result of USD 6.6 million (Q3 2018: USD 3.2 million)
  • Basic Earnings per share of USD 0.07 (Q3 2018: USD 0.03)
  • Diluted Earnings per share of USD 0.06 (Q3 2018: USD 0.03)

      

Nine Months Ended 30 September 2019

  • Daily oil & gas production for the nine months 2019 3,004 BOEPD (2018: 1,585 BOEPD).
  • Revenue of USD 41.9 million (2018: USD 25.5 million)
  • Operating netback of USD 31.7 million or USD 40.38 per BOE (2018: 17.5 USD million or 40.70 USD per BOE)
  • EBITDA of USD 27.5 million (2018: USD 13.9 million)
  • Net result for the period of USD 17.0 million (2018: USD 7.4 million)
  • Basic Earnings per share of USD 0.17 (2018: USD 0.08)
  • Diluted Earnings per share of USD 0.16 (2018: USD 0.07)
  • Cash and cash equivalents balance of USD 20.4 million (2018: 22.3 million).

      

Financial Summary

(TUSD, unless otherwise noted)Q3 2019Q2 2019Q1 2019Q4 2018Q3 2018Nine Months 2019Nine Months2018FY 2018
Net Daily Production (BOEPD)3,5932,7392,6692,4541,5653,0041,5851,804
Revenue16,06814,09811,75112,5959,04941,91725,53738,132
Operating netback12,01710,6689,0299,4366,55331,71417,48126,917
EBITDA10,6639,1887,6638,4865,39227,51413,91822,404
Net result for the period6,5706,1574,24818,26713,21316,9757,37825,645
Earnings per share – Basic  (USD)0.070.060.040.190.030.170.080.26
Earnings per share – Diluted (USD)0.060.060.040.170.030.160.070.25
Cash and cash equivalents20,42120,50419,76820,25522,29220,42122,29220,255

Letter to shareholders

Dear Friends and Fellow Shareholders of Maha Energy AB,

Notwithstanding the recently announced reduction in the estimated 2019 annual production volumes, the third quarter was very positive for Maha with many significant ‘bright spots”.

Of particular note:

- the drilling and completing of the Attic well at the Tie Field resulted in a 62% increase in Proven and Probable (2P) reserves from 10.734 MMbbl of oil to 17.365 MMbbl of oil which nearly doubled the predicted plateau production rate at the Tie field from 3 to almost 6 years;

- the successful drilling of the Maha -1 well with better than expected indications of 72 m of net pay, that will be tested using a smaller and ‘fit for purpose’ workover rig; and,

- final approval and commissioning of Petrobras’ second receiving terminal at Comboata that now takes delivery of 750 BOPD of Tie Field oil. 

2019 Annual Average Production Rates were reduced to 2750 BOPD – 2900 BOPD

Subsequent to this reporting period, Maha’s 2019 estimated annual average production rate was unfortunately revised for a second time this year due to delays in start-up and commissioning of gas handling and disposal equipment at the Tie Field.  A string of simultaneous events culminated in requiring to reduce oil production to prevent exceeding Government imposed flaring restrictions during the last 2 months of the year.  This revision is in no way indicative of the Tie Field’s current or future oil producing capacity and we are working very hard to ”get back on track” to earlier expectations.

2P Reserves up by 62% at the Tie Field – now at 17.365 Million Barrels of Oil

By far the biggest news of the third quarter were the results of the re-mapping of the Tie structures following the results of the recently drilled ‘Attic Well’.  Remapping of the structure resulted in a substantially larger structure and more “in situ” oil volumes.  With these increased reserves the Field Development Plan will be revised to include more wells, and a longer plateau production rate. To this end, the Company is commencing a new field modelling project for this expansion.  Notably it appears clear the Tie Field production plateau of 4,850 BOPD will extend by up to 3 years resulting in a significant corresponding positive effect on the Tie Field’s, and therefore the Company’s, Net Present Value. 

Petrobras Comboata Terminal Commissioned

After nearly a year of ‘to and from’ -the Comboata Oil Terminal commenced taking oil deliveries from the Tie Field.  Following 2 weeks of “teething” issues, the Terminal now takes its daily allotment of 750 BOPD and Petrobras is now therefore able to receive a total of 1,850 BOPD from the Tie Field at two terminals. With the local refinery currently taking up to 2,200 BOPD – the Company has off-take capacity for up to 4,050 BOPD for Tie Field oil right now.  This is a significant increase from July 2017 when the Tie Field was purchased and offtake was limited to 1,100 BOPD. 

The local refinery still awaits a final Government permit to utilize its new expansion upon which the Company can increase its deliveries from the Tie field by a further 800 BOPD. At that point - Maha will be able to sell and deliver   4,850 BOPD from the Tie field.

Tartaruga

Maha-1 (7-TTG-3D-SES) well was spudded on 12 July, 2019 and total depth was reached on 3 October, 2019.  After an extensive coring and electric logging program, initial results show that all the Penedo sandstone stringers are continuous and a total of 72 m. of net pay has been calculated.  The Drilling rig was demobilized allowing for a smaller workover rig (“test rig”) to be mobilized.  This test rig is expected at the Tartaruga site towards the end of November, after which the Maha-1 well will be extensively tested over a period of up to 90 days.  While the test rig is at the Tartaruga site, the 107D horizontal well will finally be cleaned out and tested properly.  At the moment, the plan is to test 107D before commencing testing of the Maha-1 well. 

