MAHA A Maha Energy

Maha Energy announce December 31, 2021 Reserve and Resource Report

Maha Energy announce December 31, 2021 Reserve and Resource Report

Chapman Petroleum Engineering Ltd. (“Chapman”) has completed their annual reserve and resource determination for Maha Energy AB (publ) (“Maha” or the “Company”). The Company’s (“2C”) Contingent Resources volumes have increased by 49%, the Proven plus Probable reserves (“2P”) and 2C Contingent Resources volume are up by 2%. The 2P reserve volumes are down by 23% compared to the previous year. The reduction in 2P reserves does not affect the Company’s near to medium term production volumes, nor the resulting cashflows. The Company’s 2022 production guidance of 4,000 - 5,000 BOEPD remains.

The results of the recently tested (post December 31, 2021) and very positive Tie-4 well have not been included in the 2021 reserves and resource update and are expected to be included as part of the 2022 reserve and resource volumes.

The 2021 reserves are impacted by the 2021 drilling and testing results of the Tartaruga-3 well, produced volumes in Brazil and USA, seismic and reservoir modelling revisions at the Tie field in Brazil, as well as non-core lease relinquishments in USA. In Oman, both 2P reserves and 2C Contingent Resources have increased significantly due to seismic and petrophysical evaluations conducted during 2021. 

Maha Reserves and Resources1 as of 31 December, 2021

2021 Maha Energy AB Company Gross Reserves before income tax
(million barrels)
 TieTartaruga2Illinois BasinOmanLAKTotal
1P9.066.281.830.470.1117.75
2P12.688.643.341.528.8134.99
3P15.0010.933.522.4714.2446.17



2021 Maha Energy AB Company Gross Conventional (Sales) Natural Gas Reserves before income tax
(billion Standard Cubic Feet)
 TieTartaruga2Illinois BasinOmanLAKTotal
1P6.543.07   9.62
2P9.154.23   13.38
3P10.835.36   16.19



Resource Category

‘Mafraq” Block 70 Oman
2021 Volume

(million barrels)
1C23.59
2C33.41
3C60.32



[1] Volumes are Gross Working Interest volumes and are expressed before royalties, Government allocations and taxes.

2 The Tartaruga Concession Agreement expires in 2025 but provides mechanisms for extension based on the continued productivity of the field. Management is confident that such an extension will be approved, and Chapman has classified the recoverable volumes as reserves based on these mechanisms. Maha has a 75% Working Interest in the Tartaruga concession.

3 Chapman Petroleum Engineering Ltd. uses the following oil price forecast for Brent Spot in $USD/STB:

2022202320242025202620272028
$76.44$73.84$72.28$73.73$75.20$76.70$78.24

The average gas price for the gas reserves at Tie Field over the next five years is forecasted by Chapman to be around $1.00 USD/MSCF.

The reserves review and issuance of this reserve report for the Company was made by the independent petroleum engineering consultants Chapman Petroleum Engineering Ltd., Calgary, Canada. The evaluation was carried out in accordance with standards set out in the Canadian Oil and Gas Evaluation Handbook, the professional practice standard under their Permit to Practice with APEGA and under the guidelines of the European Securities and Markets Authority (ESMA). The report has been prepared and supervised by a “Qualified Reserves Evaluator”.

Maha Energy AB, through its subsidiaries owns and operates a legal and beneficial 75% Working Interest (WI) in the SES-107D Block (Tartaruga) onshore Sergipe State Brazil, a 99% WI in the LAK Ranch heavy oil field in Wyoming USA, a 100% Working Interest (WI) in the Tie Field onshore Bahia State Brazil, an initial 100% WI in the Block 70 Mafraq field under the Exploration and Production Sharing Agreement with the Government of Oman and approximately 96% WI in the acreage in the Illinois Basin.

This information is such information as Maha Energy AB (publ) is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact person set out below, at 13:15 CET on 31 January, 2022.

For more information, please contact:        

Jonas Lindvall (CEO)

Tel:       



Victoria Berg (Investor Relations)

Tel:       



About Maha

Maha Energy AB (publ) is a listed, international upstream oil and gas company whose business activities include exploration, development and production of crude oil and natural gas. The strategy is to target and develop underperforming hydrocarbon assets on global basis. Maha operates four oil fields: Tartaruga and Tie in Brazil, Powder River (LAK Ranch) and Illinois Basin in the United States.The shares are listed on Nasdaq Stockholm (). The head office is in Stockholm, Sweden with a technical office in Calgary, Canada, as well as operations offices in Grayville, Illinois, USA and Rio de Janeiro, Brazil. For more information, please visit our website .

Attachment



EN
31/01/2022

Underlying

To request access to management, click here to engage with our
partner Phoenix-IR's CorporateAccessNetwork.com

Reports on Maha Energy

Maha Capital AB: 1 director

A director at Maha Capital AB sold 1,154,330 shares at 8.000SEK and the significance rating of the trade was 68/100. Is that information sufficient for you to make an investment decision? This report gives details of those trades and adds context and analysis to them such that you can judge whether these trading decisions are ones worth following. Included in the report is a detailed share price chart which plots discretionary trades by all the company's directors over the last two years clear...

ABGSC Oil & Oil Services Research ... (+3)
  • ABGSC Oil & Oil Services Research
  • John Olaisen
  • Martin Mauseth
Stephane Foucaud
  • Stephane Foucaud

AUCTUS ON FRIDAY - 19/07/2024

Condor Energies (CDR CN)C: Signing first LNG framework agreement in Kazakhstan – Condor has signed a first LNG Framework Agreement for the utilization of LNG to fuel Kazakhstan’s rail locomotives. The agreement was also signed by Kazakhstan Temir Zholy (KTZ), the national railway operator of Kazakhstan and Wabtec Corporation, a U.S. based locomotive manufacturer with existing facilities in Kazakhstan. KTZ and Wabtec previously signed a memorandum of understanding which includes modernization wor...

Stephane Foucaud
  • Stephane Foucaud

AUCTUS ON FRIDAY - 21/06/2024

AUCTUS PUBLICATIONS ________________________________________ Arrow Exploration (AXL LN/CN)C: target price of £0.65 per share: Flow rate of high impact horizontal well above expectations – The first CN Horizontal well (CNB HZ-1) from the Carrizales Norte B pad has been on production since 14 June at a rate of 3,150 bbl/d (~1.6 mbbl/d net) with less than 1% water cut while still recovering load fluid. The flow rate is currently constrained with the ESP operating on the minimum setting. The flow ra...

Stephane Foucaud
  • Stephane Foucaud

AUCTUS ON FRIDAY - 31/05/2024

AUCTUS PUBLICATIONS ________________________________________ Arrow Exploration (AXL LN/AXL CN)C; target price of £0.65 per share: All eyes on the first horizontal well at Carrizales Norte – The 1Q24 production of 2,730 boe/d was close to our expectations. Arrow’s cash position of US$11.6 mm was also in line. The first water disposal well at RCE is being brought into production and the conversion of the CN-4 well is currently waiting regulatory approval. These two disposal wells are very importa...

ResearchPool Subscriptions

Get the most out of your insights

Get in touch