 

As is apparent, there is a lot going on and much to be excited about.  The increase in 2P reserves at the Tie field is significant to the fundamental value of the Company.  The facility improvement investments already made and the newly extended Tie Field production plateau secures long term positive cash flow for the Company.  The testing of new Penedo sands at Tartaruga are, if positive, a gateway to continued solid organic growth!

I continue to be grateful to all Maha employees for their hard work and dedication that has made all this possible.

 “Jonas Lindvall” Managing Director

Q3 Webcast



There will be a live webcast tomorrow, 26 November 2019 at 16:00 CET (Stockholm time) to review and discuss the Third Quarter results and provide an operational update. The webcast will be broadcast live on Nyhetsbyrån Direkts Youtube Channel and hosted by Laikas’ Mr. Mats Jonsson and will feature Maha’s CEO Jonas Lindvall and CFO Andres Modarelli. For further details please consult the Company’s website: 

Adviser

Certified Advisor: FNCA Sweden AB, , Telephone: 9.

For more information, please contact:          





Jonas Lindvall (CEO)

Tel:         

Email:

or

Ron Panchuk (EVP)

Tel:         

Email:

or

Andres Modarelli (CFO)

Tel:

Email:

Miscellaneous      

This information is published in accordance with the EU Market Abuse Regulation. The information was submitted for publication through the agency of the contact persons set out above on 25 November 2019, at 1:00 am CET.

Maha in Brief

Maha Energy AB is a Swedish public limited liability company. FNCA Sweden AB has been engaged as Certified Adviser. The Company’s auditors are Deloitte. The Company’s predecessor Maha Energy Inc. was founded in 2013 in Calgary, Canada, by Jonas Lindvall and Ron Panchuk. In May 2016, the new group was formed with Maha Energy AB as parent company for purposes completing an initial public offering on the Nasdaq First North Growth Market stock exchange. Jonas Lindvall, CEO and Managing Director, has 26 years of international experience in the oil and gas industry, starting his career with Lundin Oil during the early days of E&P growth.  After 6 years at Shell and Talisman, Jonas joined, and helped secure the success of, Tethys Oil AB. Maha’s strategy is to target and develop underperforming hydrocarbon assets on global basis. The Company operates three oil fields, Tartaruga and Tie in Brazil and LAK Ranch, in Wyoming, U.S. For more information, please visit our website .

Important Information

Publication or distribution, directly or indirectly, of this press release could in some jurisdictions be subject to restrictions according to law and recipients of this press release, or part of it, are required to inform themselves of, and comply with, such legal restrictions. This press release is not for release, publication or distribution, directly or indirectly, in or into Australia, Canada, Hong Kong, Japan, New Zealand, Singapore, South Africa, Switzerland or the United States, or in any other jurisdiction where distribution of this press release could be illegal or subject to legal restrictions. Copies of this press release are not being made and may not be distributed or sent, in whole, or part, directly or indirectly, in violation of such restrictions. Failure to comply with such restrictions may constitute a criminal act under the United States Securities Act of 1933 (as amended) ("Securities Act") or applicable laws in other jurisdictions.






1 Q4 2018 Net result includes USD 11.3 million of recognized deferred tax recovery and USD 0.8 million of other gains.

 

 

Attachments

EN
25/11/2019

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Maha Energy

Maha Capital AB: 1 director

A director at Maha Capital AB sold 1,154,330 shares at 8.000SEK and the significance rating of the trade was 68/100. Is that information sufficient for you to make an investment decision? This report gives details of those trades and adds context and analysis to them such that you can judge whether these trading decisions are ones worth following. Included in the report is a detailed share price chart which plots discretionary trades by all the company's directors over the last two years clear...

ABGSC Oil & Oil Services Research ... (+3)
  • ABGSC Oil & Oil Services Research
  • John Olaisen
  • Martin Mauseth
Stephane Foucaud
  • Stephane Foucaud

AUCTUS ON FRIDAY - 19/07/2024

Condor Energies (CDR CN)C: Signing first LNG framework agreement in Kazakhstan – Condor has signed a first LNG Framework Agreement for the utilization of LNG to fuel Kazakhstan’s rail locomotives. The agreement was also signed by Kazakhstan Temir Zholy (KTZ), the national railway operator of Kazakhstan and Wabtec Corporation, a U.S. based locomotive manufacturer with existing facilities in Kazakhstan. KTZ and Wabtec previously signed a memorandum of understanding which includes modernization wor...

Stephane Foucaud
  • Stephane Foucaud

AUCTUS ON FRIDAY - 21/06/2024

AUCTUS PUBLICATIONS ________________________________________ Arrow Exploration (AXL LN/CN)C: target price of £0.65 per share: Flow rate of high impact horizontal well above expectations – The first CN Horizontal well (CNB HZ-1) from the Carrizales Norte B pad has been on production since 14 June at a rate of 3,150 bbl/d (~1.6 mbbl/d net) with less than 1% water cut while still recovering load fluid. The flow rate is currently constrained with the ESP operating on the minimum setting. The flow ra...

Stephane Foucaud
  • Stephane Foucaud

AUCTUS ON FRIDAY - 31/05/2024

AUCTUS PUBLICATIONS ________________________________________ Arrow Exploration (AXL LN/AXL CN)C; target price of £0.65 per share: All eyes on the first horizontal well at Carrizales Norte – The 1Q24 production of 2,730 boe/d was close to our expectations. Arrow’s cash position of US$11.6 mm was also in line. The first water disposal well at RCE is being brought into production and the conversion of the CN-4 well is currently waiting regulatory approval. These two disposal wells are very importa...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch